Attachment 1- Statement of Work 4821 FInal.docx

DOCX document 50 KB Posted

Attached to
OK-542 Stow Drum Federal contract opportunity
Solicitation number
N66604-25-Q-0222
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This Statement of Work/Performance Work Statement outlines requirements for manufacturing one Drum Assembly (P/N: 53Z-02-020) for the Naval Undersea Warfare Center Division Newport's Towed Array Handling Equipment Facility. The assembly is a component of the OK-542 Thinline Towed Array Handling Equipment used on SSBN/SSGN 726 CL Submarines for deploying and retrieving towed arrays.

The contractor must manufacture the assembly according to specified technical drawings and requirements, including precise painting/priming specifications and welding procedures that require prior approval. Key deliverables include Certificates of Compliance, Mercury Free Statement, Certificate of Analysis for raw materials, and documentation of non-destructive testing (visual and liquid penetrant) for all welds. The work is to be performed at the contractor's facility using Service Cost Center funding, with quarterly progress reports required. The associated solicitation (N66604-25-Q-0222) indicates this will be a firm-fixed-price contract awarded on an unrestricted basis under NAICS code 332710.

View the file

Other files for this federal contract opportunity

Other files attached to OK-542 Stow Drum, newest first.
File Type Posted
RFQ N6660425Q0222 Final.docx DOCX document
Attachment 2- CDRL A001-A007 (signed)_Redacted.pdf PDF
Attachment 3- WPS_Letter_W04821.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

v4.0_JULY2024

STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)

Towed Array Handling Equipment Facility W04821

1.0 Background

The Sensors and Arrays Division (Code 153) of the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) is comprised of The Towed Array Handling Equipment Facility (TAHEF), which is the Naval Sea Systems Command (NAVSEA) certified Designated Overhaul Point for the OK-542 Thinline Towed Array Handling Equipment (TLTAHE). The OK-542 TLTAHE is essential for deployment and retrieval operations of the thinline towed array used on SSBN/SSGN 726 CL Submarines. The Capstan Drive Assembly (Unit 1) and Stowage Drum/ Level Wind Assembly (Unit 2) are components of the OK-542 TLTAHE that are used to deploy and retrieve towed arrays. The TAHEF has been tasked to provide support in upgrading and overhauling Unit 1 and Unit 2 for use on SSBN/SSGN 726 CL Submarines.

NUWCDIVNPT, Code 153, requires the manufacture of designed (build-to-print) OK-542 Unit 2 support material. This hardware will support the thinline towed array used on SSBN/SSGN 726 CL Submarines.

1.1 Places of Performance

The contractor’s facility

1.2 Authorized Users

Code 1534 / TAHEF

1.3 Sponsors

NUWCDIVNPT

1.4 Types of Funding

Service Cost Center (SCC) Funds

2.0 Scope

The contractor shall manufacture and deliver one (1) Drum Assembly (P/N: 53Z-02-020) required for OK-542 TLTAHE overhauls and upgrades as delineated below and in the QAP.

2.1 Program or Systems Supported

OK-542 Thinline Towed Array Handling Equipment

3.0 Applicable Documents

The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs). For any of the below drawings, please reference industry standard specs IAW the applicable drawings when manufacturing this item.

Table:

NUMBER
TITLE
REVISION/

DATE

APPLICABLE SOW TASK

3.1
53Z-02-020_53711_FN_D
D/ 7/15/1998
4.1
3.2
53Z-02-187_53711_FN_C
C/ 5/27/1994
4.1
3.3
53Z-02-241_53711_FN_C_D17-038
C/ 5/27/1994
4.1
3.4
53X-02-114-X_32386_FN_K
K/ 1/31/2013
4.1
3.5
53X-02-119_32386_FN_H
H/
4.1
3.6
53X-02-120_32386_FN_F
F/ 1/30/2013
3.7
53X-02-120-1_32386_FN_A
A/ 1/30/2013
4.1
3.8
53X-02-195_32386_FN_B
B/
4.1
3.9
53X-02-224_32386_FN_C
C/ 1/31/2013
4.1
3.10
53X-02-239_32386_FN_G_D17-038
G/ 1/31/2013
4.1
3.11
53X-02-242_32386_FN_D
D/ 1/31/2013
4.1
3.12
53X-02-243_32386_FN_C
C/ 1/31/2013
4.1
3.13
53X-02-245_32386_FN_C
C/
4.1
3.14
53X-02-246_32386_FN_D
D/
4.1
3.15
53X-02-257_32386_FN_B
B/ 1/31/2013
4.1
3.16
53Z-02-108_53711_FN_C
C/ 5/27/1994
4.1
3.17
53Z-02-157_53711_FN_C
C/ 5/27/1994
4.1
3.18
53Z-02-161_53711_FN_C
C/ 5/27/1994
4.1
3.19
53Z-02-162-X_53711_FN_C
C/ 5/27/1994
4.1
3.20
53Z-02-170_53711_FN_C
C/ 5/27/1994
4.1
3.21
53Z-02-225-X_53711_FN_C
C/ 5/27/1994
4.1
3.22
53Z-02-238_53711_FN_C
C/ 5/27/1994
4.1
3.23
53Z-02-300_53711_FN_A
A/ 5/27/1994
4.1
3.24
AP00-300-REV_B
B/ 9/05/1996
4.1
3.25
AP02-101_C_D13-003
C/ 5/25/2006
4.1
3.26
Welding Procedure Specification
-/ 5/3/2022
4.2.4.1

