Federal Energy Regulatory Commission – Office of Enforcement BPAT Equivalent ATC Data via OATI

Statement of Work

1. SCOPE

Acquire an annual subscription from Open Access Technology International, Inc (OATI) to append Bonneville Power Administration Transmission's (BPAT) Equivalent Available Transfer Capability (Equivalent ATC) and Equivalent Total Transfer Capability (Equivalent TTC) data to the webFERC database solution. webFERC is an OATI-hosted database environment that the Commission has contracted OATI to provide since 2013. webFERC currently hosts the Commission’s main source of eTag1, Transmission Service Request (TSR) and Available Transfer Capacity (ATC)2 subscriptions data.

2. BACKGROUND

The Federal Energy Regulatory Commission (FERC) is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil. FERC’s Mission is to ensure reliable, efficient, and sustainable energy for consumers. Fulfilling this mission involves pursuing two primary goals:

Ensure that rates, terms and conditions are just, reasonable and not unduly discriminatory or preferential.

Promote the development of safe, reliable and efficient energy infrastructure that serves the public interest.

In an effort to support the first goal, the Commission protects consumers through market oversight and surveillance; assuring compliance with tariffs, rules, regulations, and orders; detecting, auditing, and investigating potential violations; and developing and formulating policies and regulations to address emerging issues. The Commission employs various methods in these activities, including:

Developing surveillance procedures to detect potential manipulation, anticompetitive behavior, and other anomalous activity.

Identifying potential subjects of nonpublic investigations.

Analyzing trading and other complex data related to manipulation or other improper conduct.

Analyzing long-term electric market trends.

Issuing, coordinating, and developing proposed policy reforms to address emerging issues affecting wholesale and interstate electric energy markets.

In support of these objectives, the Commission contracted OATI in 2013 to receive e-Tag data under Commission Order 771 via the OATI webFERC solution. In 2019, the Commission contracted OATI to append Equivalent ATC and Equivalent TTC data to webFERC. In this procurement, the Division of Analytics and Surveillance (DAS) in the Office of Enforcement (OE) is requesting access to the complete BPAT Equivalent and Equivalent TTC data available to OATI.

OE will use this data to continue its efforts to monitor for the exercise of market power and/or market manipulation in the electricity markets. Staff has access to ATC and TTC data from other transmission providers in the U.S. However, in the Pacific Northwest the largest and most integral transmission system in the region is

1 Order 89603018P0047 is the current contract for eTag data. The ultimate completion date for the final option period is 3/14/2023.

2 Order 89603018P0076 is the current contract for Transmission Service Request (TSR) and Available Transfer Capacity (ATC) database subscriptions. The ultimate completion date for the final option period is 12/27/2023.

the BPAT system. Transmission customers' requests for transmission service in BPAT are accepted and denied based on the Equivalent ATC and Equivalent TTC data. FERC staff does not have access to the data and OATI informed staff that they will need to construct a separate data process to save the Equivalent ATC and TTC data to a database for FERC.

BPAT posts the Equivalent ATC and Equivalent TTC data for a limited time on its OASIS site. In order to perform comprehensive and robust analysis, staff will need to use this data over periods of one or more years.

Purchasing the data in a complete database from OATI will save a significant amount of staff time downloading, standardizing and aggregating the data in preparation for analysis.

3. TASKS

3.1 BPAT Equivalent ATC and Equivalent TTC data management (initial set-up and on-going):

The Vendor shall populate the webFERC solution with the BPAT Equivalent ATC and Equivalent

TTC databases.

The Vendor shall ensure data quality. Data available to the Commission shall accurately reflect BPAT

Equivalent ATC and Equivalent TTC data available to OATI.

The Vendor shall ensure data is updated in a timely manner. Real-time updates are not required.

The vendor shall maintain and modify the database structure as FERC’s data uses evolve over time.

The Vendor shall continue to operate under the Interconnection Service Agreement / Memorandum of

Understanding (ISA/MOU) with the FERC signed in March 2013 to create the webFERC solution.

The Vendor shall maintain and modify the database structure to maintain consistency with current

BPAT Equivalent ATC and Equivalent TTC standards as they evolve over time.

3.2 Access to the TSR/ATC data

The Vendor shall provide FERC access to all BPAT Equivalent ATC and Equivalent TTC data available in its systems.

As is currently the case for the webFERC solution, the Vendor shall continue to provide a robust, dedicated and encrypted connection utilizing TLS 1.2. Please note that this security requirement is subject to data communications security requirements provided by OMB/NIST and may change to a more stringent standard at a future date. This connection should enable transfer of any query results to the Commission.

As is currently the case for the webFERC solution, the Vendor shall continue to ensure constant access to BPAT Equivalent ATC and Equivalent TTC data with 24 by 7 reliability (99.0% uptime)

As is currently the case for the webFERC solution, the Vendor shall continue to provide up to 50 credentials to access the database through the Vendor's proprietary user interface.

As is currently the case for the webFERC solution, the Vendor shall continue to provide FERC direct access to the database without requiring the use of a proprietary user interface. The BPAT Equivalent ATC and Equivalent TTC database solution shall be capable of efficient large query runs using SQL query language. FERC staff will develop and submit any queries, while the Vendor shall ensure that the database solution is sufficiently robust to process submitted queries.

3.3 Support and expert advice and assistance

As is currently the case for the webFERC solution, the Vendor shall provide annual training covering e-Tag, ATC, TSR, and BPAT Equivalent ATC and Equivalent TTC data concepts once the solution is deployed at no cost to the Government.

The Vendor shall provide data documentation for the BPAT Equivalent ATC and Equivalent TTC data. This documentation must include a column description for all data columns and where applicable an Entity Relationship Diagram (ERD) and SQL statements required to relate tables within the data model.

The Vendor will accommodate staff requests for training on specific matters at no cost to the Government.

The Vendor shall meet FERC policy regarding Incident Handling Process and Procedures.

3.4 Other Constraints

The following constraints apply to the proposed database solution:

The BPAT Equivalent ATC and Equivalent TTC databases shall be fully functional within 90 days after award.

The Vendor shall include all BPAT Equivalent ATC and Equivalent TTC data available in its systems via the webFERC solution.

The Vendor shall securely house and maintain the data.

The Vendor shall comply with all relevant federal information security standards regarding a secure

VPN interconnection.

The Vendor shall communicate to FERC any unauthorized data disclosures and/or data breeches within two hours of discovery of the incident.

4. OTHER PERFORMANCE REQUIREMENTS

Not Applicable

5. SECURITY REQUIREMENTS

A security clearance is not required in performance of this effort.

5.1. Contractor Interfaces

Not applicable

5.2. Disclosure of Information

Information made available to the contractor by the Government for the performance or administration of this effort shall be used only for those purposes and shall not be used in any other way without the written agreement of the Contracting Officer.

The contractor agrees to assume responsibility for protecting the confidentiality of Government records, which are not public information. Each contractor or employee of the contractor to whom information may be made available or disclosed shall be notified in writing by the contractor that such information may be disclosed only for a purpose and to the extent authorized herein.

5.3. Limited Use of Data

Not Applicable

6. PLACE(S) OF PERFORMANCE

OATI systems and Commission Locations.

7. PERIOD OF PERFORMANCE

Base Period - 12 months from contract award.

Option Period I - 12 months from the end of the based period

Option Period II - 12 months from the end of option period I

Option Period III - 12 months from the end of option period II

Option Period IV - 12 months from the end of option period III

8. DELIVERABLES

The following deliverables will be required under the resultant contract:

• Fully functional access to the BPAT Equivalent ATC and Equivalent TTC databases via the webFERC solution

• Help desk access and performance commitments

• Data Dictionary (with units for applicable fields, whether the value is unitless, or unit a not-applicable indicator) and entity-relationship diagram (ERD)

• Change management documentation

• System build, testing and production timeline

• Weekly status reports (during deployment and system changes/upgrades only)

• Ongoing Consulting Services

8.1. Project Plan

Not applicable

8.2. Monthly Status Report

Not Applicable

8.3. Final Report

Not Applicable

8.4. Deliverable Table

Not Applicable

8.5. Inspection and Acceptance Criteria

Final inspection and acceptance of all work performed, reports and other deliverables will be performed at the place of delivery by the COTR.

8.6. General Acceptance Criteria

General quality measures, as set forth below, will be applied to each work product received from the contractor under this statement of work.

- Accuracy - Work Products shall be accurate in presentation, technical content, and adherence to accepted elements of style.

- Clarity - Work Products shall be clear and concise. Any/All diagrams shall be

- Easy to understand and be relevant to the supporting narrative.

- Consistency to Requirements - All work products must satisfy the requirements of this statement of work.

- File Editing - All text and diagrammatic files shall be editable by the Government.

- Format - Work Products shall be submitted in hard copy (where applicable) and in media mutually agreed upon prior to submission. Hard copy formats shall follow any specified Directives or Manuals.

- Timeliness - Work Products shall be submitted on or before the due date specified in this statement of work or submitted in accordance with a later scheduled date determined by the Government.

9. QUALITY ASSURANCE

The COTR will review all listed deliverables periodically in order to ensure accuracy and quality of product.

10. ADMINISTRATIVE CONSIDERATIONS

10.1. Correspondence

To promote timely and effective administration, correspondence shall be subject to the following procedures:

a) Technical correspondence (where technical issues relating to compliance with the requirements herein) shall be addressed to the Contracting Officer's Technical Representative (COTR) with an information copy to the Contracting Officer (CO) and the Contract Administrator (CA).

b) All other correspondence, including invoices, (that which proposes or otherwise involves waivers, deviations or modifications to the requirements, terms or conditions of this SOW) shall be addressed to the Contracting Officer with an information copy to the COTR.

