This document is a specifications package for the Norwood Warehouse Improvements 2025 project at the Bureau of Land Management's Uncompahgre Field Office in Norwood, Colorado. The project consists of two main components: 1) installing a pedestrian gate in an existing chain link fence, and 2) replacing a broken yard hydrant.
The specifications detail that the pedestrian gate must match the existing 7-foot chain link fence height (which has 1 foot of barbed wire above), be constructed of galvanized steel, include an exit bar, security shroud, lock, and barbed wire. The gate must swing outward with a maximum 2-inch gap to the post and be set in concrete. The yard hydrant replacement must be frost-proof, lead-free, and suitable for potable water. The contractor must verify the bury depth before ordering. Work must be completed within 150 days of Notice to Proceed, occurring Monday-Friday excluding federal holidays, December 26-31, and the day after Thanksgiving. The work location is at 40835 State Highway 145, Norwood CO 81423, at the intersection of Highway 145 and Hazel Street.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_9_-_Pre-Bid_Attendees_Roster_0002.pdf | ||
| Attachment_8_-_Past_Performance_Questionnaire_0002.pdf | ||
| Sol_140L1725Q0010_Amd_0002.pdf | ||
| Sol_140L1725Q0010_Amd_0001.pdf | ||
| Attachment_7_-_Updated_Clauses_0001.pdf | ||
| Attachment_6_-_Q_A_0001.pdf | ||
| Attachment_5_-_Fillable_889_Form_2.pdf | ||
| Attachment_4_-_Project_Map.pdf | ||
| Attachment_3_-_Wage_Determination_-_San_Miguel_County.pdf | ||
| Sol_140L1725Q0010.pdf | ||
| Attachment_2_-_Bid_Schedule.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Uncompahgre Field Office
Norwood Warehouse Improvements 2025
SPECIFICATIONS
BLM Uncompahgre Field Office Norwood Warehouse Improvements
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 33 00 SUBMITTAL PROCEDURES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 31 00 PEDESTRIAN GATE
DI VI SI ON 33 - UTI LI TI ES
33 11 10 REPLACE YARD HYDRANT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
Install a pedestrian gate in an existing chain link fence. Replace an existing yard hydrant.
1.2 LOCATION
The project is located at the intersection of Highway 145 and Hazel street. Project address:
40835 State Highway 145 Norwood CO 81423
1.3 WORK SCHEDULE
Work shall occur Monday - Friday. Work shall not occur on Federal Holidays, December 26-31, and the day after Thanksgiving. Work shall be completed within 150 days of the Notice to Proceed. The work will not take 150 days to complete. The extended time period is to provide plenty of opportunity for the contractor to fit the project into their existing work schedule.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 PROVIDE PEDESTRIAN GATE
1.1.1 Payment
Payment will be made for all costs associated with providing and installing a pedestrian gate.
1.1.2 Unit of Measure
Unit of measure: Job.
1.2 REPLACE YARD HYDRANT
1.2.1 Payment
Payment will be made for all costs associated with replacing (providing and installing) a yard hydrant.
1.2.2 Unit of Measure
Unit of measure: Job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 3
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.
1.2 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.
This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.
1.3 GOVERNMENT APPROVING AUTHORITY
The Contracting Officer's Representative will:
a. Note the date on which the submittal was received.
b. Review submittals for approval within 10 days of receipt.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.
1.3.1 Review Notations
Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until
SECTION 01 33 00 Page 4 resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.
1.4 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.5 APPROVED SUBMITTALS
The Contracting Officer's approval of submittals is not to be construed as a complete check.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 5
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
Norwood Warehouse Improvements
33 11 10 2.1 GYard Hydrant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SECTION 32 31 00
PEDESTRIAN GATE
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Install a pedestrian gate in an existing chain link fence.
PART 2 PRODUCTS
2.1 PEDESTRIAN GATE
The pedestrian gate shall be constructed of the same type of materials as the existing chain link fence, except where detailed otherwise. All gate material shall be galvanized steel. Paint welds with zinc-rich paint.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The contractor is responsible for locating and avoiding underground utilities. Contractor shall repair any damage caused to underground utilities as a result of the work.
3.2 EXISTING FENCE
The existing chain link fence posts are approximately 10 feet apart. The existing top rail is approximately 7 feet tall. There is approximately one foot of barbed wire above the top rail.
3.3 PEDESTRIAN GATE PICTURE
The pedestrian gate pictures shown on the drawings are an example of the gate required.
3.4 PEDESTRIAN GATE LOCATION
Install the pedestrian gate at the approximate location shown on the drawings.
3.5 PEDESTRIAN GATE
Match gate height to existing fence. Pedestrian gate shall have an exit bar, security shroud, lock, barbed wire. Gate shall be plumb in the closed position. Maximum gap of 2 inches between the gate and the post.
Gate shall swing outward. Fence posts shall be set in concrete.
3.6 GATE LOCK
Rekey the gate lock cylinder to match an existing BLM key. BLM key will be provided after contract is awarded.
3.7 SITE SECURITY
Provide site security at all times during construction and installation of the gate.
SECTION 32 31 00 Page 6
SECTION 32 31 00 Page 7
SECTION 33 11 10
REPLACE YARD HYDRANT
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
Replace an existing, broken, yard hydrant.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Yard Hydrant ; G
PART 2 PRODUCTS
2.1 YARD HYDRANT
Provide a frost proof yard hydrant, lead free, suitable for potable water.
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
The contractor is responsible for locating and avoiding underground utilities. Contractor shall repair any damage caused to underground utilities as a result of the work.
3.2 YARD HYDRANT
Remove existing broken yard hydrant. There are several yard hydrants on site, verify the yard hydrant to be replaced with the Contracting Officer prior to replacement.
Contractor shall verify the size (bury depth) required to match existing water line prior to submitting, and ordering, the replacement yard hydrant. Install the yard hydrant in accordance with the manufacturer's written installation instructions.
SECTION 33 11 10 Page 8
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 00 - SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 PROJECT DESCRIPTION |
| 1.2 LOCATION |
| 1.3 WORK SCHEDULE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 20 00 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 PROVIDE PEDESTRIAN GATE |
| 1.1.1 Payment |
| 1.1.2 Unit of Measure |
| 1.2 REPLACE YARD HYDRANT |
| 1.2.1 Payment |
| 1.2.2 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 33 00 - SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 INFORMATION ONLY SUBMITTALS |
| 1.3 GOVERNMENT APPROVING AUTHORITY |
| 1.3.1 Review Notations |
| 1.4 DISAPPROVED SUBMITTALS |
| 1.5 APPROVED SUBMITTALS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| 32 31 00 - PEDESTRIAN GATE |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| PART 2 PRODUCTS |
| 2.1 PEDESTRIAN GATE |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 EXISTING FENCE |
| 3.3 PEDESTRIAN GATE PICTURE |
| 3.4 PEDESTRIAN GATE LOCATION |
| 3.5 PEDESTRIAN GATE |
| 3.6 GATE LOCK |
| 3.7 SITE SECURITY |
| DIVISION 33 - UTILITIES |
| 33 11 10 - REPLACE YARD HYDRANT |
| PART 1 GENERAL |
| 1.1 DESCRIPTION OF WORK |
| 1.2 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 YARD HYDRANT |
| PART 3 EXECUTION |
| 3.1 UNDERGROUND UTILITIES |
| 3.2 YARD HYDRANT |
File details come from the government source that posted it. Updated .