This Statement of Work outlines requirements for mechanical site preparation services at the Lakewood/Laona Ranger District of the Chequamegon-Nicolet National Forest in Oconto County, Wisconsin. The work covers 57 acres (114 acres total work) and consists of double roller chopping and bracke scarification to prepare the site.

The contractor must provide labor, equipment and supplies including a crawler tractor with minimum 70 flywheel horsepower, while the government will furnish the roller chopper and bracke scarifier. Key performance requirements include chopping/uprooting vegetation under 12" diameter, maintaining 8-foot spacing between scarification passes, and protecting designated wildlife trees. The contract period is 180 calendar days starting approximately June 1, 2025. Additional requirements include protecting streams and archaeological resources, maintaining roads in original condition, proper debris disposal, and following specific salvage logging procedures if salvage privileges are requested. The contractor must start work within 10 days of the Notice to Proceed unless otherwise agreed with the Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

DESCRIPTION / SPECIFICATION / WORK STATEMENT

C-1 SCOPE

It is the intent of this contract to secure labor, equipment, and supplies necessary to accomplish mechanical site preparation on the Lakewood / Laona Ranger District of the Chequamegon-Nicolet National Forest.

Mechanical Site Prep will consist of double roller chopping and bracke scarification in accordance with the technical specifications outlined below.

C-2 DESCRIPTION AND LOCATION

The Mechanical Site Prep is in Oconto County, Wisconsin. It is 57 acres in total area (114 acres of total work to be completed). Refer to the attached Project Maps for a more specific location.

Working area boundaries – exterior boundaries are marked with orange paint and/or pink flagging.

C-3 CONTRACTOR – FURNISHED PROPERTY

Except for the government furnished property listed in Section G, the contractor will be required to furnish all labor, equipment, and supplies necessary to accomplish the work.

C-4 EQUIPMENT REQUIREMENTS

1. Machine Work – Roller Chopping Single Drum

A. Tractor – The tractor shall be a crawler type suitable to do the job and have sufficient power to pull a 6 ton (empty) or 13 ton (full), single drum roller chopper. It must be equipped with a canopy, fire extinguisher, blade, and spark arrestor. All equipment furnished by the contractor shall be in good operating condition and acceptable to the Contracting Officer Representative. The contractor shall assume all costs of maintenance and operation of equipment furnished by the contractor such as fuel, oil, grease, repairs and miscellaneous operating supplies.

B. Roller Chopper – The government furnished Roller Chopper shall be maintained as if it were the contractor’s own equipment. Daily maintenance such as greasing and tightening parts on the Roller Chopper shall be borne by the contractor. Major repairs on this property will be borne by the government, provided they are not the result of negligence by the contractor. During transport the roller chopper should be empty (6 ton) and during site prep full (13 ton).

C. The government will furnish to the contractor a lubrication chart at the start of operation.

2. Machine Work – Spot Scarification

A. Tractor – The tractor used shall have sufficient power (minimum of 70 fly wheel horsepower rating), equipped with a rear mounted winch to operate the bracke scarifier. It shall also be equipped with a canopy, fire extinguisher, blade, and spark arrestor. All equipment furnished by the contractor shall be in good operating condition and acceptable with the Contracting Officer Representative. The contractor shall assume all costs and maintenance and operation of equipment furnished by the contractor such as fuel, oil, grease, repairs and miscellaneous operating costs.

B. Bracke Scarifier – The government furnished bracke scarifier shall be maintained as if it were the contractor’s own equipment. Daily maintenance such as greasing and tightening parts on the scarifier shall be borne by the contractor. Major repairs on this property will be borne by the government, provided they are not the result of negligence by the contractor.

C. The government will furnish to the contractor a lubrication chart at the start of the operation.

C-5 PERFORMANCE REQUIREMENTS

1. Machine Work – Roller Chopping

All living or dead vegetation less than 12” diameter at a point 4 1/2 feet above ground are to be uprooted or knocked down, leveled and crushed, and chopped sufficiently to kill.

