Attachment 1 - Specifications.pdf
PDF 242 KB Posted
- Attached to
- Solicitation - 0. 5mm Calibration Kit Federal contract opportunity
- Solicitation number
- NB672010-26-02016
About this file
This is a Requirements/Specification Document for a federal procurement issued by the National Institute of Standards and Technology (NIST), Communications Technology Laboratory, Radio Frequency Technology Division, Guided Wave Electromagnetics Group in Boulder, Colorado.
NIST requires the manufacture and assembly of precision microwave calibration artifacts for broadband electrical calibration services spanning dc to 250 GHz. The procurement consists of five items: (1) a disassembled Precision Offset Short Calibration Kit in 0.5 mm connector type containing 12 offset short calibration artifacts (6 male and 6 female) manufactured to metrology-grade dimensional specifications with offset lengths designed for 30 GHz to 260 GHz calibration range and measured mechanical data with k=2 uncertainties; (2) assembly of the offset short components following NIST dimensional metrology; (3) a Precision Short Open Load Kit with metrology-grade components including lowband loads, offset opens, offset shorts, and torque wrenches in male and female 0.5 mm connector types; (4) a set of spare components for dimensioning including pre-slotted female center conductors and spare male and female center conductors; and (5) a set of assembled test port adapters (1 male, 1 female) in metrology-grade 0.5 mm connectors. The procurement operates in three stages: manufacturing, dimensional metrology at NIST, and assembly, with partial delivery acceptable. Item 1 shall be delivered independently of items 3–5, while Item 2 and the assembled Item 1 must be delivered within 10 weeks of return from NIST. Delivery location is NIST-Boulder, Attention: Angela Stelson, Mail Stop 672.01, 325 Broadway, Boulder, CO 80305. Inspection and acceptance is on-site and expected to exceed 7 business days, with 60 days specified for the acceptance timeline. Vendors must possess an active Unique Entity Identification Number (UEI) on SAM.gov and an Export Control Classification Number (ECCN) at time of award. Base manufacturer warranty is acceptable. NIST shall provide dimensional metrology services for Item 1 before returning components to the vendor for assembly.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 - RFQ - NB672010-26-02016.zip | ZIP file | |
| Attachment 2 - Provisions and Clauses.pdf | ||
| NB672010-26-02016 - RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: 0.5 mm Offset Short Primary Calibration Kit
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Guided Wave Electromagnetics Group (672.03)
General Statement of Need:
The National Institute of Standards and Technology (NIST), CTL/RFT, in Boulder, CO has a requirement to produce broadband electrical calibration artifacts as part of its calibration service for scattering parameter traceability from dc up to 250 GHz. Precision manufactured calibration artifacts are required to maintain accurate traceable calibrations for internal and external customers.
To achieve traceability for microwave frequencies, a series of offset short devices will need to be provided in a disassembled state so that dimensional metrology staff at NIST can measure them. Then the parts will need to be re-assembled to complete the microwave verification kit.
Item Specifications and Quantities:
Item 1: Precision Offset Short Calibration Kit in 0.5 mm Connector Type Quantity: 1 EACH Specifications: 1.1 Disassembled
1.2 Shall contain at least six offset short calibration artifacts of each connector sex (12 total: 6 male and 6 female).
1.3 Manufactured with metrology grade dimensional
specifications.
1.4 Offset short lengths shall be designed such that the kit
performs calibrations in the range of 30 GHz to 260 GHz.
1.5 Measured mechanical data with k=2 uncertainties
Item 2: Assembly of Offset Short Components Quantity: 1 JOB Specifications: 2.1 Assembly of the offset short components (Item 1).
2.2 Assembly process will occur after NIST performs dimensional metrology on the components.
Item 3: Precision Short Open Load Kit
Quantity: 1 KIT Specifications: 3.1 Lowband load - male 0.5 mm
3.2 Lowband load - female 0.5 mm
3.3 Offset open - male 0.5 mm
3.4 Offset open - female 0.5 mm
3.5 Offset short - male 0.5 mm
3.6 Offset short - female 0.5 mm
3.7 Components shall be fabricated as metrology grade
components. In addition, the
3.8 Kit shall contain relevant torque wrenches
Item 4: Spare Components for Dimensioning Quantity: 1 SET Specifications: 4.1 0.5 mm connector type
4.2 Pre-slotted female center conductor
4.3 Slotted and plated but not heat-treated/formed
4.4 Spare male center conductors
4.5 Spare female center conductors
Item 5: Test Port Adapters in 0.5 mm Quantity: 1 SET Specifications: 5.1 Assembled test ports (1 male, 1 female).
5.2 Metrology grade
Vendor Requirements
1. Possess at time of award/contracting an Export Control Classification Number (ECCN).
2. Possess at time of award/contracting a Unique Entity Identification Number (UEI) which registration is listed as “Active” on the GSA System for Award Management (SAM.gov).
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations
☐ List any visits required to allow potential vendors to see site specific constraints.
☐ N/A [Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☒ Other Considerations:
This procurement has three stages:
1) manufacturing,
2) dimensioning at NIST, and
3) assembly of parts.
Since step 2 depends on NIST timelines outside of the vendor’s control, the vendor timelines should be considered separately, and there should be partial payment and partial delivery.
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: Angela Stelson Mail Stop: 672.01 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☒ Partial Delivery Acceptable
☒ Item 1 should be delivered independently of items 3-5.
Item 2 depends on return of Item 1 from NIST to vendor for assembly.
Item 2 and assembled Item 1 delivered within 10 weeks after receiving them back from NIST
☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
Click or tap to enter a date.
☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☒ N/A
[Enter Electronic Media Requirements by Item.]
☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services
☐ Turnkey Installation
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site
☐ Acceptance Not Expected to Exceed 7 Business Days
☒ Acceptance Expected to Exceed 7 Business Days:
60 days
☐ Inspection and Acceptance Plan:
[Explanation]
[Enter Other Requirements]
Training
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods
☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government List Any Government Furnished Material / Equipment Per Item]
Furnished Material / Equipment ☐ N/A
☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☒ Other: NIST shall provide dimensional metrology for Item 1 before returning to vendor for assembly (Item 2)
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement]
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .