Attachment 1 Statement of Work - Dewatering Pumps.pdf
PDF 76 KB Posted
- Attached to
- Dewatering Pumps
- Solicitation number
- 70LGLY23QGLB00026
About this file
This solicitation is seeking quotes for three dewatering pumps, supplies, and training to be delivered to the Federal Law Enforcement Training Center no later than July 3, 2023. The solicitation specifies the brand name Global Pump SoundGuard 24GSTDPICT4S1SG or equal, and requests that bidders provide detailed specifications and literature with their submissions. The contract will be firm-fixed price. This is a set-aside for small businesses under NAICS code 333914. Questions are due by May 3rd and will be answered via amendment on SAM.GOV. To be eligible for award, bidders must agree to FAR 52.222-50 and register in SAM, maintaining registration through final payment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 Specification.pdf | ||
| Attachment 4 Pump Dimensions.pdf | ||
| 70LGLY23QGLB00026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
FLETC, Glynco Emergency Dewatering Pumps
Installation of Purchased Dewatering Pumps
Contractor shall supply all equipment, tools, supplies, and labor necessary to deliver and setup 3 (24GSTDPICT4S1SG) dewatering pumps, to include fuel tanks and all piping included in quote. Float controls are included in the price.
Contractor shall coordinate all with the COR (Facility Operations Branch Chief) during normal working hours (7:30 AM – 4:30 PM Monday – Friday), to exclude all federal holidays.
COR Jason E. Benjamin
(912) 267-3278 (Office) (912) 689-8457 (Mobile) jason.e.benjamin@fletc.dhs.gov
Delivery: 3 July 2023
Contractor shall provide detailed operational training within forty-eight (48) hours of completion.
Contractor will follow all FLETC, Glynco requirements concerning procedures as required for hazardous waste removal and disposal requirements.
Contractor shall remove and dispose of any equipment and materials that they or their subcontractors no longer need after ensuring with the COR that the facility does not want to retain it. All trash will be removed daily and all areas that work was conducted in will be placed back to the same condition as it was prior to work being performed.
Government will furnish a forklift (10k capability) and an operator, for offloading and placing equipment at FLETC, Glynco.