Attachment 1 - SOW GAOA Toilet Replacements Trujillo Meadows.docx
DOCX document 3 MB Posted
- Solicitation number
- 1240LP26Q0199
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the procurement of three commercial vaulted toilet structures for the Rio Grande National Forest's Conejos Peak Ranger District, specifically for installation at Trujillo Meadows Campground. The objective is a one-time purchase of standard double vault toilets that meet Forest Service specifications and comply with Americans with Disabilities Act (ADA) accessibility requirements. The Forest Service will handle site excavation and finalization, with the contractor responsible only for delivery and placement of the units at designated locations within the campground.
The required deliverables specify three accessible concrete double vault toilets with the following specifications: double vault construction, brown color, shake shingle roof, board and batten or barnwood lap walls with rock bottom, ADA-compliant construction, white plastic toilet riser, 6-roll toilet paper dispenser, solar vent fan, and chain door strap; no urinals are required. The delivery location is Trujillo Meadows Campground, accessible via US Highway 285 South and Forest Service Road 118 near the Conejos Peak Ranger District in Colorado. This is a Total Small Business Set-Aside procurement under NAICS code 332311 with a 750-employee size standard, issued as Request for Quotation 1240LP26Q0199. The contractor bears no responsibility for site preparation, excavation, grading, or finishing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04 1240LP26Q0199 1449 Revised 09-28-2026 with Clauses and Provisions.pdf | ||
| Attachment 2 - FS-Schedule of Items Template GAOA Trujillo Meadows.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables | 3 |
Project GAOA Old Toilet Building Replacements – Trujillo Meadows Campground Purchase and Delivery
General Information
1.0 Scope of Work
The objective of this request is to purchase three commercial vaulted toilets for the Rio Grande National Forest’s Conejos Peak Ranger District. It is a one-time purchase of a standard vaulted toilet of the style routinely used by the Forest Service. The purchase must be designed for these structures to meet ADA compliance and accessibility requirements.
2.0 Background
Vaulted toilets are a common purchase by ranger stations in remote areas, because they provide restroom facilities for both civilians and FS personnel. They are economical, easy to maintain, and leave a small environmental footprint. Additionally, they are readily available for purchase and delivery. A well-maintained vaulted toilet can last for decades, so a one-time purchase is often a long-term investment for the ranger district it serves.
A vaulted toilet of the size and type routinely utilized by the FS includes a white plastic toilet riser, 6-roll toilet paper dispenser, and ADA compliant construction. The exact dimensions vary by manufacturer but must be of a double vault construction.
Contractor Requirements
3.0 Technical Requirements / Tasks
Since the vaulted toilet is placed in a remote outdoor setting, the exact dimensions are less important than the features. Therefore, the following features are requested:
· Double vault toilet
· Brown in color
· Shake shingle roof
· Board & batten, barnwood, or lap walls with rock bottom
· ADA-Compliant construction
· Plastic toilet riser
· No urinal
· 6-roll toilet paper dispenser
· Solar vent fan
· Chain door strap
4.0 Government Furnished
The U.S. Forest Service will excavate and finalize the sites, so the Contractor will only be required to deliver and place the double vault toilets at the designated areas. The Contractor is not responsible for site preparation, excavation, grading, or finishing.
5.0 Deliverables
Purchase and delivery of three accessible concrete double vault toilets to:
Trujillo Meadows Campground From the Conejos Peak Ranger District take US Hwy 285 S. Follow US Hwy 285 S and CO-17 S to Forest Service Rd 250 for about 12 miles. Continue straight onto CO-17 S for about 35 miles. Turn right onto Forest Service Rd 118 for about 2 miles and campground entrance will be on the left.
Three toilet locations will be within Trujillo Meadows Campground near current toilet locations currently marked below. Will coordinate with contractor with exact locations when delivered.
*USFS will be doing the excavation and finalizing the site. Contractor will deliver and place Vault Toilets on site, no site preparation, excavation, grading, or finish work is required from the contractor.