This document is a Statement of Work (SOW) for the design, construction, and installation of a prefabricated police facility at the U.S. Embassy in New Delhi, India. The scope includes a turnkey prefabricated structure with a site-built perimeter fence to accommodate local police and security personnel. Key requirements include:

The facility must be a rapidly assembled, UV-resistant, and abuse-resistant prefabricated system with insulated walls, roof, and flooring. It shall include barracks, security officer quarters, a tea lounge, toilet facilities, and a weapon storage closet, arranged in a total program area of approximately 187 square meters. The successful bidder must provide all shop drawings, finishes, and engineering specifications for approval by the U.S. Government. They are also responsible for obtaining all necessary permits and approvals from Indian authorities.

The contract opportunity has a solicitation number of 191N6524Q0097 and a due date of July 22, 2024 for quotations to be submitted electronically to newdelhibids@state.gov. A site visit is scheduled for July 1, 2024, and questions must be submitted by July 3, 2024. The estimated project duration is 350 calendar days from contract award.

View the file

Other files

File Type Posted
SOLICITATION-PORTA CABIN-SAP.pdf PDF
DRAWINGS-FOR PORTACABIN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT – 1 - SOW

POLICE FACILITY AT U.S EMBASSY, NEW DELHI

1. DESIGN APPROACH

The intent of this proposal is to provide a facility to accommodate New Delhi police officers and other members of local security staff for the Embassy of The United States of America, New Delhi. After completion of construction, the facility will be turned over to the Government of India, referred hereafter as “the owner”. The proposed facility consists of two major components:

1. A pre-fabricated turn-key structure

2. A site-built fence that screens the facility

The basis of design for the work is a portable cabin based on prefabricated panels and pre-engineered streel structures, intended for easy erection and disassembly (e.g. Porta Cabin or equal system). The system shall be placed on raised platforms to mitigate flooding issues during the raining seasons as described in this document and drawings. The method of construction allows the facility not to be subject to ground coverage limitations and floor-area-ratios (FAR). These aspects allow for approvals by the relevant authorities to be achieved with less difficulty.

2. SITE CONDITIONS

The intended site contains a number of site constraints that must be managed. There are several city-marked trees on the intended site. The site is within the jurisdiction of the New Delhi Municipal

Council (NDMC), which prohibits the felling of any trees in the area of work. The site plan in the bid proposal documents consider this factor. No trees should be required to be removed to accommodate the facility.

3. PERMITING AND APPROVALS

The proposed police facility is located on a parcel of land belonging to the NDMC. A local advisor for permitting and approvals indicates that there are number of precedents for Porta Cabin construction in the vicinity. The successful bidder will be required to coordinate the approvals and obtain permits on behalf of the New Delhi Police from the Ministry of External Affairs (MEA) and all other authorities needed to complete the work.

4. COST PROPOSAL

4.1 PROGRAM

The proposal includes the following program, provided by the U.S. Embassy, as described in the documents issued for bid proposal:

a. Local Police Barracks (54 sqm)

b. Personal Security Officer Barracks (41 sqm)

c. Tea Lounge Area (21 sqm)

d. Toilet Room with showers (21 sqm)

e. Toilet Room with showers (8 sqm)

f. Weapon Storage Closet (3 sqm)

g. Janitor Closet ( 1 sqm)

h. Exterior Courtyard and Stair (38 sqm)

i. Perimeter fencing as described in the bid proposal documents

4.2 SHOP DRAWINGS

This request of proposal (RFP) is for guidance and information purposes only. All shop drawings and construction documents shall be provided by the successful bidder for the approval by the U.S.

Government. All finishes, specifications or structural, mechanical, plumbing, electrical and associated systems shall be specified in the documents delivered by the successful bidder for the U.S. government’s approval.

4.3 REQUIRED KEY COMPONENTS

4.3.1 INTERIOR AND EXTERIOR WALLS

The successful bidder’s proposal shall include a system that can be rapidly assembled, resists ultraviolet (UV) radiation, and that is resistant to rot. The system shall be abuse resistant and resistant to abrasion. The system shall provide insulated enclosure while allowing for expansion in floor area. All material used shall meet Indian Standards Institute (ISI) standards as applicable. All dimensions shown on the bid proposal documents are outer, with a tolerance level of +/- 5 percent.

Exterior panels shall be fabricated with two outer layers of galvanized metal with a thickness of 0.62 mm and an inner layer of EPS polystyrene (20 Kg/m3 density) with a thickness not less than 75mm.

The panels shall have a load bearing strength not less than 550-600 Kg/m2 using laminating resin.

Exterior panels shall have inter-locking (male to female) systems that ensure complete walls. The panels shall be shop-cut, shop-painted, pre-finished galvanized sheets.

Maximum length of wall panels shall not exceed 4,266 mm (14 ft). The maximum width shall not exceed 790 mm (31”). The thickness shall not exceed 78mm (3”).

