This Statement of Work (SOW) details the Air Force Institute of Technology's (AFIT) requirement for a Prototrak 1845RX 2-axis CNC lathe with specific technical specifications. The machine must be a Prototrak brand lathe with an RLX controller, compatible with existing equipment in their Model Shop, and include features such as an 18-inch swing over bed, 10 HP spindle motor, programmable coolant system, steady and follow rests, collet closers, LED lighting, and comprehensive software options including TRAKing, CAM File Out Converter, and DXF Converter.
The SOW requires delivery within 26-36 weeks after contract award to AFIT/ENWM at Wright Patterson AFB, OH, with a trade-in option for an existing Prototrak 1845SX machine. Additional requirements include 1-day onsite training for 5 users, a 2-year extended warranty, full documentation, and a traceable calibration of the new machine. Payment will be 100% after delivery and successful installation, with the contractor responsible for removing the old machine and installing the new one. All products must be manufactured in a qualifying country source in accordance with DFARS regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Instructions for Sources Sought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date 7/7/2025
STATEMENT OF WORK
FOR
PROTOTRAK 1845RX
1. BACKGROUND: The Air Force Institute of Technology (AFIT) has a requirement for (1)
Prototrak 1845RX CNC Lathe. This piece of equipment needs to be able to utilize the already in use, proprietary Prototrak RLX controller format found throughout the shop. AFIT’s experience with the Prototrak machines, limited space, floor weight capacity, as well as work requirements demand a very specific machine. Looking outside of the Prototrak brand would level serious setbacks in software and machine integration as well as an extremely steep and unnecessary and expensive learning curve for the entire Model Shop.
2. Minimum Technical Requirements: AFIT/ENWM requires a Prototrak® 1845RX 2-axis CNC lathe with the following technical capabilities:
2.1. Type of Machine: Shall be a 2-axis 1845RX model Prototrak CNC lathe equipped with a programmable carriage (Z axis), programmable cross slide (X axis), and a manual tailstock.
2.2. Swing Over Bed Capacity: Shall include minimum capacity of 18-inch swing over bed.
2.3. Swing Over Cross Slide: Swing over cross slide must be a minimum of 9in.
2.4. Distance Between Centers: Must be at least 42 inches. Distance between centers must not exceed 46 inches.
2.5. Floor Space: Shall not exceed max operating floorspace of 89in X 56in.
2.6. Machine Weight: Shall not exceed max machine weight of 3300lbs.
2.7. Spindle Motor: Spindle motor shall be 10 Horsepower.
2.8. Spindle Nose Size: Shall have standard D1-6 capability.
2.9. Spindle Through Hole: Shall be a minimum of 2.35in diameter.
2.10. Spindle: Shall have a spindle with a minimum capability of 80 RPM. Maximum capability of 2500 RPM.
2.10.1. Shall include 2 speed geared head.
2.11. Tailstock: Must include manually controlled tailstock that cannot be controlled by
CNC programs.
2.12. Coolant Pump: Shall include programmable coolant system.
2.13. Steady Rest: Shall include steady rest. Minimum capacity 7.8in.
2.14. Follow Rest: Shall include follow rest. Minimum capacity 3.9in.
2.15. Collet Closer 1: Shall include lever type collet closer.
2.16. Collet Closer 2: Shall include Sjogren-5c-D1-6 integral mount collet chuck.
2.17. Lighting: Install upgraded LED machine light. IP67 min. 42”min to 60”max length.
2.18. Controller: Shall have single touch screen Prototrak RLX machine controller.
2.18.1. Shall operate on Prototrak RX CNC software.
2.18.2. Must be able to be controlled by manual or CNC operation.
2.19. Software: Shall operate on Prototrak RX Software. Shall include all available software options including but not limited to the following.
2.19.1. Shall Include TRAKing for RX Lathes
2.19.2. Shall Include CAM File Out Converter
2.19.3. Shall Include DXF Converter
2.19.4. Shall Include Thread Repair
2.19.5. Shall Include All Advanced Features
2.19.6. Shall Include Tool Table
2.20. Documentation: Full documentation for maintaining, operating, and repairing the system, including all control software, must be included.
2.21. Training: Shall include 1-day, onsite training for Prototrak RLX controller.
2.22. Warranty: Must include 2-year extended warranty for parts and service.
2.23. Trade-In: Shall offset price with trade in of good condition Prototrak 1845SX.
2.24. Removal and Delivery: Contractor shall be responsible for removal of trade-in machine as well as delivery of new machine.
2.24.1. Contractor shall arrange for all cleaning, fluid removal, and all other preparations needed prior to rigging and removal.
2.24.2. Contractor shall arrange for all power disconnection of old machine.
2.24.3. Contractor shall arrange for all rigging and removal of old machine.
2.24.4. Contractor shall arrange for all power connections of new machine.
2.24.5. Contractor shall arrange for all rigging, placement, installation, setup and a traceable calibration of new machine.
3. QUALIFYING COUNTRY PRODUCTS: All products delivered to satisfy this requirement shall be manufactured in a qualifying country source in accordance with Defense Federal
Acquisition Regulation Supplement (DFARS) 225.872. Products from other than qualifying countries will not be accepted, and any costs associated with products from other than qualifying countries, including shipping, etc., shall be at the contractor’s expense.
4. DELIVERY, TRAINING AND INSTALLATION: The vendor will ship the complete system to AFIT/ENWM, including installation, training and set up within 26 to 36 weeks after the date of contract award:
Location
AFIT/ENWM
Air Force Institute of Technology (AFIT) 2064 13th St, Area B Building 470 Wright Patterson AFB, OH 45433
4.1. Vendor shall provide all necessary training for hardware and software use for 5 users with no expiration date for use.
4.2. A Delivery Point of Contact (POC) will be identified in the schedule of the final awarded contract.
5. WARRANTY: Free from defects in material and workmanship, normal and proper use in accordance with our instructions in the maintenance manual for a period of one (1) year.
6. PAYMENT: Full payment after delivery and proof the system operates as designed and meets the technical requirements listed above. This proof includes a signed installation document certifying those requirements have been met. 100% payment after delivery. The contractor shall be paid upon submission of a properly prepared invoice and after final inspection and acceptance has been made.
6.1. A proper invoice shall cite the contractor’s name and address, invoice number, invoice date, order number, contract line-item number (CLIN), description of the supplies or service, unit of issue, unit price and extended price, terms of any prompt payment discount offered, and who to notify in the event the invoice is defective.
6.2. The invoice shall be submitted to Wide Area Workflow (WAWF) in accordance with the terms of the final awarded contract.
7. DELIVERY PROCEDURES COMMERCIAL VEHICLES: All vehicles larger than a large pick‐up truck are required to be inspected by the Wright‐ Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.
7.1. Vehicles to be inspected include, but are not limited to, the following:
7.1.1. Step van/panel truck
7.1.2. Tractor/trailer, box, and flatbed containing cargo
7.1.3. Tanker trucks
7.1.4. Box Trucks
7.1.5. Tour buses
7.1.6. Garbage/recycled waste trucks
7.1.7. Concrete trucks/mixers, dump trucks
7.1.8. Cranes, recreational vehicles, petroleum tankers
7.2. This inspection will be conducted at Gate 16A located off State Route 444. The following are exceptions to vehicles utilizing the CVDG:
7.2.1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates, and the base will not assume liability for denied access.
7.2.2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre‐clearance form.
The driver shall present the pre‐clearance form to the entry controller at the next point of installation entry. This reentry can be at any base gate.
7.2.3. Wright Patterson Integrated Defense Plan, paragraph 3.10.12.9.2. All irregular deliveries will be sent to the CVDG for inspection. All visitors, which include contractors and commercial vendors without proper background checks and contractor passes, will not be allowed on WPAFB unless escorted by the receiving agency. This will take place after the individual(s) are issued a pre‐ clearance form at the CVDG. After successful completion of the vehicle inspection, the receiving agency will escort the individual to and from their destination on WPAFB. An inspector at the CVDG will contact the receiving agency, informing them to send an escort to the CVDG. Escorts will always remain with the vehicle while it is on WPAFB.
7.3. Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM). Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller