This Statement of Work (SOW) details the Bureau of Reclamation's requirement to replace the main vehicle access gate at the Leadville Mine Drainage Tunnel (LMDT) Water Treatment Plant in Leadville, Colorado. The project involves installing one new remotely actuated vertical pivot gate with specific technical requirements, including a dual tilt gate design extending no more than 4' above the existing fence to avoid overhead power lines. Key technical specifications include a hydraulic system that keeps the gate locked when closed, permits manual bypass, operates within -20 to 120 degrees Fahrenheit, includes radio controls with three transmitters, and integrates with existing access control systems.
The contract requires the contractor to provide all labor, equipment, and materials for gate removal and installation, including new stanchions, operator footings, keypads, and wiring. Performance requirements include a 20-second maximum open/close time, 60 open/close cycles per hour, weather-resistant housing, and compatibility with snow and ice conditions. The project has a short construction season from June through September, with all on-site work to be completed within 90 calendar days after receiving the Notice to Proceed. The contractor must also submit various documentation, including electrical and mechanical drawings, final documentation, and a final report, with most submittals required at least 28 days before mobilization.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_-_Past_Performance_Questionnaire_-_140R6025R0011_-_LMDT_Main_Vehicle_Gate_Replacement_0001.pdf | ||
| Sol_140R6025R0011_Amd_0001.pdf | ||
| Attachment_3_-_LMDT_Gates_-_Dept_of_Labor_Wage_Determinations.pdf | ||
| LMDT_Main_Vehicle_Access_Gate_Replacement_Solicitation_-_140R6025R0011.pdf | ||
| Attachment_2_-_Example_-_VPG-R-L-Layout.pdf | ||
| Sol_140R6025R0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Bureau of Reclamation
Leadville Mine Drainage Tunnel (LMDT), Leadville, CO LMDT Access Main Vehicle Access Gate Operator Replacement
1.0 BACKGROUND
The Bureau of Reclamation’s anticipates replacement of the main vehicle access gate at Leadville Mine Drainage Tunnel (LMDT) Water Treatment Plant located in Leadville, Colorado in Lake County. Leadville is situated at 10,200’ asl in the central Colorado mountains, subject to a short construction season of June through September of each year. The existing gate has been determined to be unsafe due to its proximity to overhead power lines.
The existing gate is a Tiltaway Model # KJB 25 hydraulic vertical pivot gate. Access control inputs are one push-button keypad and gate card reader located on the unsecured side of the gate permitting vehicle drivers to enter a security access code and open the gate, and one remote operation push-button within the facility. Access controls are hardwired. Closing the circuit initiates the gate opening cycle.
2.0 SCOPE
The scope of this purchase order includes all necessary labor, equipment, and materials to install one (1) new remotely actuated vertical pivot gate operators and associated vehicle sensors to the front entrance of the facility driveway in the same location as existing entrance gate. This gate will need to be a dual tilt gate with each side extending no more than 4’ above the existing fence to prevent any issues with the overhead powerlines in front of the facility. Quotes shall include removal of existing gate, and installation of the new gate, stanchions, and operator footings, and keypads. Running the wiring and communications cables to the facility.
3.0 OBJECTIVES
The objective of this effort is to provide safe and reliable access to the LMDT main entrance including deliveries, while maintaining these facilities secure from unauthorized entry as well as maintaining a safe distance from the existing overhead power lines.
4.0 WORK REQUIREMENTS
The Contractor shall furnish and install one (1) new gate operators along with appurtenant equipment including new vehicle sensors and access controls. The components or systems replaced must meet the following salient characteristics:
4.1 Operators
(1) The hydraulic system shall be designed to:
a. Keep the gate locked in the closed position,
b. Keep any person from lifting the gate open when it is in the closed position and,
c. Permit personnel with the appropriate means of access to bypass the hydraulic system and raise the gate manually.
Attachment 1140R6025R0011 Missouri Basin Region Bureau of Reclamation
(2) The Government provides 240VAC/1PH/30A service to the LMDT Main Gate and 240VAC/1PH/20A service to the same gate.