4.3.2 WALL PANEL CONSTRUCTION

Interior and exterior walls shall be constructed of the following sandwiched components:

a. 24-gauge galvanized metal sheeting with shop painted polyresin coating with sand finish

b. Resin bonding layer

c. Medium density expanded polystyrene (thermocole), 20Kg/m3

d. Resin bonding layer

e. 24-gauge galvanized metal sheeting with shop painted polyresin coating with sand finish

4.3.2.1 PANEL TECHNICAL SPECIFICATIONS

a. Panel weight : 15.25 kg/m2

b. Panel density : 196 kg/m3

c. Thermal conductivity : 0.028 kcal./sec./sq.m/c/m

d. Durability: Not less than 50 years

e. Load bearing capacity: 550-600 kg/m2

f. Panel connections at joints : Interlocking, male-female

g. Moisture content: NIL

h. Impact resistance: 0.15-0.2 kn/m2

i. Water sealant : Self sealing & added additional sealants at roof.

j. Anti Termite: Waterproof, termite proof, insect proof, calamity proof.

k. Refer to drawing sheet G001 for additional specifications.

4.3.3 STRUCTURAL REQUIREMENTS S AND SITE-ERECTION

The building structure shall consist of a series of interlocking thermally insulated panels that complete the interior and exterior walls as well as the roof enclosure. The successful bidder shall provide a complete system that includes flooring system fastened to steel posts anchored at each corner with anchor plates attached to a continuous ring beam. The foundation and super structure as well as additional center supports and corner reinforcement as required shall be engineered by the manufacturer.

4.3.4 ROOFING

The roofing panels shall be fully insulated and have a thickness of 75mm (3”) with finish layers of galvanized metal (0.63mm). The roof shall provide a water-tight enclosure over both conditioned and non-conditioned space, which includes the covered porches and main entry.

4.3.5 THERMAL INSULATION

See Section 4.4.2 and Section 4.3.4 for insulation requirements.

4.3.6 FLOORING

Flooring shall be constructed using manufacturer’s standard, which consists of boiling-water-proof (BWP) marine grade plywood panels with a 15mm thickness, placed on a grid platform of galvanized mild steel (MS) hollow metal tube sections of 50x25 mm. The standard grid size for the metal frame shall be 600mm x 600mm. The floor level shall be raised above the ground using ISMB or

ISMC galvanized steel supports with size, spacing, and footings engineered by the prefab designer per the manufacture’s standards.

The successful bidder shall provide rodent repellent and galvanized metal mesh screen from the bottom edge of the enclosure to a minimum of 300m below grade.

4.3.7 PAINTING

Exterior shall receive a texture coating of BSC/Radisson/Hitech (or equal).

Interior shall receive oil-bound-distemper (OBD) paint of Nerolac/Berger (or equal).

Exterior color shall be charcoal gray or as approved by the U.S. Government.

4.3.7 OPENINGS

Aluminum awning windows shall be durable in anodized powder coated aluminum. Flush doors shall be in durable aluminum, waterproof flush door with stainless steel hardware + mortise lock for locking arrangements as approved by the U.S. Government. Provide windows and doors in finish color to match the walls as approved by the U.S. Government. Install Wire Mesh and Grill on windows.

4.3.8 ELECTRICAL

Successful bidder shall provide all material, installation, and relevant specification information to provide a complete electrical system, including any wiring or associated devices and fixtures not otherwise shown or provided by the manufacturer.

a. Concealed electrical points shall be Anchor Roma or Havells (or equal) and shall be encased in PVC conduit as required by the local code per the electrical drawings.

b. All wiring shall be concealed in PVC, reinforced steel flexible tubing with suitable electrical fittings of standard make and model. Switches and sockets for electrical fixtures such as lights, fans, and other electrical devices (to include computers) shall be provided as per applicable codes and as described on the drawings. Alternating Current (AC) provision shall be provided by the successful bidder.

c. The successful bidder shall coordinate with local utilities and local police department, and any other relevant authority to establish new electrical service to the facility. Refer to civil and site plan drawings for additional information.

4.3.8 PLUMBING

Successful bidder shall provide all material, installation and relevant specifications to provide a complete plumbing system as required, including any fixtures or associated devices and not otherwise shown or provided by the manufacturer.

4.3.9 MECHANICAL

Successful bidder shall provide all material, installation, and relevant specification information to provide a complete air conditioning system, including any wiring or associated devices and fixtures not otherwise shown or provided by the manufacturer. The system shall be a split-system with condenser unit to serve the all interior spaces in the program.

5. SITE FENCING

The successful bidder shall provide a screen fence consisting of green flex sheet panels with a metal frame backup support system. The system shall be mounted on top of a concrete knee wall, as shown in the drawings. The successful bidder shall also provide four flat GFRC panels to be installed at locations shown on the drawings, to be mounted on top of the concrete knee wall. Screen fence and GFRC panels including all related steel back-up support shall be engineered and installed by the

Successful bidder. Steel shall be galvanized and painted to resist corrosion in suitable steel material as engineered by fabricator’s structural engineer. Finish color as indicated on drawings and as approved by the U.S. Government. Successful bidder to provide concrete properties and performance criteria for site knee walls.

6. OTHER SPECIFICATIONS

Refer to drawing sheet G001 for additional project specifications.

7. DURATION

Estimated duration to complete the project including required permitting is estimated at no longer than 350 calendar days.