This Statement of Work (SOW) is for the Welaka National Fish Hatchery in Crescent City, Florida, seeking the purchase and installation of a propane gas heater for manatee pond water temperature regulation. The primary objective is to install a heater between two ponds to maintain water temperatures between 70 and 75 degrees, specifically for overwintering Florida manatees. Aqua Logic is identified as the preferred contractor due to their unique capability to heat water flow in an outdoor environment with high lake flow.
The project will be located at 1028 CR 309 Crescent City, Florida 32112, with service to begin as soon as possible. Normal duty hours are Monday through Friday from 7:00 AM to 3:30 PM, with provisions for emergency contact outside those hours. The deliverable is a boiler system for pond water temperature control. The technical coordination will be managed by Tony Brady (Deputy Project Leader) and Jorge Buening (Head Biologist), with a 5-workday review period for government inspection of deliverables.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_Past_Performance_Survey.doc | DOC document | |
| Attachment_2_Wage_Determination.pdf | ||
| Sol_140FS325Q0100.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Gas Heater
For the Manatee Pond
1. General
1.1
1.2
1.3
The Welaka National Fish Hatchery at 1011 CR 309 Crescent City, Florida is requesting the purchase of a a propane gas heater .
A gas heater needs to be installed between two of our ponds to help maintain water temperatures at a desired range between 70 and 75 degrees for the overwintering of Florida manatees. This gas heater brings in cool pond water to heat that is then returned to the heating area in the pond.
Contractor Qualifications: Aqua Logic is one of the very few companies that has even created a system that is able to heat the water flow in an outside environment and can accommodate a high process lake flow.
2. Place of Performance and Period of Performance
2.1 The gas heater will be installed at 1028 CR 309 Crescent City, Florida 32112
2.2 The service date to start this project, is as soon as possible.
2.3 Normal duty hours are Monday thru Friday 07:00am to 3:30pm. In the event of emergencies, contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Purchase of a gas heater to heat a water supply to hatchery ponds when the water temperature gets below a certain temperature.
4. Deliverables and/or Delivery Schedule:
4.1 Parts: Boiler System For Pond Water Temperature
5. Data Management Plan (DMP). N/A
6. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI)N/A
7. Evaluation and Acceptance N/A
8. Quality Control/Quality Assurance:
In the absence of other agreements negotiated with respect to time provided for government review, deliverables will be inspected, and the contractor notified of the COs findings within 5 workdays of normally scheduled review.
9. Technical Coordinator:
The primary individual Tony Brady, Deputy Project Leader 1011 CR 309 Crescent City, Florida 32112 386-467-2374 is responsible for the final product or service. The co-individual responsible is Jorge Buening Head Biologist 1011 CR 309 Crescent City, Florida 32112, same pertinent information.