(3) Maximum gate opening time: 20 seconds. Maximum gate closing time: 20 seconds.
(4) Duty cycle: demonstrate 60 open/close cycles per hour.
(5) Operational capabilities between temperatures of negative 20 and positive 120 degrees
Fahrenheit.
(6) Weather-resistant housing for mechanical equipment.
(7) NEMA 4 or NEMA 6 type enclosure for electrical equipment.
(8) Housing access must have flat ground for a distance of at least 3 feet around it.
(9) Gates must be able to operate with 1/4-inch ice accumulation.
(10) Manual operation capabilities requiring less than 20 pounds force to raise and lower.
(11) Provide pressure relief system to avoid crushing object below the gate.
(12) Shut-off power device in case of balance system failure.
(13) A reversing edge safety function to automatically open the gate if the gate touches an object while closing.
(14) A cold weather package to include heating devices on the hydraulic cylinders to ensure operation in weather up to -25 degrees Fahrenheit.
(15) Ice scrapers for cable sheaves
(16) Integrate with existing access control systems inputs adding new control systems in Administrative Assistants Office.
(17) Provide radio controls with open-close-stop transmitters/receivers systems. Provide three transmitters.
(18) Include one enclosure mounted key switch. Key switch shall accept Government security tumblers.
(19) Run Conduit and wires for gate power and operation for both gates 26’ Double equivalent to HYJG Amplimesh Gate with Barb Wire that is more than 12’ clearance from overhead power lines when fully open.
4.2 Vehicle sensors
(1) No roadway imbedded channels or tracks to inhibit snow plowing and road surfacing.
(2) Vehicle sensors must be functional with up to 4 inches of packed snow and/or ice on the roadway and 36 inches of plowed snow and/or ice on the side of the roadway.
4.3 Gates and Stanchions
(1) Tilt-A-Way (or approved equivalent) vertical pivot gates.
(2) Minimum 26’ between the open area of the driveway with both gates open.
(3) The gate shall be 9’ feet tall including three strands of barbed wire.
(4) Maximum clearance under the gate shall be 4 inches.
(5) Aluminum frame construction.
(6) Barrier to be aluminum alloy screen fabric.
(7) Dual Vertical pivot design.
(8) Gates must be operable with 1/4-inch ice accumulation.
(9) Corrosion resistant connections for dissimilar metals.
(10) Stainless steel hinges and pivots.
(11) Minimum wind load rating of 100 miles per hour.
Installer Qualifications: Offeror has a minimum five years successful experience completing vertical pivot gate installation similar to that required.
Field Measurements: Verify dimensions and component layout by field measurements prior to beginning installation. Site visits shall be coordinated with the Contracting Officers Representative
(COR).
Installation: I nstallation shall comply with manufacturer’s recommendations and installation instructions.
Spare Parts: The contractor shall submit a list of recommended spare parts and supply one complete set of spare parts.
5.0 SECURITY
The Contractor shall coordinate with the COR for any periods of time in which the gates must be disabled or remain in the open position. The Contractor should make all efforts to arrange work such that the gate is not required under any circumstances to be left open overnight.
6.0 PLACE OF PERFORMANCE
All work shall take place at LMDT in Leadville, Colorado.
7.0 PERIOD OF PERFORMANCE
All on-site work shall be completed within 90 calendar days after receive the Notice to Proceed (NTP). The contractor shall coordinate with the COR, a minimum of 5 working days, prior to initiating on site work requirements.
8.0 WARRANTY
Provide a one-year or manufacturer’s standard warranty, whichever is longer, for system and system components against failure resulting from normal use based on manufacturer’s literature.
Failure shall be defined as any defect in manufacturing, which prevents gate from operating as intended.
