Attachment_1_-_SOW_SLV_Parking_Lot_Resurface.docx
DOCX document 22 KB Posted
- Attached to
- SLV-CB Parking Lot Resurface
- Solicitation number
- 140R4023Q0082
About this file
This document outlines requirements for a parking lot resurfacing project for the Bureau of Reclamation's Alamosa Field Division in Colorado. The scope of work involves patching asphalt areas, filling cracks as needed, and applying pavement sealer to approximately 2,800 square yards of public parking lot. Materials and application methods are specified, and the contractor must furnish all required materials. The period of performance is from September 15, 2023 to completion by November 1, 2023. The contractor is responsible for delivery, setup, and orientation at the project site located at 10900 Highway 160 East in Alamosa, Colorado.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIVISION 1 – GENERAL REQUIREMENTS
1.1 GENERAL
1.1.1 The Requirement
It is required that there be constructed and completed, in accordance with the attached General Provisions, Special Provisions, Labor Standards Provisions, and this Request for Quotations, Parking Lot Seal Coat for the Alamosa Field Division.
1.1.2 Description of the Work
The principal components of the work to be performed under this Request for Quotations include the following:
a. Patch asphalt areas and fill cracks where needed.
b. Apply pavement sealer public parking lot - approximately 2800 square yards
1.2 MATERIALS
1.2.1 Materials to be Furnished by the Contractor
General – The Contractor shall furnish all materials required for completion of the work.
The words “material” or “materials” as used in these specifications to denote items furnished by the Contractor shall be construed to mean equipment, machinery, product, component, or any other item required to be incorporated in the work.
1.2.2 MATERIALS AND WORKMANSHIP
a. Materials – In accordance with clause entitled “Material and Workmanship,” all materials furnished by the Contractor shall be new and of the most suitable grade for the purpose intended considering strength, ductility, durability, and best engineered practice.
b. Workmanship – The Contractor shall be responsible for the accurate manufacture and fabrication of materials in accordance with the best modern practice and requirements of these specifications, notwithstanding minor errors or omissions therein.
1.2.3 The materials for pavement sealer immediately prior to mixing shall conform to the following requirements.
PAVEMENT SEALER
Pavement sealer shall be a mineral filled asphalt emulsion pavement sealer fortified with special surfactants to promote superior adhesion and durability. Select aggregate shall be job-mixed to produce a slip-resistant coating. Pavement sealer shall be a deep, rich black color and shall conform to the following requirements:
| TEST |
| SPECIFICATION |
| Material |
| Material shall be homogeneous and show no separation or coagulation that cannot be overcome by moderate stirring. |
Chemical and Physical Analysis
| - Non Volatiles % |
| 47-53% |
| - Ash Non Volatiles % |
| 30-60 |
| - Specific Gravity 25 degrees Celsius |
| 1.18 Minimum |
| Drying Time |
| 8 Hour Maximum |
| Adhesion & Resistance to Water |
| No penetration or loss of adhesion |
| Resistance to heat |
| No blistering or sagging |
| Flexibility |
| No cracking or flaking |
| Resistance to impact |
| No chipping, flaking or cracking |
1.2.5 AGGREGATE
Aggregate shall consist of approved mineral filler
1.3 LOCAL CONDITIONS
1.3.1 Electric Power for Construction Purposes
Electric power is available in the existing office building and the Contractor will be able to use the power at no additional cost. Any means of conveying power to actual areas of work, such as extension cords or adapters shall be provided by the Contractor.
1.3.2 Water for Construction Purposes
a. General – Water for construction is available at the site. The Contractor will be able to use it for construction purposes at no additional cost. Any means of conveying the water to actual areas of use, shall be provided by the contractor.
b. Water shall be potable, free of harmful soluble salts and shall be of such quality that the asphalt will not separate from the emulsion before the pavement sealer is in place in the work
1.4 SAFETY
Roads subject to interference by the work shall be kept open or suitable temporary passages through the work shall be provided and maintained by the Contractor. The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals, and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. If directed, the Contractor shall erect such additional warning and directional signs in connection with the work as may be required by the Government.
