Attachment 1 - Statement of Objectives.pdf

PDF 110 KB Posted

Attached to
Public Affairs Internet Connectivity (Sheppard AFB) Federal contract opportunity
Solicitation number
FA302020Q0066
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Public Affairs Internet Connectivity (Sheppard AFB), newest first.
File Type Posted
Questions and Answers Q0066.pdf PDF
Combo Solicitation-RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Objectives Sheppard Air Force Base, Texas

Internet Connectivity for Solid Rock Café—82 TRW/HC, Chaplain Corps

1.0. SCOPE

The focus of this project is to provide Internet access to one (1) building on Sheppard Air Force Base (SAFB): 419 G Ave. Building 400.

1.1. OBJECTIVE

This project will involve providing Internet connectivity to one building on SAFB, with minimum bandwidth of 1Gigabytes per second (1Gbps) download and upload. Internet connectivity shall be provisioned to building 400 on SAFB.

1.2. ORDER TYPE

This effort is proposed on a Firm Fixed Price (FFP) basis.

2.0. REQUIREMENTS

The contractor shall provide 1 Gbps fiber commercial Internet connectivity to the Public Affairs Office, building 400 (listed in part 1.1.).

2.1. SPECIFICATIONS OF REQUIREMENT

The contractor shall provide installation on a one-time basis, and operations and maintenance on a 24-hours, 7 day per week, 365 days per year basis for commercial Internet connectivity. The contractor shall provide a minimum bandwidth connection of 1Gbps download and 1Gbps upload.

The contractor shall provide an Ethernet interface to allow for client systems to utilize the provided Internet connection, and must provide a firewall to ensure client machines are not exposed directly to the Internet. The contractor shall provide service and support contact information.

3.0. SCHEDULE

The contractor shall deliver connectivity no later than 1 October 2020. Period of performance will be 1 Oct 2020 - 30 Sept 2021 (base period), with 3 (12 month) options:

- Base Year: 1 Oct 2020 - 30 Sept 2021

- Option Year 1: 1 Oct 2021 - 30 Sept 2022

- Option Year 2: 1 Oct 2022 - 30 Sept 2023

- Option Year 3: 1 Oct 2023 - 30 Sept 2024

File details come from the government source that posted it. Updated .