Certain trees that are beneficial to wildlife and visual resources, as designated on the project map, shall not be knocked down. Roller chopper will be filled with water once on site by the Forest Service. Contractor will make arrangements with the Forest Service prior to beginning work to fill roller chopper with water.

2. Machine Work – Spot Scarification

Spot Scarification shall be accomplished by using a Bracke Scarifier, furnished by the government. Strips or passes shall be 8 feet apart, except where clumps of standing or down trees or other obstructions do not allow passage of the cultivating equipment. Do not exceed a speed of 2.57 miles per hour. This will throw off the 8ft x 6ft spacing.

Cultivator scalp depth shall be a minimum necessary to remove competing vegetation and expose mineral soil.

Deviations from spacing and depth requirements may be authorized by the Contracting Officer’s Representative.

Certain trees that are beneficial to wildlife and visual resources, as designated on the project map, shall not be cut.

C.6 SPECIAL CONDITIONS

Such conditions that apply for this section are noted on each area map. All roads leading to or in each area to be worked are to be kept open and free of any debris that may occur as a result of the work. All existing roads used by the contractor will be left in the same condition, or better, as when the operations started. The contractor shall be responsible for returning roads to this condition. The contractor and Contracting Officer’s Representative will together map and describe conditions on existing roads in advance of use in order to provide a basis for maintenance needs that might result.

C.7 PROTECTION OF LAND SURVEY MONUMENTS

The contractor shall protect all known survey monuments, witness corners, reference monuments, and bearing trees against avoidable destruction, obliterating, or damage during contractor’s operations. These will be shown to the contractor on the ground by the Contracting Officer’s Representative or his inspector.

C.8 SALVAGE PRIVILEGES

To obtain salvage privileges, contractor must submit a written request to the Contracting Officer. Upon receipt of approval, the contractor may assume salvage privileges of all trees designated to be treated within the boundaries of the project work area. Trees to be treated under the terms of this contract will become the property of the contractor. All new road locations for the purpose of removing salvage shall be approved in advance by the Contracting Officer or his or her Representative. All wood to be cut and removed under these salvage privileges shall be removed prior to the contract expiration date, unless otherwise approved in writing by the Contracting Officer. Salvage logging shall be conducted according to the following requirements:

1) Felled trees shall be removed from all roads, streams, utility lines, and private property.

2) The use of tractors or wheeled skidders may be allowed after written

Authorization and approval by the Contracting Officer is granted.

3) The decking of forest products within 50 feet of the ditch bank and the skidding material along the cross-section of any graded road currently maintained by the Forest Service, or by the County, Federal or State Government will not be permitted. This is to provide for public safety and to minimize road damage.

4) Location of main skid roads and trails and skidding of tree length logs will be

Permitted only in designated skidding lanes or other locations as approved by the Contracting Officer’s Representative. This is to minimize the damage to remaining trees or regenerating stems.

5) Salvage operations will be suspended during periods of extreme cold or wet Weather as determined by the Contracting Officer’s Representative.

C.9 RESOURCE PROTECTION

1. Protection of streams, lakes, and riparian areas

The contractor shall take every precaution to prevent pollution from fuels, oils, chemicals, silt or other harmful materials of any stream, lake, or riparian area located in or near the contract areas. All streams shall be kept free of contractor-generated debris.

2. Protection of Archeological/Historical Resources

The contractor, upon discovery of suspected archaeological or historical materials, shall cease work in the vicinity of such material and immediately notify the Contracting Officer Representative.

3. Protection of Improvements

The contractor shall take every precaution to prevent damage to any improvement in contact areas such as roads, trails, ditches, fences, etc. Roads and trails shall be kept free from slash and debris. Any road or trail damaged by the contractor’s operation shall be promptly repaired by the contractor.

4. Debris Disposal

All gas and oil cans or other debris generated by the contractor during this contract shall be removed from Forest Service land as work progresses.

CONTRACT TIME

Contract time will be 180 calendar days and will begin on the effective date of the Notice to Proceed, which is estimated to be approximately June 1, 2025. Work shall begin within 10 calendar days of the effective date of the Notice to Proceed, unless otherwise agreed to by the Contracting Officer.