1.4.1 Submission of Material Safety Data Sheets for Hazardous Materials
The Contractor shall submit a completed Material Safety Data Sheet (MSDS) for each hazardous material used by the Contractor. The information in this MSDS shall be followed to assure safe use, handling, storage, and an environmentally acceptable disposal of the commodity used on the Bureau jobsite or by Bureau activities.
1.5 CLEANUP AND DISPOSAL OF WASTE MATERIALS
a. General – The Contractor shall be responsible for the cleanup and disposal of waste materials and rubbish. The disposal of waste materials and rubbish shall be in accordance with applicable requirements of “Reclamation’s Safety and Health Standards.”
b. Cleanup – The Contractor shall keep work and storage areas free from accumulations of waste materials and rubbish, and, prior to completion of the work, shall remove all rubbish, unused materials, and other like materials, which are not a part of the permanent work.
DIVISION 2 - PARKING AREA RESURFACING
2.1 GENERAL
Surface shall be clean and free from all loose material and dirt. Existing cracks shall be cleaned of any foreign material before applying crack fillers. Pavement surface repairs shall be made with a Colorado Department of Transportation (CDOT) approved hot mix asphalt material. Cracks shall be filled with hot pour crack fillers. Suggested products to treat all grease, oil and gasoline spots or stains are: SealMaster Petro Seal, Prep Seal, or other approved treatment products. Both surface and ambient temperature shall be a minimum of 50 degrees Fahrenheit in a 24 hour period following application.
2.2 METHODS
Pavement Sealer shall be applied by either pressurized spray application equipment or self-propelled squeegee equipment. Pressurized spray equipment shall be capable of spraying pavement sealer with sand added. Equipment shall have continuous agitation or mixing capabilities to maintain homogeneous consistency of pavement sealer mixture throughout the application process. Self-propelled squeegee equipment shall have at least two squeegee or brush devices (one behind the other) to assure adequate distribution and penetration of sealer into bituminous pavement. Hand squeegees and brushes shall be acceptable in areas were practicality prohibits the use of mechanized equipment.
2.3 MIXING
Pavement sealer shall be mixed in accordance with the following mix design (based on 100 gallons for ease of calculation):
| Pavement Sealer | 100 gals. | |
| Water | 20-25 gals. | |
| Polymer additive | 2 gals. |
Pavement sealer shall be properly mixed at a rate of .11 to .13 gallon per square yard, per coat.
The Contractor shall not discharge unused liquid asphalt into roadway ditches, borrow pits, or gutters. The Contractor shall not apply liquid asphalt when the surface to be treated is appreciably damp or when weather is unsuitable. Liquid asphalt shall be heated in a retort or by steam coil in such a manner that steam will not be introduced directly into the liquid asphalt during heating.
a. Sampling, Certification, and Testing. - All testing and sampling required shall be handled by the Contractor. This work shall meet the requirements of the latest edition of the Colorado Standard Specifications, Section 106 (Control of Material).
DIVISION 3 – PERIOD OF PERFORMANCE AND DELIVERY
3.1 Period of Performance
Period of performance for this procurement shall start work by 9/15/2023 and shall be completed with work no later than 11/1/2023. If any delays would extend this past the period of performance the Government shall be notified within 24 hours to make appropriate changes.
3.2 Delivery and Setup
It shall be the responsibity of the vendor to arrange for mobilization or shipping of any products needed to the Alamosa Field Division located at 10900 Hwy. 160 E. Alamosa, CO 81101-9518. Alamosa Field Division will accommodate the shipping company needs for loading and unloading during normal business hours of Monday thru Thursday 7:00am – 5:30pm Except for Government Holidays. (Special arrangements can be made on Friday if given 24hrs notice) Include all costs for shipping (to and from), setup, and orientation for Alamosa Field Division/Reclamation’s personnel.
Susan Storm, Facility Manager Bureau of Reclamation
| Alamosa Field Division |
| 10900 Hwy. 160 E. |
| Alamosa, CO 81101-9518 |
Vendor will provide in written instructions on proper care and service requirements for maintenance according to best industry practices.