This document is a specifications package for the Norwood Warehouse Improvements 2025 project at the Bureau of Land Management's Uncompahgre Field Office in Norwood, Colorado. The project consists of two main components: 1) installing a pedestrian gate in an existing chain link fence, and 2) replacing a broken yard hydrant.

The specifications detail that the pedestrian gate must match the existing 7-foot chain link fence height (which has 1 foot of barbed wire above), be constructed of galvanized steel, include an exit bar, security shroud, lock, and barbed wire. The gate must swing outward with a maximum 2-inch gap to the post and be set in concrete. The yard hydrant replacement must be frost-proof, lead-free, and suitable for potable water. The contractor must verify the bury depth before ordering. Work must be completed within 150 days of Notice to Proceed, occurring Monday-Friday excluding federal holidays, December 26-31, and the day after Thanksgiving. The work location is at 40835 State Highway 145, Norwood CO 81423, at the intersection of Highway 145 and Hazel Street.

View the file

Other files for this federal contract opportunity

Other files attached to UFO NORWOOD WAREHOUSE IMPROVEMENTS, newest first.
File Type Posted
Attachment_9_-_Pre-Bid_Attendees_Roster_0002.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire_0002.pdf PDF
Sol_140L1725Q0010_Amd_0002.pdf PDF
Sol_140L1725Q0010_Amd_0001.pdf PDF
Attachment_7_-_Updated_Clauses_0001.pdf PDF
Attachment_6_-_Q_A_0001.pdf PDF
Attachment_5_-_Fillable_889_Form_2.pdf PDF
Attachment_4_-_Project_Map.pdf PDF
Attachment_3_-_Wage_Determination_-_San_Miguel_County.pdf PDF
Sol_140L1725Q0010.pdf PDF
Attachment_2_-_Bid_Schedule.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior Bureau of Land Management

Uncompahgre Field Office

Norwood Warehouse Improvements 2025

SPECIFICATIONS

BLM Uncompahgre Field Office Norwood Warehouse Improvements

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 33 00 SUBMITTAL PROCEDURES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 31 00 PEDESTRIAN GATE

DI VI SI ON 33 - UTI LI TI ES

33 11 10 REPLACE YARD HYDRANT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 PROJECT DESCRIPTION

Install a pedestrian gate in an existing chain link fence. Replace an existing yard hydrant.

1.2 LOCATION

The project is located at the intersection of Highway 145 and Hazel street. Project address:

40835 State Highway 145 Norwood CO 81423

1.3 WORK SCHEDULE

Work shall occur Monday - Friday. Work shall not occur on Federal Holidays, December 26-31, and the day after Thanksgiving. Work shall be completed within 150 days of the Notice to Proceed. The work will not take 150 days to complete. The extended time period is to provide plenty of opportunity for the contractor to fit the project into their existing work schedule.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

Payment items for the work of this contract for which contract payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job are included in the listed job item most closely associated with the work involved. The price and payment made for each item listed constitutes full compensation for furnishing all labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1 PROVIDE PEDESTRIAN GATE

1.1.1 Payment

Payment will be made for all costs associated with providing and installing a pedestrian gate.

1.1.2 Unit of Measure

Unit of measure: Job.

1.2 REPLACE YARD HYDRANT

1.2.1 Payment

Payment will be made for all costs associated with replacing (providing and installing) a yard hydrant.

1.2.2 Unit of Measure

Unit of measure: Job.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 3

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only.

1.2 INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer's Representative is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract.

This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work; and does not relieve the Contractor of the requirement to furnish samples for testing by the Government.

1.3 GOVERNMENT APPROVING AUTHORITY

The Contracting Officer's Representative will:

a. Note the date on which the submittal was received.

b. Review submittals for approval within 10 days of receipt.

c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, one copy of the submittal will be retained by the Contracting Officer's Representative and one copy of the submittal will be returned to the Contractor.

1.3.1 Review Notations

Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided the Contractor takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until

SECTION 01 33 00 Page 4 resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

e. Submittals marked "receipt acknowledged" indicate that submittals have been received by the Government. This applies only to "information-only submittals" as previously defined.

