Attachment 1 - SOW - WRRC Dry Ice Gas Liquid Cylinder Dewar Supply.pdf
PDF 90 KB Posted
- Solicitation number
- 12905B22Q0199
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Schedule of Prices for Base Year and Option Year 1.xlsx | XLSX spreadsheet | |
| 12905B22Q0199 - RFQ - Combined Syn-Sol - Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work:
USDA-ARS-WRRC Dry Ice, Gas and Liquid Cylinder & Dewar supply contract
Background:
The United States Department of Agriculture, Agricultural Research Service, Western
Regional Research Center (USDA-ARS-WRRC) at 800 Buchanan St., Albany, California
94710 has a requirement for the following (see table below) to be delivered weekly (Dry ice) and on an as-needed basis, typically weekly, but multiple times per month (Cylinders
/ Dewars). The following list of deliverables are closely representative to the WRRC’s requirements, but there are infrequent times when the contractor may be asked to provide other cylinder gases.
Item Size Quantity & Frequency
Dry Ice Pellets 560 lbs Weekly
Liquid Nitrogen 22PSI 160-180 L dewar As Needed, typically 18 per month
Nitrogen Gas - Industrial Grade 250 size cylinder As Needed, typically 7 per month
Nitrogen Gas - Ultra High
Purity 99.999%
300 size cylinder As Needed, typically 2 per month
Helium - Ultra High Purity
99.999%
300 size cylinder As Needed, typically 10 per month
Argon - Industrial Grade 250 size cylinder As Needed, typically 1 per month
CO2 liquid - Industrial Grade 250 size cylinder As Needed, typically 3 per month
CO2 liquid - Industrial Grade with eductor (tube)
250 size cylinder As Needed, typically 2 per month
Oxygen - Industrial Grade 250 size cylinder As Needed, typically 1 per month
Air – Ultra High Purity
99.999%
300 size cylinder As Needed, typically 0.5 per month
Any quote provided must include all charges associated with the ordering and the delivery of gases and items as needed. Cylinder, dewar, and dry ice containers must be provided, will not be provided by the USDA. If cylinder, dewar, and dry ice container rental is a part of your proposal, you must include the charges associated with the delivery of gases and any other items, as needed.
Services to start September 30, 2022
2.1 General Requirements
2.1.1 The Contractor, as an independent contractor and not an agent of the United States
Department of Agriculture, Agricultural Research Service, Western Regional Research
Center (ARS WRRC) shall, on a weekly (delivery of dry ice) or an as required basis
(delivery of cylinder and dewars), supply the material and all other things necessary for or incident to the performance of the assigned task.
2.1.2 All work performed by the contractor shall comply with all applicable Federal, state and local laws and regulations, including, but not limited to, those promulgated under the
Resource Conservation and Recovery Act, the Toxic Substances Control Act, the
Occupational Safety and Health Act, the Hazardous Materials Transportation Act, California Title 22 and applicable Department of Transportation regulations.
2.2 Specific requirements
The contractor will provide all services necessary for the ordering, delivery of, and retrieval of empty containers listed in the schedule in accordance with all local, state, and federal laws, and regulations, and the terms and conditions of this contract.
Item Size Quantity & Frequency
Dry Ice Pellets 560 lbs Weekly
Liquid Nitrogen 22PSI 160-180 L dewar As Needed, typically 18 per month
Nitrogen Gas - Industrial Grade 250 size cylinder As Needed, typically 7 per month
Nitrogen Gas - Ultra High
Purity 99.999%
300 size cylinder As Needed, typically 2 per month
Helium - Ultra High Purity
99.999%
300 size cylinder As Needed, typically 10 per month
Argon - Industrial Grade 250 size cylinder As Needed, typically 1 per month
CO2 liquid - Industrial Grade 250 size cylinder As Needed, typically 3 per month
CO2 liquid - Industrial Grade with eductor (tube)
250 size cylinder As Needed, typically 2 per month
Oxygen - Industrial Grade 250 size cylinder As Needed, typically 1 per month
Air – Ultra High Purity
99.999%
300 size cylinder As Needed, typically 0.5 per month
The above shall be used for estimating and price evaluation purposes.
• Ordering & Delivery
The contractor shall provide a POC - preferably via the internet, to allow the COR
(USDA personnel) to place as needed orders. For dry ice – a standing order will be in place for the weekly delivery of 560 lbs.
Delivery must be made within the USDA-WRRC’s operational hours M-F 8:00 to
4:30PM
• Timeliness of delivery
Ordered as needed items must be delivered within 96 hours after the order is received.
Anytime ordered cylinder gasses are unavailable or will not be able to be delivered within this time frame must be conveyed to the COR within 24 hours of the time the order was received.
Dry ice must be delivered on a weekly basis within seven days from the previous delivery.
• Invoicing & billing
The contractor must provide an invoice for each order. Invoices must be posted on the
Dept. of Treasuries Invoice Processing Platform (IPP).
• ARS Equipment and Personnel
ARS-WRRC shall not furnish any equipment to assist the contractor in the performance of the contractor's responsibilities under this contract.
• Safety
The contractor must perform all operations in a prudent, conscientious, safe and professional manner. At a minimum, contractor's personnel and equipment shall comply with applicable Federal, state, and local laws, safety regulations and procedures, and contractor will ensure that its agents, employees, and subcontractors perform in a safe manner. The contractor shall ensure that all personnel involved in handling and delivering gases and dry ice be trained for the level of expertise required for the proper performance of the task. Handling and personnel protective equipment shall be provided by the contractor and must be appropriate to ensure safe delivery and handling of the cylinder gases and dry ice.