This is a Statement of Work for repairing ADA compliant doors at Building 1904 at Shaw Air Force Base, South Carolina, dated November 21, 2024. The scope includes replacing two exterior doors with new pre-finished 3'0"x 6'8" metal doors with metal welded frames, which requires removing conduit and installing duplex switch for the front door, installing standard door hardware (panic bar, heavy duty door closer, door stop, doorknob with lock and "Best" core), metal thresholds, finishing walls and door frames to match existing conditions, and relocating fire extinguishers.
The contractor must provide all management, tools, supplies, equipment, labor, and required permits, following UFC, UFGS, IBC, IPC, SCDHEC, NEC, NESC, NFPA, and other applicable standards. Key requirements include a minimum one-year warranty, daily reports in RAKEN format with pictures of work performed, documentation of existing conditions before work begins, and submission of completed DD1354 forms with progress payments. The contractor must coordinate utility outages with Civil Engineering Squadron, and no asbestos or lead-based paint is present in the demolition areas. All finishes must be approved by the project inspector prior to installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought Notice - B1904 ADA Compliant Doors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR ADA COMPLIANT DOORS B1904
Attachment 1, Statement of Work
VLSB 25-0013
STATEMENT OF WORK
FOR
REPAIR ADA COMPLIANT DOORS B1904
21 Nov 24
PROJECT: VLSB 25-0013
SCOPE OF WORK:
Provide all planning, labor, equipment and materials and perform all operation necessary to replace 2 exterior doors at building 1904 as listed below and shown on attached drawings. Work shall include, but shall not be limited to, the following:
For front door only:
• Remove the one conduit and plug junction box. Pull conductors into existing conduit and install duplex switch in existing conduit making room to cut metal panel for door frame.
On both doors:
• Saw cut and install new pre-finished 3’0”x 6’8” metal door with metal welded frame.
• Install standard door hardware along with:
o panic bar, heavy duty door closer, door stop, doorknob with lock and “Best” core.
• Install metal threshold.
• Finish wall and door frame both sides to match current/existing conditions.
• Relocate fire extinguisher.
GENERAL DESIGN AND CONSTRUCTION NOTES:
Any references to State Government, Federal Government, or Industry standards or specifications made herein shall form a part of this specification to the extent referenced thereto and all materials and workmanship under this contract shall comply with or exceed these standards and references.
All referenced standards shall be the latest edition.
Where specific part numbers or manufactures are referenced, it shall be understood that the contractor may use an approved equal.
All manufactured equipment and products shall be new materials in good condition and installed as per manufacturer's latest printed instructions, unless specified otherwise herein.
The Contractor is responsible for protection of existing facilities equipment from damage during installation and testing operations.
Contractor shall take into account the special treatment of hazardous waste, as well as the environmental implications related to building demolition management (i.e. fluorescent lighting tubes, t-stats, etc.). Every effort shall be made to recycle eligible materials, and those not suitable, shall be disposed of off base in accordance with all (SCDHEC) South Carolina Department of Health and Environmental Control regulations.
Draf t
VLSB 25-0013
Ensure that any demolition, utility cut and capping, and debris removal service performed at Shaw AFB, South Carolina in completed in such a manner that will restore a neat and professional appearance of base areas.
The facility/area shall be cleaned in its entirety, including exterior areas, before being returned the government.
WARRANTY:
Contractor shall furnish a minimum one year warranty against defects in material and workmanship starting on the final inspection date.
GENERAL INFORMATION:
The contractor shall provide all management, tools, supplies, equipment, labor, and applicable licenses and permits necessary to complete the requirements within. All work shall be done in strict accordance with this Statement of Work and subject to the terms and conditions of the contract and in accordance with (UFC) Unified Facilities Criteria, Unified Facilities Guide Specifications (UFGS), the International Building Code (IBC), International plumbing code (IPC), South Carolina Department of Health and Environmental Control (SCDHEC), National Electrical Code (NEC), National Electrical Safety Code (NESC), National Fire Protection Association (NFPA), EPA 402-K-01-001 (2008), South Carolina Department of Transportation (SCDOT), South Carolina Department of Health and Environmental Control (SCDHEC) Shaw Air Force Base Design and Construction Standards, Change 2, 21 Aug 2018 and all other applicable codes.
Contractor is responsible for verifying all dimensions, quantities and square footages. All dimensions, quantities and square footages included are approximations. Construction and demolition shall be in strict accordance with the Shaw Air Force Base Design and Construction Standards. The information provided in this Statement of Work (SOW), the provided drawings, and the requirements of the Shaw Air Force Base Design and Construction Standards shall be determined to be the minimum standards required in this project.
The contractor shall document/take pictures of existing conditions in all areas in which work shall occur prior to starting work to include interior and exterior of the project site. UFC’s take precedence over all standards, codes and Shaw AFB Design Standards and requirements that pertain to the work within this SOW.
During construction, the contractor shall take care not to damage existing structures, etc. that will not be replaced as part of this contract. Contractor shall be responsible for the temporary support of all devices as required to perform work. Any demolition work that needs to be accomplished to complete the contract is the responsibility of the contractor. All material shall be installed per manufacturers’ recommendations. All items listed in the SOW are to be supplied and installed by the contractor unless otherwise noted. The contractor shall be responsible for removing and reinstalling or relocating any obstructions, utilities, or components that will impede the work to be accomplished in this SOW.
VLSB 25-0013
All finishes shall be presented to the project inspector as one submittal for selection and approval prior to installation. All material that could be discontinued shall be on-site, i.e. carpet and tile prior to starting project so there will be no difference in color.
All Contractors shall be responsible for submitting a completed DD1354 (AUG 2013 edition, PDF file) with each progress payment request (beginning at 50% construction completion). This form shall be marked "Draft" until the Contractor has reached approximately 90% completion, or when it has been determined that funding will not be adjusted due to modifications. The Contractor shall have a reviewed and accepted DD1354 submitted to the Government Inspector two (2) weeks prior to the scheduled final inspection date (i.e. Placed In Service Date). This reviewed and accepted DD1354 shall be marked "Interim" until the final inspection occurs.
PERMITS:
The contractor shall pay for and obtain any required permits. The contractor shall act in accordance with this Statement of Work, SCDHEC, Federal, and Shaw AFB guidelines.
WORKING CONDITIONS:
The Contractor shall take all precautions to insure that his operations are conducted in a manner as to minimally interfere with the normal operations of the base and the safety and convenience of the base personnel. The contractor shall coordinate utility outages with the Civil Engineering Squadron (CE) service call and the user.
ASBESTOS/LEAD BASED PAINT:
Selective Building Material System Demolition: No asbestos or lead based paint is present.
DAILY REPORTS:
The contractor shall provide the government with an electronic copy of each dump receipt along with the daily report by 0800 the following work day. All daily reports will be submitted in RAKEN format and shall include pictures of work performed for each day.
END OF STATEMENT OF WORK