Attachment 1 - SOW.pdf

PDF 160 KB Posted

Attached to
BLDG 576 Carpet Federal contract opportunity
Solicitation number
FA442721Q0024
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 576 Carpet, newest first.
File Type Posted
BLDG 576 Carpet Combo.pdf PDF
Contract Security Clause.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

BLDG 576 CARPET PROJECT

1. SCOPE: Supply all material, equipment, and labor necessary to perform all operations in strict accordance with these specifications in this SOW. The contractor is responsible for all required measurements and drawings.

1.1 Hours of normal operations shall be from 0700 to 1630, Monday – Friday, to exclude all federal holidays. All other dates and/or times must be approved by the government. Clean up shall be done daily within these hours, e.g. pick up scraps, vacuum as needed, store and/or stack uninstalled carpet etc.

2. LOCATION: All work on this project is to be performed at Travis Air Force Base, CA.

3. DESCRIPTION OF WORK: The following outline of the principle features of work does not in any way limit the responsibility of the contractor to perform all work and furnish all materials to do a complete job within the intent and scope of the specifications, sketches, drawings and contract. Use of Unified Facilities Guide Specifications (UFGS) 09 68 00: Air Force Carpet Standard will be used as reference when needed.

General construction consists of the following items:

3.1.1. Bldg.576, Carpet- Contractor shall be responsible for demolition of existing flooring i.e.

carpet/tile, cove base and install new carpet and cove base, adhesive and floor leveling compound as required.

The contractor shall install approximately 189 SY of carpet tiles with nylon fiber. The carpet will need superior soil resistance and appearance retention as well as the ultimate in styling flexibility. It will have manufacturer continuous filament nylon 6. 6 or nylon 6 with a cross-section modification ratio no greater than 2.5 per UFGS 09 68 00, colors to be selected upon award. There will be no PVC backing. The contractor will order for an additional 10% in replacement tiles to allow cutting and matching of carpet pattern repeats as needed as specified in UFGS 09 68 00. The contractor shall furnish and install approximately 650 LF of 4” rubber cove base, colors to be selected upon award. The contractor shall furnish and install approximately 30 LF of transition strips, colors to be selected upon award. All work shall be coordinated through Maintenance Engineering, Mr. Warren Cabanlit (707-424-2706) or Mr. Dukes (707-424-8407). Any carpet removed shall be recycled and a “received” certificate submitted to 60 CES/CEOSS COR Office showing that removed products were not placed in landfills.

Carpet Selections Include:

Vendors Carpet Name Carpet Color / Design

CMA Milliken Ghost Artist FAC25-118 Spectral Will specify after award JJ Flooring Inception-Perfect Concept Will specify after award Shaw Inc Shaw: Construct EcoLogix-Integer Will specify after award Mohawk Mohawk: Sabbatical-GPA-977 Will specify after award

3.1.2. All adhesives for carpet installation shall be environmentally safe products meeting all requirements of the Bay Area Air Quality Management District and all other local, state, and federal environmental agencies. Flooring adhesives should be certified as Carpet and Rug Institute (CRI) “Green Label” or “Green Label Plus” per UFGS 09 68 00. All Material Safety Data Sheets (MSDS) need to be submitted to environmental for approval before installation. Contact Arvey Andrews of CE Environmental office at (707) 424-7514 for submittal. The adhesive is to be of the type so that one carpet tile can be easily removed and replaced with another ”like” tile in the same area. Contractor shall assure there is enough adhesive to perform the work within the given project time frame.

3.1.3. The contractor shall install flooring i.e. carpet, tile, rubber, cove base, adhesive and floor leveling compound as required in accordance with estimate and drawings. If color and style are not on quote they will be determined once awarded. The contractor shall be responsible for field verifying existing site conditions and measurements prior to bidding. The contractor shall provide all materials and labor to complete the job as intended.

3.2 Execution:

3.2.1. Surface Conditions: Flooring shall not be installed on surfaces that are unsuitable and will prevent proper installation. Surface will be clear of old adhesive/glue for proper carpet, tile, and rubber adhesion according to manufacture. Contractor shall provide all materials necessary to properly install flooring as recommended by the flooring or adhesive manufacturer. Floor shall be free of any foreign materials and swept clean. Some locations may require two or more phases to complete all of the removal/installation.

3.2.2. Installation: Contractor Qualifications: All work shall be performed by either manufacturer or CFI Certified Floorcovering Installers (International Certified Floorcovering Installers Association). Foremen on the jobsite must be “Certified C-II Minimum” as per UFGS 09 68 00.

3.2.2.1. Carpet tiles: Carpet shall be installed according to manufacturer’s instructions. Carpet shall be installed direct glue down and shall be smooth, uniform, and secure, with a minimum of seams. Side seams shall be run where such layout does not increase the number of seams. Breadths shall be installed parallel, with carpet pile in the same direction. Patterns shall be accurately matched. Cut outs, as at doorjambs, columns, and ducts shall be neatly cut and fitted securely. Seams at doorways shall be located parallel to and centered directly under doors. Seams shall not be made perpendicular to doors or at pivot points. Seams at changes in directions of corridors shall follow the wall line parallel to the carpet direction.

