| SOL_70LGLY20QGLB0003 Amendment 0001.pdf | ||
| Attachment 2 WGD 2015-4477 Rev 13.pdf | ||
| SOL_70LGLY20QGLB00039.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Boiler Inspection Services Federal Law Enforcement Training Centers
Scope of Work
Department of Homeland Security (DHS), Federal Law Enforcement Training Centers (FLETC), Facilities Management Division (FMD) has a requirement for inspection of forty-seven (47) Boilers located at 1131 Chapel Crossing Rd, Glynco, GA 31524.
All work shall be performed by inspectors that holds a National Board Commission and Certificate of Competency from the State of Georgia. Companies shall be accredited by the National Board of Boiler Inspectors (NBBI) or equivalent. All work shall be done in accordance to American Society of Mechanical Engineers (ASME) and NBBI Guidelines.
Boiler Information and Building Locations Table:
Item No.
Building No. Make Model Serial
Input
BTU
Output
BTU
Horse Power
1 BG0015 Lochinvar AWN801PM #1632103291702 800,000 23.9 HP 2 BG0049 Lochinvar AWN801PM #1632103291706 800,000 23.9 HP 3 BG0064 Lochinvar KBN601 E12H10209935 600,000 17.9 HP 4 BG0065 Lochinvar KBN601 E12H10209927 600,000 17.9 HP 5 BG0066 Lochinvar KBN601 E12H10209926 600,000 17.9 HP 6 BG0068 Precision PCW1-120B-208-150SS B050074 409,440 12.2 HP
7 BG0074
Cleaver Brooks FLX-200-600-150ST
MBH 143 HP
Cleaver Brooks FLX-200-600-150ST #06701-1-2
MBH 143 HP
9 BG0075 Lochinvar AWN801PM #16321032917240 800,000 23.9 HP 10 Lochinvar KBN801 E12H10202495 800,000 23.9 HP 11 Lochinvar KBN801 E12H10205862 800,000 23.9 HP 12 BG0086 State SBT100260NET9ASMEF K92400583 260,000 7.8 HP 13 State SBT100260NET1ASMEF G94608222 260,000 7.8 HP 14 BG0090 Lochinvar KBN801 E12H10203785 800,000 23.9 HP 15 BG0093 Peerless SC-05-W SC-010289-0898 433 MBH 12.9 HP 16 Peerless SC-05-W SC-010288-0898 433 MBH 12.9 HP 17 BG0094 Precision PCW3-3303-480-150 B020555 1,125,960 33.6 HP 18 BG0097 Lochinvar AWN801PM #1628103183368 800,000 23.9 HP 19 Lochinvar AWN801PM #1628103183369 800,000 23.9 HP 20 Lochinvar FBN1251 #1744107997322 1,250,000 37.3 HP
21 Lochinvar FBN1251 #1744108049305 1,250,000 37.3 HP 22 BG0099 Raypak H7-0700 #12061964403 700,000 20.9 HP
23 BG0210 Cemline VB450FTB640C3-RL 42303 640 KW 65.24
HP
24 Cemline VB450FTB640C3-RL 42302 640 KW 65.24
HP
25 BG0212 Cemline VB450FTB390C3-RL 42304 390 KW 39.75
HP
26 BG0215 Lochinvar PCW3-4400-480-150 B060208 1,540,000 46 HP 27 Lochinvar PCW3-4400-480-150 B060207 1,540,000 46 HP 28 BG0216 Lochinvar KBN801 E12H10213793 800,000 23.9 HP 29 Lochinvar KBN801 E12H10213784 800,000 23.9 HP 30 BG0221 Lochinvar KBN801 E12H10212479 800,000 23.9 HP 31 Lochinvar KBN801 E12H10215867 800,000 23.9 HP 32 Lochinvar KBN801 E12H10217304 800,000 23.9 HP 33 Lochinvar KBN801 E12H10215877 800,000 23.9 HP 34 BG0252 Lochinvar AWN801PM E12H20209804 800,000 23.9 HP 35 Lochinvar AWN801PM E12H20217241 800,000 23.9 HP 36 Lochinvar KBN801 E12H10212481 800,000 23.9 HP 37 Lochinvar KBN801 E12H10215883 800,000 23.9 HP 38 Lochinvar KBN801 E12H10215861 800,000 23.9 HP 39 Lochinvar KBN801 800,000 23.9 HP 40 BG0261 Lochinvar KBN801 E12H10212878 800,000 23.9 HP
41 BG0262 Bryan CLM300-W-FDGO #96077 3000-
MBH 89.6 HP
42 BG0263 Lochinvar KBN801 E12H10213797 800,000 23.9 HP
43 BG0272 Precision
HW30D-1480D-480-
150SS B050073 5,049,760
150.8
HP
44 Precision
HW30D-1480D-480-
150SS B050072 5,049,760
150.8
HP
ERCO
Benchmark
3000 3000 G-13-0066 3,000,000 89.6 HP
46 BG0912 Lochinvar KBN701 #3115101858749 700,000 20.9 HP 47 Lochinvar KBN701 #3115101858766 700,000 20.9 HP
Specific Tasks
The contractor shall perform internal inspections of the steam drums, mud drums, headers, tubes, furnace area and fireside surfaces for signs of corrosion, erosion, rusting, cracking or any other signs of damage or deterioration. External inspections shall be performed for examination of controls and safety devises, safety valves, pressure gauges, valves, fittings, pipe connections for evidence of leaks or other adverse conditions.
All work shall be performed by inspectors that holds a National Board Commission and Certificate of Competency from the State of Georgia. Companies shall be accredited by the
National Board of Boiler Inspectors (NBBI) or equivalent. All work shall be done in accordance to American Society of Mechanical Engineers (ASME) and NBBI Guidelines.
Period of Performance
Base Period 07/01/2020 – 06/30/2021 Option Period 1 07/01/2021 – 06/30/2022 Option Period 2 07/01/2022 – 06/30/2023 Option Period 3 07/01/2023 – 06/30/2024 Option Period 4 07/01/2024 – 06/30/2025
Place of Performance
The work shall be performed at the Federal Law Enforcement Training Centers (FLETC), 1131 Chapel Crossing Rd, Glynco (Brunswick), Georgia 31524.
Minimum Qualification Requirements
The contractor will be authorized and qualified to inspect and operationally certify boilers. All work shall be performed by inspectors that holds a National Board Commission and Certificate of Competency from the State of Georgia. Companies shall be accredited by the National Board of Boiler Inspectors (NBBI) or equivalent. All work shall be done in accordance to American Society of Mechanical Engineers (ASME) and NBBI Guidelines.
Schedule
The contractor will contact the Contracting Officer’s Representative (COR) to schedule the needed inspections.
Acceptance Criteria
The receipt of inspection results and operational permits will ensure the work has been performed and a copy submitted to the COR.
Invoicing
Contractor shall submit proper invoices electronically via email to the Contracting Officer.