10.2. Points of Contact

10.2.1. Contracting Officer's Technical Representative (COTR)

a) The Contracting Officer's authorized technical representative, for this effort is as follows:

Federal Energy Regulatory Commission Office of Enforcement 888 1st Street, NE Washington, DC 20426 Denise Tabbs, 202-502-8315

b) The COTR is the individual within the Program Management function who has overall technical responsibility for this effort The COTR supports the CO/CA during administration of this effort by:

1) Making final decisions regarding any recommended rejection of deliverables;

2) Providing technical clarification relative to overall workload matters;

3) Providing advice and guidance to the Contractor in the preparation of deliverables and services;

4) Providing acceptance of deliverable products to assure compliance with requirements.

c) The COTR also provide technical direction to the Contractor, i.e., shifting work emphasis between areas of work; fills in details, or otherwise serves to accomplish the purposes of this effort.

Technical direction shall be within the general statement of work for this effort. The COTR does NOT have the authority to and may NOT issue any technical direction which:

1) Constitutes an assignment of work outside the general scope of this effort;

2) Constitutes a change as defined in the "Changes" clause;

3) In any way causes an increase or decrease in cost or the time required for performance;

4) Changes any of the terms, conditions, or other requirements of this effort; and

5) Suspends or terminates any portion of this effort.

d) All technical direction shall be issued in writing by the COTR or will be confirmed by the COTR in writing within 10 calendar days after verbal issuance. A copy of the written direction shall be furnished to the CO and the CA.

e) In addition to providing technical direction, the COTR will:

1) Monitor the Contractor's technical progress. including surveillance and assessment of performance, and recommend to the CO and CA, any changes in the requirement;

2) Assist the Contractor in the resolution of technical problems encountered during performance; and

3) Perform inspection and acceptance or recommendation for rejection of Contractor deliverables and identify deficiencies in delivered items. This does not replace any other quality assurance inspection requirements that are specified elsewhere within this SOW.

f) If in the opinion of the Contractor, any instruction or direction issued by the COTR is outside of their specific authority, the Contractor shall not proceed but shall notify the CO in writing within 5 working days after receipt of any instruction or direction, with an informational copy to the CA.

10.2.2. Contracting Officer

The Contracting Officer (CO) for this effort is as follows:

Federal Energy Regulatory Commission Procurement Operations Branch 888 1st St. NE Washington, DC 20426

10.2.3. Contract Administration

Not Applicable

10.2.4. INVOICING

The Contractor will submit an original invoice to:

Federal Energy Regulatory Commission Office of Finance

Attn: Deena Hamilton-Graham

888 1st Street, NE Washington, DC 20426

To constitute a proper invoice, the invoice must include the following minimum information and/or attached documentation:

- Name of business concern/letterhead;

- Invoice date and separate/distinct number;

- Contract and Task Order number;

- Description of services and dates upon which services were rendered;

- Payment terms;

- Name, title, phone number and complete mailing address of responsible official to whom payment is to be sent or to contact in case of a defective invoice;

- Total charges for the billing period.

11. TRAVEL

Not Applicable

12. CENTRAL CONTRACTOR REGISTRATION (CCR) - NEW CONTRACTS

Not Applicable

13. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE

Not Applicable

14. SECTION 508 COMPLIANCE REQUIREMENTS

Any/all electronic and information technology (EIT) procured through this effort must meet the applicable accessibility standards at 36 CFR 1194. 36 CFR 1194 implements Section 508 of the Rehabilitation Act of 1973, as amended, and is viewable at http://www.section508.gov.

15. GOVERNMENT FURNISHED PROPERTY/INFORMATION

Not Applicable

16. PERSONNEL REQUIREMENTS

Not Applicable http://www.section508.gov/

1. Scope
2. Background
3. Tasks
4. Other Performance Requirements
5. Security Requirements
5.1. Contractor Interfaces
5.2. Disclosure of Information
5.3. Limited Use of Data
6. Place(s) of Performance
7. Period of Performance
8. Deliverables
8.1. Project Plan
8.2. Monthly Status Report
8.3. Final Report
8.4. Deliverable Table
8.5. Inspection and Acceptance Criteria
8.6. General Acceptance Criteria
9. QUALITY ASSURANCE
10. ADMINISTRATIVE CONSIDERATIONS
10.1. Correspondence
10.2. Points of Contact
10.2.1. Contracting Officer's Technical Representative (COTR)
10.2.2. Contracting Officer
10.2.3. Contract Administration
10.2.4. INVOICING
11. TRAVEL
12. CENTRAL CONTRACTOR REGISTRATION (CCR) - NEW CONTRACTS
13. POST AWARD EVALUATION OF CONTRACTOR PERFORMANCE
14. SECTION 508 COMPLIANCE REQUIREMENTS
15. GOVERNMENT FURNISHED PROPERTY/INFORMATION
16. PERSONNEL REQUIREMENTS

File details come from the government source that posted it. Updated .