3.3.2.7. Cove Base: Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk.

Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.

3.3.3. Cleaning and Protection:

3.3.3.1. Cleaning: After installation of the flooring; debris, scraps, and other foreign matter shall be removed and disposed of by the contractor. Soiled spots and adhesive shall be removed from the face of the carpet with appropriate spot remover. Protruding face yarn shall be cut off and removed. Carpet shall be vacuumed clean with contractors own vacuum.

3.3.3.2. Protection: The installed carpet shall be protected from soiling and damage before and during installation.

4. UTILITIES: Reasonable quantities of water and electricity will be provided to the contractor without charge.

Needed temporary connections shall be installed, maintained, and removed at the contractor’s expense and the area put back in the same condition or better at the end of the project.

5. MATERIAL STORAGE AND CLEANUP: The contractor’s materials and equipment shall be neatly stored and protected at the end of each day. Storage facilities are to be provided by the contractor. Clean up and removal of all debris, spoil, and waste shall be accomplished at the end of each work day. When feasible all carpet and carpet installation waste should require a certification that the products were not deposited in a landfill. A copy of the certification should be provided to the Quality Assurance Representative, Mr. Warren Cabanlit. Carpet containing hazardous substances must be disposed of in accordance with hazardous waste regulations. Disposal of old materials and scraps shall be taken off-base during and/or at the end of the project at the contractor’s expense.

Upon completion, the premises shall be left in a neat, clean, unobstructed condition, in perfect order and repair.

Contractor storage area and trailer parking shall be coordinated with Maintenance Engineering.

6. WORKING CONDITIONS: The facility and adjacent area(s) will likely be occupied and utilized during the project phase(s). The contractor shall perform work in such a manner as to cause the minimum of interference to the facility and the surrounding area. The contractor shall be responsible for correcting any damage caused by or incidental to, this project. The occupants will remove computers, books and any small items out of the areas to be carpeted. The contractor shall notify Maintenance Engineering a minimum of five working days to move any equipment and to start the work project. If lifting system or moving of furniture is required for this project, where building occupants are actually working, the contractor shall work areas or an area that can be completed that day so there is minimal downtime for building occupants.

7. SHIPMENT OF MATERIALS: All materials are to be shipped and stored by the contractor until installation date and any related cost are to be included in the bid. Delivery and unloading of materials to be used is the contractor’s responsibility. All materials shall arrive in original unopened packaging with identification labels intact.

8. FLOORING TYPE SPECIFICATIONS:

8.1. Below are the carpet tile specifications, the color to be selected upon award. Contractor is to submit their specifications with their bid according to the standards below:

Product type Carpet tile Size 18” x 18” to 36” x 36” Construction Tufting Surface Texture Graphic loop Dye method Solution dyed Fiber product 100% Nylon Protective treatments The finishes shall include soil resisters, stain resisters, and antimicrobial treatments. These protections should be built in so that the finish is permanent and never requires reapplication due to moisture, shampooing, or steam cleaning. Antimicrobial treatments should be registered with the United States Environmental Protection Agency (EPA) for the express purpose of providing protection.

Secondary backing Cushion backing made of polyurethane APYD must exceed 4000 ozs. /yd3 Electrostatic propensity less than 3.5 KV, permanent conductive filament Minimum Warranties Fifteen year warranty against 10% loss of face fiber.

Fifteen year warranty against edge raveling, snags, picks, runs, and delamination

Pile Height: No higher than 12.7 millimeters [0.5 inch], measured to the backing). Reference ADAAG, Section 4.5.3, Carpet, for detailed requirements (Americans with Disabilities Act Accessibility Guidelines)

The material specifications shall meet the remaining standards enumerated in UFGS 09 68 00.

8.2. Below is the cove base material specifications. Contractor is to submit their specifications with their bid according to the standards below:

Product type Conform to ASTM F1861, Type TS (vulcanized thermoset rubber), Type TP (thermoplastic rubber), or Type TV (thermoplastic vinyl), Style A (straight - installed with carpet), and Style B (coved - installed with resilient flooring), and Style C (butt toe cove installed with 3 mm 1/8 inch thick flooring).

Construction Provide 100-150 mm, 4 inch high and a minimum 3.175 mm 1/8 inch thick wall base. Provide preformed or job formed corners in matching height, shape, and color, minimum 4” integral cove base. Prepare and clean substrate according to the manufacturers written instructions.

The material specifications shall meet the remaining standards enumerated in UFGS 09 68 00.

9. PERIOD OF PERFORMANCE: All work orders will be completed in sixty (60) days after delivery of contract (ADC).