MONONGAHELA RIVER LOCKS AND DAMS
SCOPE OF WORK AND SPECIFICATIONS
CHARLEROI MACHINERY HOUSE ROOFS COATING
1. GENERAL REQUIREMENTS
1.1 GENERAL
1.1.1 Project Purpose
The purpose of this project is to recoat all the Dam Machinery Houses Roofs at Charleroi L&D totaling six roofs, as well as install permanent fall protection. The recoating will involve an initial coat of asphalt-based clay emulsion, demobilization for thirty days to allow for cure, and the application of an acrylic topcoat. The work is located on the Dam Machinery Houses at Charleroi Locks and Dam located at 1900 Route 906, Belle Vernon, PA 15012-4514. All work shall be done in a professional manner and in accordance with industry standards. The work covered by this specification consists of providing all equipment, materials, and labor for cleaning, preparing, priming, coating, and waste removal for roof coating on six machinery house buildings. The purpose of this contract is to seal the roof to prevent water from entering the buildings. The buildings are located at the top of the Charleroi dam, and house the dam gate operating machinery and controls. No utilities will be made available in execution of this work. There is no elevator access to the dam / Machinery houses. The Contractor shall access the dam / Machinery houses via the abutment side of dam and walk up the stairs within the dam pier to the machinery house level. The Government will not provide any assistance in lifting materials or removing waste to the Contractor from the top of the dam.
1.1.2 Dam Machinery Houses Roofs Description
There are six (6) Dam Machinery Houses. See Reference drawings, for details of the existing Dam Machinery Houses. However, the Dam Machinery House roofs are low slope with no pronounced ridge as depicted in drawings. See photos for the current roof geometry. Drawings are for reference only, and show locations, approximate sizes, elevations, etc. Each roof is approximately 20 feet by 19 feet with a 10 inch lip along the entire perimeter, for a total of approximately 445 square feet. Also, there is a 4 inch total fall in the roof from upstream to downstream (approximately ¼” in 12” slope). Elevation for each roof is approximately ten feet above walkway. There are 5 to 7 coats of aluminum powder mixed in an asphalt-base liquid, which is why a special emulsion will be necessary that will adhere to the asphalt-base and encapsulate the aluminum flakes prior to the application of the Acrylic Elastomeric roof coating system. Contractor shall remove loose coating material on existing roofs and clean all seams of the metal substrate. Contractor shall properly prepare and treat all rust areas with rust converter.
Contractor shall seal holes, existing seams, and penetrations. Contractor shall apply an initial coat of asphalt-based clay emulsion and acrylic topcoat. All coatings within the Acrylic Elastomeric roof coating system shall be compatible with, and not cause degradation of the existing roof material, and shall be recommended for this application by the manufacturer. The Contractor shall verify dimensions and clearances in the field before beginning work.
1.1.3 Labor and materials
The Contractor shall provide all labor and materials necessary to remove and replace the existing roof coating and must furnish all equipment, labor, and layout of work, supervision, and materials necessary to complete the work as shown and as specified. The Contractor shall be responsible for transport of materials to and from the site and to prevent removed materials from entering the river. All material provided in the performance of this contract shall be unused and meet the requirements of the specifications. Materials are not to be installed in adverse weather conditions. Details of the building construction are shown on the attached reference drawings. All materials shall be properly stored, handled, and protected from moisture or other damages. Liquid components are to be properly mixed prior to application.
1.1.4 Existing items
As shown in the photos, the roofs are painted steel, with a polyurethane coating, with spots of rust and holes. The Acrylic Elastomeric roof coating system shall have a proper waterproof seal around all existing items that protrude thru or from the roof. The roofs and all fixtures shall be cleaned up, touched up as necessary, and repaired to the satisfaction of the Administrative Contracting Officer (ACO) or their representative.
1.1.5 Fall Protection
The government is required to have a fall protection system in place to protect personnel during light maintenance and inspections occurring on average twice a year. The Contractor shall be required to install permanent roof fall protection anchors (Qty: 12, 2 per roof) for use as part of a personal fall arrest system that permits access to the entirety of each roof for 2 people (per roof), government requirement. The anchors shall be installed to meet or exceed the requirements of EM 385-1-1, OSHA 1910, OSHA 1926 Subpart M, ANSI Z359, and ANSI A10.32. Where the requirements of these standards differ, the most stringent shall be followed. The anchors shall be made of stainless steel or other corrosion resistant materials designed to be installed permanently without damaging the roofing system. The Contractor shall submit a Permanent Roof Fall Protection Anchor Plan that includes product data on the proposed anchors, as well as layout and installation details for review and approval prior to installation.
1.2 MEASUREMENT AND PAYMENT
Payment shall include all costs of labor, materials, supplies, equipment, supervision, cleanup, and other costs of completing the work as specified. All material provided in the performance of this contract shall be new and meet the requirements of the specifications.
1.3 PROTECTION OF PERSONNEL
The Contractor shall insure that adequate measures are in place to protect workers, facility operation personnel and the public from injury due to the operations being performed. All protective measures shall be in accordance with EM 385-1-1.
1.4 SAFETY
In addition to the detailed requirements included in the provisions of this contract, all work shall comply with the most recent edition of the USACE Engineering Manual (EM) 385-1-1, “Safety and Health Requirements Manual”, and all applicable federal, state, and local laws, ordinances, criteria, rules, and regulations. If there are any standards that require interpretation, submit matters to the appropriate administrative agency for resolution before the commencement of work. Where the requirements herein, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3 85-1-1.pdf
The Superintendent, QC Manager, and SSHO are subject to dismissal if any of the required regulatory requirements are not being effectively carried out. If dismissal occurs, project work will be stopped and no work shall proceed until a suitable replacement is approved and the appropriate requirements are assured to be effectively carried out.
1.4.1 Accident Prevention Plan.
An Accident Prevention Plan (APP) (Attachment 3 – Accident Prevention Plan (APP) Template) is a safety and health policy and program document that shall be contract-and/or job-specific. The APP shall be developed by the Contractor and shall interface with the Contractor's overall Safety and Health Program, such that any portions of the Contractor's overall program referenced in the APP shall be included as appropriate.
The Contractor shall develop the APP in accordance with EM 385-1-1, Appendix A, and shall address each of the elements/sub-elements in the outline contained in the appendix in the order that they are provided in the manual, and as supplemented herein. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification. The APP shall be written in English by the Prime Contractor and shall articulate the specific work, work processes, equipment to be used, and hazards pertaining to the contract. The non-mandatory APP Checklist, Form A- 2 of the EM 385-1-1, may be used to ensure each area of required information has been provided as part of the APP to the Contracting Officer.
Once accepted by the Contracting Officer, the APP and all attachments will be enforced as part of the contract. Disregarding provisions of this contract or the accepted APP is a cause for stopping of that portion of the work at the direction of the Contracting Officer until the matter has been rectified.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
A copy of the accepted APP shall be available on the worksite at all times. The Contractor shall provide on-going evaluations of the APP throughout the life of the project. Changes, revisions, and updates to the APP shall be reviewed and accepted by the Contracting Officer, project superintendent, SSHO, and Quality Control Manger.
Due to the recent COVID-19 pandemic, all Contractors that perform operations on LRP USACE-owned/operated facilities are to include an Infectious Disease Exposure Prevention, Preparedness, and Response Plan as an addition to their overall APP. The plan shall describe how the Contractor will implement the requirements and best practices issued by Federal, State, and Local authorities in order to prevent the spread of COVID and/or other infectious diseases
1.4.2 Risk Management
A risk management assessment tool, such as an activity hazard analysis (AHA), shall be developed by the Contractor performing the work for each type of activity the Contractor will perform as part of the Contract. The assessment shall identify the job steps, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented to control the hazards. Risk assessments shall be submitted for review at least 15 working days prior to the start of the activity, task, or defined feature of work is set to begin. The Government reserves the right to require the Contractor to revise and resubmit any documents if they fail to effectively identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented. Work shall not begin until the assessments have been accepted by the COR and discussed with all engaged in the activity.
These risk assessments shall be developed in accordance with EM 385-1-1 Section 1, or as specified by the Contracting Officer. The Contractor may use the AHA form in Attachment _ to assist with completion of their risk assessments.
Each employee performing work as part of an activity, task, or DROW shall review the risk assessment for the activity and sign the signature log designated for the assessment prior to beginning work. A signature log shall be maintained for each risk assessment
1.4.3 Mishap Reporting
A mishap is any unplanned, undesired event that occurs during the course of work being performed, to include, accidents, incidents, and near misses. All mishaps shall be reported to the Contracting Officer or their representative within 24-hours after notification from the affected employee(s). Contractors are responsible for maintaining an OSHA Log of Work-Related Injuries and Illnesses (Form 300) and complying with all reporting and recordkeeping requirements specified in 29 Code of Federal Regulations
(CFR) 1904.
1.4.4 Hazardous Material Exclusion
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as, nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury, polychlorinated biphenyls (PCBs), Diisocyanates, lead, lead-based paint (LBP), and hexavalent chromium, are prohibited.
The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO), Safety Office, and the Contracting Officer prior to excepted items of radioactive material and devices being brought on site.
1.4.5 Unforeseen Hazardous Material
USACE shall identify and communicate all known hazardous materials such as Polychlorinated biphenyls (PCBs), lead paint, asbestos, and other OSHA regulated chemicals (i.e. 29 CFR 1910.1000) in which the Contractor may come into contact during the course of activities. If material is encountered that was not indicated, but may be hazardous to human health upon disturbance, that portion of the work shall stop and the Contracting Officer immediately notified. The Government will determine within 14 days of notification if the material is or is not considered hazardous. If the material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If the material is determined to be hazardous or dangerous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4, Changes and FAR 52.236-2, Differing Site Conditions.
1.4.6 Minimum Personal Protective Equipment.
Personal Protective Equipment (PPE) is governed in all areas by the nature of work personnel and performing based on conducted hazard evaluations. AHAs shall detail the PPE to be used that will provide appropriate protection for the work to be performed when required. All PPE shall be provided by the Contractor, used, and maintained in a sanitary and reliable condition whenever the hazard dictates use.
Mandatory PPE, at minimum, shall include: hard hat (construction sites), long pants, short sleeve shirts, and leather or protective work shoes or boots. Personal Floatation Devices (PFDs) shall be worn at all times when working above or near water in which other fall protection methods do not provide the appropriate protection.
1.4.7 Designated Persons.
The Contractor shall provide Qualified and/or Competent Persons in accordance with EM 385-1-1, OSHA, ANSI, and where specified herein. All Qualified and Competent Persons shall be designated in writing and shall meet the requirements for the specific activity for which they are designated.
Competent Persons identified in the Contractor’s Safety and Health Program and Government-accepted APP shall be onsite at all times when the work that presents the hazards associated with the competency is being performed.
Certificates of Qualification/Competency shall be provided to the Contracting Officer for review and provided as part of the applicable AHAs and appendices of the APP.
1.4.8 Damage Reports.
All instances where Government materials, supplies, property, and/or equipment are damaged, shall be reported immediately to the Contracting Officer.
All overhead utility lines shall be identified and protected from the Contractor’s operations. The Contractor shall address in the accident prevention plan, specific measures for working around overhead utility lines.
1.5 KEY PERSONNEL
1.5.1 Superintendent
Provide project superintendent with a minimum of 5 years’ experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.5.2 Quality Control System Manager (QCSM)
The QCSM is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years’ construction experience on roof installations similar to the tasks in this Contract. This QCSM is to always be onsite during construction and to be employed by the prime Contractor. If qualified, the QCSM may serve as the Site Safety and Health Officer (SSHO), but may not serve as the Superintendent.
1.5.3 Site Safety and Health Officer (SSHO)
The Contractor shall employ a minimum of one Competent Person at each project site to function as the primary Site Safety and Health Officer (SSHO) to implement and administer the Contractor’s safety program and the Government-accepted Accident Prevention Plan (APP). The SSHO is a full-time responsibility and shall be an employee other than the superintendent, that reports directly to a senior project, or corporate, official. The SSHO shall be present at the project site and be located so they have full mobility and reasonable access to all major work operations during the shift. The SSHO shall meet all training and experience qualifications as outlined in EM 385-1-1 Section 01, Paragraph A.17. The SSHO may also serve as the Quality Control System Manager (QCSM), but the SSHO may not serve as the Superintendent.
SSHOs shall attend the pre-construction conference, pre-work meetings, including preparatory and periodic in-progress meetings, if qualified.
1.6 PROJECT SUBMITTALS.
The Contractor shall provide submittals for Government Approval. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications. It will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work.
1.6.1 Manufacturer’s Product Literature
Product data shall include catalog cuts, specifications or other descriptive data for materials proposed for use, including copies of Manufacturer’s warranties and required warranty maintenance. All appropriate descriptive data shall be clearly indicated on the submittal. The bidder shall submit for approval:
• Manufacturer’s product literature for the fall protection hardware/system.
• Manufacturer’s product literature for the Asphalt-based, Clay Emulsion
Roof Coating.
• Manufacturer’s product literature for the Acrylic Elastomeric roof coating system.
• Manufacturer’s product literature for the cleaning solution used in the roof coating system.
• Manufacturer’s product literature for any rust converter utilized on the project.
• Manufacturer’s product literature for any other items utilized for the roofing system not otherwised mentioned above.
1.6.2 Manufacturer’s Certificate
Submit proof from the roof system manufacturer attesting that the installer has the proper qualifications for installing the roof systems per the manufacturers recommendations.
Installer must have at least the minimum years’ experience required by the manufacturer as an approved, authorized, or licensed installer with that manufacturer and be approved at a level capable of providing the specified warranty, unless otherwise approved by the Contracting Officer.
1.6.3 Permanent Roof Fall Protection Anchor Plan
The Government is required to have a fall protection system in place to protect personnel during light maintenance and inspections. The Contractor shall be required to install permanent roof fall protection anchors for use as part of a personal fall arrest system that permits access to the entire roof for 2 people. The anchors shall be installed to meet or exceed the requirements of EM 385-1-1, OSHA 1910, OSHA 1926 Subpart M, ANSI Z359, and ANSI A10.32. Where the requirements of these standards differ, the most stringent shall be followed. The anchors shall be made of stainless steel or other corrosion resistant materials designed to be installed permanently without damaging the roofing system. The Contractor shall submit Permanent Roof Fall Protection Anchor Plan that includes product data on the proposed anchors, as well as layout and installation details for review and approval prior to installation.
1.6.4 Inspection Reports
Inspection Report. Once the roof is bare, the Contractor shall provide an Inspection Report. This Inspection Report shall give the condition of the roof and any recommendations of the Contractor.
1.6.5 Qualifications of Installer
System installer shall be approved, authorized, or licensed in writing by the system manufacturer and shall have at least the minimum experience required by the manufacturer as an approved, authorized, or licensed installer with that manufacturer and be approved at a level capable of providing the specified warranty. Contractor shall provide documentation of manufacturer’s certification requirements with own credentials.
1.6.6 Credentials of Designated Persons & Contractor
Provide credentials for the following personnel: SSHO, Fall Protection.
Provide a copy of the Manufacture’s Certificate.
1.6.7 Accident Prevention Plan (APP)
An Accident Prevention Plan (APP) (Attachment 3 – Accident Prevention Plan (APP) Template) is a safety and health policy and program document that shall be contract-and/or job-specific. The APP shall be developed by the Contractor and shall interface with the Contractor's overall Safety and Health Program, such that any portions of the Contractor's overall program referenced in the APP shall be included as appropriate.
The Contractor shall develop the APP in accordance with EM 385-1-1, Appendix A, and shall address each of the elements/sub-elements in the outline contained in the appendix in the order that they are provided in the manual, and as supplemented herein. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification. The APP shall be written in English by the Prime Contractor and shall articulate the specific work, work processes, equipment to be used, and hazards pertaining to the contract.