1.4 DISAPPROVED SUBMITTALS

Make corrections required by the Contracting Officer's Representative. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer.

If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.5 APPROVED SUBMITTALS

The Contracting Officer's approval of submittals is not to be construed as a complete check.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 33 00 Page 5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES

Norwood Warehouse Improvements

33 11 10 2.1 GYard Hydrant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SECTION 32 31 00

PEDESTRIAN GATE

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Install a pedestrian gate in an existing chain link fence.

PART 2 PRODUCTS

2.1 PEDESTRIAN GATE

The pedestrian gate shall be constructed of the same type of materials as the existing chain link fence, except where detailed otherwise. All gate material shall be galvanized steel. Paint welds with zinc-rich paint.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

The contractor is responsible for locating and avoiding underground utilities. Contractor shall repair any damage caused to underground utilities as a result of the work.

3.2 EXISTING FENCE

The existing chain link fence posts are approximately 10 feet apart. The existing top rail is approximately 7 feet tall. There is approximately one foot of barbed wire above the top rail.

3.3 PEDESTRIAN GATE PICTURE

The pedestrian gate pictures shown on the drawings are an example of the gate required.

3.4 PEDESTRIAN GATE LOCATION

Install the pedestrian gate at the approximate location shown on the drawings.

3.5 PEDESTRIAN GATE

Match gate height to existing fence. Pedestrian gate shall have an exit bar, security shroud, lock, barbed wire. Gate shall be plumb in the closed position. Maximum gap of 2 inches between the gate and the post.

Gate shall swing outward. Fence posts shall be set in concrete.

3.6 GATE LOCK

Rekey the gate lock cylinder to match an existing BLM key. BLM key will be provided after contract is awarded.

3.7 SITE SECURITY

Provide site security at all times during construction and installation of the gate.

SECTION 32 31 00 Page 6

SECTION 32 31 00 Page 7

SECTION 33 11 10

REPLACE YARD HYDRANT

PART 1 GENERAL

1.1 DESCRIPTION OF WORK

Replace an existing, broken, yard hydrant.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Yard Hydrant ; G

PART 2 PRODUCTS

2.1 YARD HYDRANT

Provide a frost proof yard hydrant, lead free, suitable for potable water.

PART 3 EXECUTION

3.1 UNDERGROUND UTILITIES

The contractor is responsible for locating and avoiding underground utilities. Contractor shall repair any damage caused to underground utilities as a result of the work.

3.2 YARD HYDRANT

Remove existing broken yard hydrant. There are several yard hydrants on site, verify the yard hydrant to be replaced with the Contracting Officer prior to replacement.

Contractor shall verify the size (bury depth) required to match existing water line prior to submitting, and ordering, the replacement yard hydrant. Install the yard hydrant in accordance with the manufacturer's written installation instructions.

SECTION 33 11 10 Page 8

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT DESCRIPTION
1.2 LOCATION
1.3 WORK SCHEDULE
PART 2 PRODUCTS
PART 3 EXECUTION
01 20 00 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 PROVIDE PEDESTRIAN GATE
1.1.1 Payment
1.1.2 Unit of Measure
1.2 REPLACE YARD HYDRANT
1.2.1 Payment
1.2.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
01 33 00 - SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 INFORMATION ONLY SUBMITTALS
1.3 GOVERNMENT APPROVING AUTHORITY
1.3.1 Review Notations
1.4 DISAPPROVED SUBMITTALS
1.5 APPROVED SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 00 - PEDESTRIAN GATE
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
PART 2 PRODUCTS
2.1 PEDESTRIAN GATE
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
3.2 EXISTING FENCE
3.3 PEDESTRIAN GATE PICTURE
3.4 PEDESTRIAN GATE LOCATION
3.5 PEDESTRIAN GATE
3.6 GATE LOCK
3.7 SITE SECURITY
DIVISION 33 - UTILITIES
33 11 10 - REPLACE YARD HYDRANT
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.2 SUBMITTALS
PART 2 PRODUCTS
2.1 YARD HYDRANT
PART 3 EXECUTION
3.1 UNDERGROUND UTILITIES
3.2 YARD HYDRANT