9.0 SUBMITTALS
The Contractor shall furnish submittals in accordance with the following table:
RSN
Clause or
Section Title
Submittals required
Due date or delivery time R es po ns ib le co de
No. of sets to be sent to:
CO COR
1 Bonds
52.228-15
Performance and Payment Bonds
Within 10 calendar days after award
CO 1 electronic 0 or delivery time R es po ns
No. of sets to be sent to:
CO COR
2 Additional Bond Security 52.228-2
Additional Bond Security
Within 10 calendar days after award
CO 1 0
3 Insurance-work on a Government Installation 1452.228-70
1) Written certification that the required insurance has been obtained
2) Current certification of insurance for each subcontractor
1) Before issue of notice to proceed
2) Prior to Contractors commencing onsite work
CO 1 electronic 0
4 Liability Insurance
1452.228-70
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
CO 1 electronic 0
5 Equal Opportunity
52.222-26
Information required by Executive Order
112246 (SF-100)
Within 28 calendar days after award
CO 1 electronic 0
6 Reporting Executive Compensation and First Tier Subcontract Awards
52.204-10
Certification that executive compensation and subcontract awards were reported
Within 28 days of each report being submitted
CO 1 electronic 0
7 Schedule of Values
GP-1
Required for lump-sum items in the Bid Schedule
Submitted and approved before any payment other than bonds and insurance
CO 1 electronic 0
8 Invoice DOI
– AAAP
Electronic Invoicing and Payment Requirement s (IPP)
DRAFT Invoice before entering into
IPP
10 Days Prior to Payment Request
CO 1 electronic
*** Must include as builts of all mechanical, electrical, and electronic equipment installed
*** Include owner’s operation and maintenance manual or delivery time
R es po ns
No. of sets to be sent to:
CO COR
9 Release of Claims
1452.204-70
Release of Claims (DI-
137) against the Government
After completion of the work and prior to final payment
CO 1 electronic 0
10 Site Security
GP-7
List of all contractor and subcontractor employees
At least 28 days before mobilization
COR 0 1 paper or
1 encrypted electronic
11 Labor Standards Data
52.222-11
1) List of subcontractors
2) Statement and Acknowledgement Form (SF-1413) for each subcontract
At least 28 days before mobilization
COR 1 electronic 1 paper or
1 encrypted electronic
12 Payrolls
52.222-08
Copies of all payrolls Weekly for each week of contract performance
CO 1 electronic encrypted
1 paper or
1 encrypted electronic
13 4.0 Work Requirements
Electrical Drawings:
Electrical design drawings including but not limited to: electrical schematics, panel arrangements, wiring diagrams, and bill of materials.
Approved at least 28 days before mobilization
COR 0 1 electronic
14 Spare Parts Complete set of Spare Parts
7 Days Prior to completion of work
COR
1 set or delivery time
R es po ns
No. of sets to be sent to:
CO COR
15 4.0 Work Requirements
Mechanical Drawings:
Mechanical design drawings including but not limited to: hydraulic schematics or P&IDs, mechanical design, and bill of materials. One drawing shall include nominal design and final set points for all adjustable mechanical components.
Approved at least 28 days before mobilization
COR 0 1 electronic
16 4.0 Work Requirements
Civil Drawings: Gate layout drawings including but not limited to: secured and unsecured side elevation, plan view showing existing fencing and paving, and footing details
1 electronic
17 4.0 Work Requirements
Final Documentation: All available manufacturer documentation for gates, parts, and materials installed under this contract, including Operation and Maintenance (O&M) manuals. At a minimum, this shall include final wiring diagrams, maintenance data, and final shop drawings.
Within 30 days of on-site work completion.
COR 0 1 electronic
18 4.0 Work Requirements
Final Report:
Final report detailing additional issues found during work and recommendations for future work.
Within 30 days of on-site work completion.
COR 0 1 electronic
** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.
ATTACHMENT 1 – PHOTOS
Leadville Main Gate Location
| 1.0 BACKGROUND |
| 2.0 SCOPE |
| 3.0 OBJECTIVES |
| 4.0 WORK REQUIREMENTS |
| 5.0 SECURITY |
| 6.0 PLACE OF PERFORMANCE |
| 7.0 PERIOD OF PERFORMANCE |
| 8.0 WARRANTY |
| 9.0 SUBMITTALS |
| ATTACHMENT 1 – PHOTOS |
File details come from the government source that posted it. Updated .