The non-mandatory APP Checklist, Form A-2 of the EM 385-1-1, may be used to ensure each area of required information has been provided as part of the APP to the Contracting Officer.
The Contractor's APP shall be job-specific and must include work to be performed by subcontractors. It is understood that the APP is submitted prior to work starting and some of the project-specific information is not yet known. If sub-contractors and/or suppliers are not known at the time of initial APP submission, the Contractor shall include the following statement in their APP: "The subcontractors for the following defined features of work (DFOW)/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed." All known information shall be provided and additional information submitted to the Contracting Officer for acceptance as it becomes known.
Once accepted by the Contracting Officer, the APP and all attachments will be enforced as part of the contract. Disregarding provisions of this contract or the accepted APP is a cause for stopping of that portion of the work at the direction of the Contracting Officer until the matter has been rectified.
A copy of the accepted APP shall be available on the worksite at all times, and each sub-contractor shall be provided a copy to comply with. A signature log shall be completed by each sub-contractor foreman attesting that they have read and understand the APP.
The Contractor shall provide on-going evaluations of the APP throughout the life of the project. Changes, revisions, and updates to the APP shall be reviewed and accepted by the Contracting Officer, project superintendent, SSHO, and Quality Control Manger.
1.6.7.1 Infectious Disease Exposure Prevention, Preparedness, and
Response Plan
Due to the recent COVID-19 pandemic, all Contractors that perform operations on LRP USACE-owned/operated facilities are to include an Infectious Disease Exposure Prevention, Preparedness, and Response Plan as an addition to their overall APP. The plan shall describe how the Contractor will implement the requirements and best practices issued by Federal, State, and Local authorities in order to prevent the spread of COVID and/or other infectious diseases.
1.6.8 Project Schedule
Project Schedule must be provided in a bar chart format. Schedule must be submitted 2 weeks after Notice to Proceed (NTP), at least 2 weeks prior to the proposed start date, and updated at least weekly.
1.6.9 Resident Management System (RMS)
The Contractor and Government shall use the Resident Management System (RMS) to assist in monitoring and administration of this contract. The Contractor’s roles as well as software details for the RMS system are outlined in the attachment titled “Attachment 6 – Resident Management System Requirements”
1.6.10 Quality Control Plan
The contractor shall complete and submit a Quality Control Plan (Attachment 4 – Quality Control Plan (QCP) Template). The quality control system shall consist of plans, procedures, and organization necessary to produce an end product which complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of theses specifications. Superintendent and QC shall be on site at all times work is being done.
1.7 WARRANTY
Submit sample certificates for approval.
1.7.1 Roof Manufacturer Warranty
Furnish roof manufacturer's ten (10) year, no dollar limit, full roof system materials and installation workmanship warranty, including all flashing, and accessory materials necessary to construct a complete, watertight roof system. Provide warranty directly to the Government and commence warranty effective date and time of Government's acceptance of the roof work. The warranty shall state that:
1) If within the warranty period the roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, splits, tears, cracks, delaminates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the roof system assembly and correction of defective workmanship shall be the responsibility of the roof membrane manufacturer. All costs associated with the repair or replacement work shall be the responsibility of the roof membrane manufacturer.
2) When the manufacturer and his approved applicator fail to perform the repairs within seventy-two (72) hours of notification, emergency temporary repairs performed by others shall not void the warranty.
1.7.2 Roofing System Installer Warranty
The roof system installer shall warrant for a minimum period of two (2) years that the roof system, as installed, is free from defects in installation workmanship, to include the roof membrane, flashing, insulation, accessories, all attachments, and sheet metal installation integral to a complete watertight roof system assembly. Write the warranty directly to the Government. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer in responsible all costs associated with the repair or replacement work.
1.8 PROJECT/SITE CONDITIONS
1.8.1 Reference Drawings
Attached Reference Drawings showing existing conditions to the best knowledge of the Government. Unless otherwise noted, dimension, elevations, and other features shown on contract drawings, are generally based on the reference drawings supplemented by field surveys. The Government cannot guarantee the accuracy of the dimensions, elevations, and features shown on reference drawings or on contract drawings which are based on the reference drawings, and it shall be the responsibility of the Contractor, whenever necessary, to verify all elevations and the dimensions by measurements in the field. All elevations are referenced to the local datum used for the original construction of the structure. The Contractor shall verify elevations and dimensions before laying out the work. The Contracting Officer shall be notified of any discrepancies prior to commencing work.
1.8.2 Verification of Field Conditions
The Contractor shall verify all dimensions and conditions in the field and shall advise the Contracting Officer of any discrepancy before performing any work.
1.8.3 Work Areas
The Contractor shall be fully responsible for determining the methods used to transport materials and equipment to and from the areas as well as the removal of waste materials from such spaces. The Contractor shall ensure that his operations will not interfere with the operation of the project or the duties of project personnel. Transport of materials and equipment shall be the responsibility of the Contractor.
1.8.4 Time of Performance
The Contractor shall confine all operations at the work site between the hours of 7:30 AM and 4:00 PM, Monday through Friday, unless otherwise approved. Work will not be permitted on weekends or Federal holidays unless otherwise approved.
Federal Holidays include: New Year's Day, Birthday of Martin Luther King,Jr., Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
1.8.5 Period of Performance (PoP)
The Contractor shall complete all work before November 15, 2021 or 180 days, whichever occurs first.
1.9 PROTECTION OF GOVERNMENT PROPERTY
The Contractor shall protect all government property during the performance of this contract. All damage to existing government property as a result of the Contractor’s work shall be repaired or replaced to the satisfaction of the Contracting Officer. Exposed roof and building interior shall be protected at all times. At areas where existing roofing materials have been removed, the Contractor shall install and maintain temporary protection from the weather until permanent installation of roofing materials can be made. The Contractor shall coordinate roof demolition with the Contracting Officer.
Work area shall be cleaned by the Contractor after construction is complete.
1.10 INSPECTIONS AND ACCEPTANCE OF WORK
Notwithstanding other provisions of this contract, all materials and work to be performed under this contract shall be inspected and accepted by the Contracting Officer or their representative. The Contracting Officer shall be the individuals solely authorized to reject materials, disapprove or approve any work in progress, or order or direct any revision or change to the plans and specifications as presently shown and stated.
1.11 DISPOSAL
All materials removed in the performance of this contract and not reused shall become the property of the Contractor and be disposed of offsite in accordance with Federal, State and Local regulations.
1.12 POINTS OF CONTACT
Prior to commencement of any work being performed on site, the Contractor shall participate in a Pre-work Meeting with the Administrative Contacting Officer (ACO) and the Lockmaster on-site.
• Charleroi Lock and Dam Lockmaster – Alan Nogy, 724-684-8965, Alan.Nogy@usace.army.mil
• Administrative Contracting Officer (ACO) – Kirk McWilliams, 724-555-2005, Kirk.A.McWilliams@usace.army.mil
1.13 SECURITY REQUIREMENTS
1.13.1 Access and General Protection and Security Policy and Procedures
The Contractor and all associated subContractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures. The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation the USACE Security Office. The Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes. The Contractor must submit the full name, Social Security Number, and Date of Birth for all associated Contractor or subContractor employees to the USACE Security Office, Joseph M. Bali, 412-395-7162, joseph.m.bali@usace.army.mil. LRP Security Information Sheet, (Attachment 5: LRP Security Information Sheet) is to be completed and returned to Mr. Bali. The contract number and tile of the project including the location is to be identified on the Sheet. To protect employee PII, the submission of the completed form through a secure fax is preferred; however, a secured email is acceptable. If e-mailing required information, e-mail must be encrypted to protect Personally Identifiable Information (PII).The District retains the right to deny any Contractor and subContractor employee from working on one of its contracts based on final background investigation results. The contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB), applicable installation, facility and area commander installation/facility access and local security policies and procedures.
1.13.2 Instant Verification of Employment Eligibility (E-Verify)
The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e-verify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the KO no later than three (3) business days after the notice to proceed.
1.13.3 Employee Identification and Background Check
The Contractor shall be responsible for furnishing an identification badge/card to each employee prior to the employee working on-site and for requiring each employee engaged on the work to display identification. Identification shall consist of nametags with the name of the Contractor and the employee's name. Additionally, a valid state driver's license or other Government-issued photo identification card is required for positive identification. Each employee shall be subject to a background check in accordance with "Homeland Security Presidential Directive (HSPD) 12: Policy for a
Common Identification Standard for Federal Employees and Contractors" (HSPD- 12).
Only those individual employees that were specifically identified and approved shall be cleared to work on Government property.
2. MATERIALS
Coordinate with other subsections related to the roof installation. Furnish a combination of specified materials that comprise a roof system acceptable to the roof coating manufacturer and meeting specified requirements. Protect materials provided from defects and make suitable for the service and climatic conditions of the installation.
2.1 Asphalt-based, Clay Emulsion Roof Coating
Apply Asphalt-based, Clay Emulsion Roof Coating according to manufacturer’s specifications.
2.2 Acrylic Elastomeric roof coating system
Acrylic Elastomeric roof coating systems may be rolled or sprayed on. A catalyst may be necessary for curing. Sheet metal patches shall be painted 14 gauge carbon steel.
3. EXECUTION
3.1 Preparation
Remove all loose coating and prepare to a clean substrate. Clean all surfaces to be dry and free of dust, dirt, oil, loose materials, peeling paint etc. Remove rust with wire brush, sandblast, or mechanically abrade until substrate is smooth and rust free. Rusty metal must be cleaned and primed with a rust converting primer. Surfaces with mildew or biological growth should be cleaned with an agent designed to remove and retard mildew growth. Thoroughly rinse areas per manufacturer’s recommendation and allow to dry completely. Other areas shall be swept clean to remove loose dirt and dust. Previously coated surfaces must be completely dry and cured.
Damaged sheet metal shall be repaired by using pop rivets. Sheet metal patches shall be painted 14 gauge carbon steel.
• Measure a piece of sheet metal for the repair with a measuring tape. Mark the dimensions and shape using a metal scribe. The patch will overlap the spot to be repaired by at least 2 inches.
• Cut the sheet metal along the scribed lines using a handheld, rotary cutting tool equipped with a metal-cutting wheel.
• Place the repair sheet metal over the damaged area. Hold firmly in place and drill the appropriate size hole thru both layers of metal using a drill fitted with the required size drill bit for the pop rivet to be used.
• Place the long stem of a rivet into the pop rivet tool die. The die diameter must be the same as the stem diameter. The stem will not be loose once inserted into the tool if the die is correct.
• Insert the rivet into the drilled hole through each layer of sheet metal. Ensure the rivet is fully seated up to its shoulder. Maintain inward pressure and squeeze the tool handle until the stem breaks free from the rivet.
• Repeat Steps 3, 4 and 5 for the remaining rivets required for the repair. The amount of space between rivets depends on the work. Typically, a distance of 1 to 3 inches is sufficient for most repairs.
3.2 Asphalt-based, Clay Emulsion Roof Coating
An initial Asphalt-based, Clay Emulsion Roof Coating shall be applied to the prepared roof surfaces. The Contractor shall ensure that the coating is compatible with coating materials and existing substrates. All seams shall be filled, to a smooth finish, with a compatible sealer to ensure a uniform and watertight seal.
Installation Methods
• Coatings must be mechanically mixed thoroughly before and during application as identified in the manufacturer’s specification.
• Do not apply if there is a threat of rain within 24 hours, or the period of time as identified in the manufacturer’s specification.
• Thirty (30) days must elapse before the Acrylic top coat is applied to ensure proper cure of the material. The Contractor will demobilize from the site between the application of the clay emulsion roof coating and the acrylic top coat.
3.3 Acrylic-based Top Coating
The Acrylic-based Top Coating must be rated for exterior use and be compatible with the existing substrate and primers. There shall be no thinning of the product to aid in application or extend coverage of material.
Application
• Pressure Wash roof with Cleaner compatible with acrylic coating as identified in the manufacturer’s specification.
• Application shall only be done in the time available so that all applied material has sufficient time to dry to the touch (tack free time) before any rain or ambient moisture contacts the surface.
• Application should be completed when air and material temperatures are between 40
°F and 120 °F.
• Application shall be in accordance with manufacturer’s specification, by roller, brush, or spray.
• A uniform coat shall be applied over entire surface, avoiding excessive rolling, and/or brushing.
• Application at penetrations should be done as to not leave any voids or bubbles.
• Application of coating shall follow manufacturer’s specification and be applied in sufficient thickness and quantity to meet the material specifications and Manufacturer’s warranty.
3.4 Storage and Disposal
All materials used for cleaning, priming, and coating the roof shall be stored in accordance with the manufacturer’s specification. All debris generated, empty or used containers, application tools, etc. shall be disposed of by the Contractor in accordance with manufacturer’s recommendation and applicable standards.
3.5 Protection of Equipment
Necessary measures shall be taken as needed to prevent dust, dirt, debris, cleaners, and coatings from falling in or on any exposed machinery or machinery controls.
3.6 Protection of Aluminum
Aluminum surfaces shall not directly contact other metals except stainless steel, zinc, or zinc coating. Where aluminum contacts another metal, paint the dissimilar metal with a primer followed by two coats of aluminum paint. Where drainage from a dissimilar metal passes over aluminum, paint the dissimilar metal with a non-lead-pigmented paint.
3.7 Protection of Applied Roofing
At the end of the day's work and when precipitation is imminent, protect applied roofing system from water intrusion.
3.8 Correction of Deficiencies
Where any form of deficiency is found, take additional measures as deemed necessary to determine the extent of the deficiency and perform corrective actions as directed by the Contracting Officer.
3.9 Clean Up
Remove debris, scraps, containers and other rubbish and trash resulting from installation of the roofing system from job site each day. Following completion of the work, remove debris, equipment, and materials from the site. Restore existing facilities in and around the work areas to their original condition.
Charleroi L&D Roof Photos
Figure 1 - CHR-Machinery Housing Roof lineup
Figure 2 - CHR-Machinery Housing Roof, note lack of ridge
Figure 3 - CHR-Roof water diverter
Figure 4 - CHR-Roof underside
Figure 5- Roof Drawing
Figure 6 – Site Plan
| 3.1 Preparation |
| Damaged sheet metal shall be repaired by using pop rivets. Sheet metal patches shall be painted 14 gauge carbon steel. |
| Measure a piece of sheet metal for the repair with a measuring tape. Mark the dimensions and shape using a metal scribe. The patch will overlap the spot to be repaired by at least 2 inches. |
| Cut the sheet metal along the scribed lines using a handheld, rotary cutting tool equipped with a metal-cutting wheel. |
| Place the repair sheet metal over the damaged area. Hold firmly in place and drill the appropriate size hole thru both layers of metal using a drill fitted with the required size drill bit for the pop rivet to be used. |
| Place the long stem of a rivet into the pop rivet tool die. The die diameter must be the same as the stem diameter. The stem will not be loose once inserted into the tool if the die is correct. |
| Insert the rivet into the drilled hole through each layer of sheet metal. Ensure the rivet is fully seated up to its shoulder. Maintain inward pressure and squeeze the tool handle until the stem breaks free from the rivet. |
| Repeat Steps 3, 4 and 5 for the remaining rivets required for the repair. The amount of space between rivets depends on the work. Typically, a distance of 1 to 3 inches is sufficient for most repairs. |
| 3.2 Asphalt-based, Clay Emulsion Roof Coating |
| Installation Methods |
| Coatings must be mechanically mixed thoroughly before and during application as identified in the manufacturer’s specification. |
| Do not apply if there is a threat of rain within 24 hours, or the period of time as identified in the manufacturer’s specification. |
3.3 Acrylic-based Top Coating