4.0 Technical Requirements

The contractor shall perform the tasks delineated in Section 4.1 in accordance with the AD in Section 3.0 and using Government Furnished Information (GFI) listed in Section 6.0. If there is any discrepancy between this SOW and the AD, this SOW shall take precedence over the AD.

4.1 In accordance with Applicable Document 3.1 thru 3.23, the contractor shall fabricate one (1) Drum Assembly (P/N: 53Z-02-020).

4.1.1 *APPLICABLE ONLY IF USING THIS REQUIREMENT TO BECOME CERTIFIED TO WELD THE REQUIRED BASE MATERIAL* The offeror shall use a test coupon of the same base material required in accordance with the applicable drawings in lieu of a qualifying production run to become certified. Upon completion of this test coupon the offeror shall submit the newly certified Weld Procedure Specifications (WPS) and Procedure Qualification Records (PQR) for technical review to the Government. Upon acceptance of both WPS and PQR by the Government production may proceed on the contracted quantity.

4.1.2 The contractor shall prepare, prime and paint Drum Assembly in accordance with referenced drawings and the following:

4.1.2.1 Isolate/protect all internal and external threads, and machined surfaces as required.

Reference Note 2 of dwg. 53Z-02-020 for specific surfaces/features to protect from blast media. Mask off all surfaces of internal bore shown in Partial Section C-C of drawing.

4.1.2.2 Media blast as required to touch up and restore all exposed surfaces to SSPC SP-10.

4.1.2.3 Mask off all internal and external threads and part surfaces indicated to not receive paint.

Do not prime or paint Stowage Drum ID Bore Cavity (to include all entrance features, mounting holes, counter bore seats, counter sink chamfers, etc.) This entire bore cavity must be steel machine finish for required final assembly interface with various machine elements (bearings, isolation seals, etc.). Reference Notes 1 and 2 of 53Z-02-020.

Do not prime or paint zinc anode cavities or welded studs. Reference Note 4 of 53Z-02-020.

4.1.2.4 Prime with one coat (4-6mil DFT) of MIL-DTL-24441 Formula 150 Green Primer (or MIL-PRF-23236; Type V, VI, or VII; Class 5 or 7; Color Green).

4.1.2.5 Mask off part surfaces indicated to receive primer only.

Do not finish paint flange bulkhead bore cavity and flange faces (each side). Ref: 53Z-02-241 Sheet 5 Views G-G, H-H, & J-J Do not finish paint grooved sleeve panel opening seating location. Ref: 53Z-02-241 Sheet 6 View K-K.

4.1.2.6 Paint with two coats (4-6mil DFT) of MIL-DTL-24441 Formula 151 Haze Gray (or MIL-PRF-23236 Equivalent).

4.1.2.7 Upon completion of painting, stencil identification “53711/53Z-02-187” IAW MIL-STD-130 using a flat white alkyd enamel paint, reference Note 7 of dwg. 53Z-02-187.

4.1.2.8 Paint and primer application shall be by spraying, follow paint manufacturers’ application instructions.

4.2 Required Documentation

4.2.1 Certificate of Compliance (CoC)

4.2.1.1 The contractor shall provide a Certificate of Compliance (CoC) on company letterhead, signed by the responsible company official, certifying that all items were manufactured in accordance with the SOW and Applicable Documents 3.1 through 3.39 (CDRL A001)

4.2.2 Mercury Free Statement

4.2.2.1 The contractor shall provide a Mercury Free Statement on company letter head, signed by the responsible company official, certifying that Mercury and Mercury containing compounds were not intentionally added to nor allowed to come in contact with parts, hardware, or supplies furnished under this purchase order (CDRL A002).

4.2.3 Certificate of Analysis

4.2.3.1 The contractor shall provide a Certificate of Analysis of Raw Material in accordance with Applicable Documents 3.1 through 3.39. This includes all material used for welding operations. (CDRL A003).

4.2.4 Process Certification

4.2.4.1 To ensure that this completed SOW task complies with requirements of MIL-STD-22D, S9074-AQ-GIB-010/248, S9074-AR-GIB-010/278 & T9074-AS-GIB-010/271, selected vendor is required to submit all necessary Welding Procedure Specifications (WPS) & WPS associated Product Qualification Records (PQR) prior to initiating work order product fabrication. All WPS & PQR documentation shall be submitted to the Towed Array Handling Equipment Facility (TAHEF) for required review & approval by NUWC authorized NAVSEA government representative. TAHEF will not provide unique AWS qualified WPS & PQR procedures to selected vendor for this SOW. It is incumbent upon the vendor to provide or seek formal noted welding documentation that complies with SOW for TAHEF quality assurance of product traceability as defined by NAVSEA specifications.

4.2.4.2 Above noted weld documentation shall reference applicable vendor Weld Procedure Specifications (WPS) for this SOW_W04821. Formal procedure(s) from selected vendor are not required as deliverable upon OSR completion considering that approved copies reside with TAHEF TPL. All applicable WPS and PQR must be on file with TAHEF prior to performing welding. Reference NOTE-WELDING above.*

4.2.4.3 *Other processes require additional documentation on a part by part basis. Refer to RIR_QAP_W04821 for each relevant document that is to be provided upon completion of this SOW. (CDRL A005)

4.3 Test Data

4.3.1 Non-destructive testing (NDT)

4.3.1.1 The contractor shall provide NDT Visual Test (VT) & Liquid Penetrant Test (PT) “PASS” document confirmation for all welds –include associated part number, Certified Welder & NDT Inspector’s Name & associated task calendar date(s). Acceptable liquid penetrant inspection of all tactical welds require “PT” stamp adjacent to weld (if not already present) by certified inspector. (CDRL A006)

5.0 Progress Reports

5.1 Contract Status Report

The Contractor shall prepare a Contractor’s Status Report that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks. The Contractor shall submit the Contract Status Report Quarterly via email to the GVT POC, on the 1st of the Quarter or next available business day.

Deliverable: CDRL A007.

6.0 Government Furnished Information

The following Government Furnished Information (GFI) will be made available under this contract order.

Number
Title
Applicable SOW Task Number
6.1
Vendor Information Request (VIR W04821), TAHEF Document
4.1
6.2
Receipt Inspection Report (RIR_QAP_W04821), TAHEF Document
4.1

7.0 Government Furnished Property

RESERVED

8.0 Quality Surveillance and Performance Standards

RESERVED

9.0 Information and Communication Technology (ICT) Accessibility Requirements

The Government has determined that this procurement is not Information and Communication Technology (ICT).

10.0 Security Compliance

10.1 Program Protection

SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117 – National Industrial Security Program Operating Manual (NISPOM) and the security requirements of the attached DD254. While performing work at a Government Facility, Contractor personnel shall comply with the security regulations of the host facility. Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer’s Representative (COR), Technical Point of Contact (TPOC), and the Cognizant Security Office to NUWCDIVNPT Security.

Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at:

https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf

INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M-5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.

CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer’s Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the Security Office. Contractor personnel shall coordinate this effort through the relevant industry site FSO.

PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release through the appropriate U.S. Government Office.

10.2 Operations Security (OPSEC)

OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information.

The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Presidential Memorandum (NSPM) 28, and at a minimum shall include:

1) Assignment of responsibility for OPSEC direction and implementation.

2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

3) Establishment of OPSEC education and awareness training.

4) Provisions for management, annual review, and evaluation of OPSEC programs.

5) Flow down of OPSEC requirements to subcontractors when applicable.

While performing aboard Government sites, the contractor shall: comply with all OPSEC instructions and policies; include OPSEC as part of its ongoing security awareness program and take all required Agency training; Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.

10.3 Electronic Spillage

Electronic Spillage (ES) is defined as a situation where information of higher classification than a system is authorized to process is introduced into that system, intentionally or otherwise. If a Contractor is determined to be responsible for an ES, all direct and indirect costs incurred by the Government for ES remediation will be charged to the Contractor.

File details come from the government source that posted it. Updated .