STATEMENT OF WORK,

FOR

PURCHASE OF LED RETROFIT LAMPS FOR HIGH MAST AIRFIELD LIGHTING

JOINT BASE MDL, FT DIX, NEW JERSEY

CE TASK ID 10327019

17 Aug 21

DESCRIPTION OF SERVICES. The contractor shall provide 270 each LED Retrofit Lamps for High Mast Airfield Lighting.

PROJECT REQUIREMENTS: LED270BT56/750 or equivalent

LAMP REQUIREMENTS

1. General

1.1 UL Type: Type B

1.2 Bulb Shape: BT56

1.3 Bulb Base Type: EX39

1.4 Voltage: 277-480 V

1.5 Wattage: 270 W

1.6 Wattage Replacement: 1000 W

1.7 Operating Life: 50,000 Hours

1.8 Dimmable: No

1.9 Operating Temperature: -20 – 50 ℃

2. Photometric

1.1 Efficacy: 148 LPW

1.2 Lumens: 40,000 lm

1.3 CCT: 5000 K

1.4 CRI: 70

3. Dimensions

3.1 MOL: 12.2 in

3.2 Diameter: 5.591 in

4. Ratings & Certifications

4.1 Safety Certifications: cULus

4.2 Location Ratings: Damp

ADDITIONAL CONTRACTOR RESPONSIBILITIES: Any adjacent areas disassembled, damaged or removed by the contractor during execution shall be properly repaired by the contractor at no expense to the Government. Any and all debris / trash generated by this project shall be removed and properly disposed of off base in accordance with all federal, state and local directives and regulations. The contractor shall not utilize any government owned/furnished waste disposal facilities or receptacles. The contractor or his representative shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.

SPECIAL REQUIREMENTS. The work site shall remain clean and clutter free. All dumpsters or other containers for trash and debris shall be located in areas designated by the COR and shall be subject to removal and / or relocation at the any time. These requirements shall not impact the performance period.

POINTS OF CONTACT:

Mr. Gene Killian609 -754-5122Building 3104McGuire Air Force Base
Mr. Brad Warren609-754-5475Building 3104McGuire Air Force Base

The Contractor Manager or an alternate shall be available within sixty (60) minutes notice during normal duty hours, 7:30am to 4:15pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Evaluator / Pont of Contact with phone number for contacting purposes.

BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into McGuire Air Force Base and Fort Dix for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located inside the twenty-four (24) hour gate right off of Wrightstown / Cookstown Rd.

SECURITY FORCE AND FIRE PROTECTION: The Base Security Police telephone number is 609-754-2001 and the Base Fire Department telephone number is 911 for reporting a fire. General information telephone number is 609-754-3326.

PERFORMANCE PERIOD: All work shall be completed 30 calendar days from award.

INSPECTION / ACCEPTANCE OF PROJECT COMPLETION: A final inspection will be scheduled upon completion of all work. Contact the Government Quality Assurance Evaluator / Point of Contact 24 hours prior to completion for a site visit.

END OF THE STATEMENT OF WORK