Attachment_1_-_SOW.pdf

PDF 1 MB Posted

Attached to
CYCLIC REPLACEMENT OF SEPTIC PEAT MOSS Federal contract opportunity
Solicitation number
140P5325R0018
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a Statement of Work (SOW) for the Moores Creek National Battlefield in Currie, North Carolina, focused on the cyclic replacement of peat moss media in bio filtration septic systems. The project requires a contractor to remove and replace the existing peat moss media in twelve bio-filtration pods located in the park's wastewater septic field. Specific requirements include disposing of the old media offsite, installing new peat moss media to a 24-inch depth with specific characteristics (media pieces between 1-10mm, water holding capacity of 50-55%, and a 15-year lifespan), and conducting a thorough inspection of the filtration system to ensure proper operation.

The work must be completed within 90 calendar days after the Notice to Proceed, with performance restricted to 7:30 am to 4:00 pm, Monday through Friday. The project emphasizes visitor safety and park preservation, requiring close coordination between the park, contractor, and project managers. The National Park Service will provide a contractor staging area, and restroom facilities are available at the Visitor Center. The Contracting Officer for this project is Marilia Mateo, who can be reached at marilia_mateo@nps.gov or 470-819-0933.

View the file

Other files for this federal contract opportunity

Other files attached to CYCLIC REPLACEMENT OF SEPTIC PEAT MOSS, newest first.
File Type Posted
Attachment_3_-_Wage_Rate_Determination.pdf PDF
Sol_140P5325R0018.pdf PDF
Attachment_2_-_Price_Schedule.pdf PDF
Attachment_4_-_Past_Performance_Questionnaire.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Moores Creek National Battlefield

(MOCR)

Currie, NC

STATEMENT OF WORK:

Cyclic Replacement of Peat Moss Media in Bio Filtration Septic Systems

PMIS: 240205A

DATED:

November 27, 2023

NATIONAL PARK SERVICE

SOUTHEAST REGION

EAST MAJOR ACQUISITION BUYING OFFICE

MOCR – Replacement of Peat Moss Media in Bio Filtration Septic Systems

STATEMENT OF WORK (SOW) FOR REPLACEMENT OF PEAT MOSS MEDIA IN BIO FILTRATION

SEPTIC SYSTEMS

1. BACKGROUND

Moores Creek National Battlefield, located in Currie, North Carolina, preserves the site of one of the first Patriot victories of the American Revolution. Moores Creek, the namesake of the park, runs through the western part of the park, and is part of the Cape Fear river basin. In an effort to preserve and protect this waterway, the park installed the current peat moss bio-filtration system to ensure that the affluent from the park’s septic system is properly cleaned and filtered before it enters the leech field and runs down towards the creek. The current peat moss media in the filtration system was installed in 2012, but it has badly decomposed and is in dire need of replacement.

2. OBJECTIVES:

This project calls for the removal and replacement of the peat moss bio-filtration media in the twelve (12) bio-filtration pods located in the park’s wastewater septic field.

3. PLACE OF PERFORMANCE:

Work will be completed at:

A. Wastewater Septic Field, Moores Creek NB, 40 Patriots Hall Dr., Currie, NC 28435.

4. PERIOD OF PERFORMANCE:

All tasks for this contract must be completed within 90 days after the start date on the Notice to Proceed.

Days listed herein refer to calendar days.

The services and construction work in this SOW shall be completed in accordance with the following schedule:

• There will be a Pre-Con Meeting after award of the contract and prior to start of any actual contractual services. The CO will arrange the meeting, either on-site or via tele-conference, with the key members of Contractor’s team, the COR/Park Project Manager, and the CO. The following topics will be discussed.

Introduction of key personnel and their contact information.

Roles, responsibilities, and lines of authority of key personnel.

Communication and correspondence procedures.

Park Rules and Regulations.

▫ Access and permit requirements of the Park ▫ Rules of the road, housekeeping, alcohol use, firearms, and pets, Submittals and Modifications during design.

Submittals and Request for Information (RFI) process.

Other business and requirements relating to work.

5. SCOPE:

This project calls for:

• Removal and disposal offsite of the existing, old peat moss bio-filtration media in the twelve (12) filtration pods.

• Installation of new peat moss filtration media in these twelve (12) filtration pods.

• Inspection and operational check of the twelve pods (12) to ensure they are operating properly, and the affluent is flowing as it should.

6. TASKS:

Under this contract, the contractor shall complete the following tasks and requirements:

• Removal and replacement of peat moss bio filtration media.

o Contractor shall remove existing peat moss media in the twelve (12) bio-filtration pods located in the park’s wastewater septic field, and properly dispose of it offsite in accordance with applicable State and Federal laws and regulations.

o Contractor shall install new peat moss bio-filtration media in these twelve (12) bio-filtration pods.

Each filtration pod is approximately 27 sq feet.

Media should be placed to a depth of 24 inches.

Media pieces should be between 1 – 10mm.

Media should have a water holding capacity of 50 – 55% of volume.

Media should have a life span of about 15 years under normal usage and conditions.

o Contractor shall inspect the filtration system to ensure it is operating properly.

o Contractor shall reassemble the peat moss pods in accordance with factory specifications.

o Contractor shall clean the work area, disposing offsite of any excess peat moss media, packaging, or other trash and debris.

7. DELIVERABLES:

NA

8. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION (GFP,

GFM, GFE, OR GFI):

The National Park Service (Moores Creek NB) will designate a Contractor Staging Area. No government property or equipment will be furnished to the contractor. Restroom facilities are located at the Visitor Center, approximately 400’ from the worksite.

9. SECURITY:

Park hours are from 9:00 am – 5:00 pm; park roads are open 7:00 am – 5:00 pm. Before and after these hours, gates are locked, closing roads to vehicle traffic. Contractor shall perform work between 7:30 am and 4:00 pm, Monday – Friday. All other hours must be requested prior to a need to work beyond the scope of these hours.

10. TRAVEL:

All travel will be according to Federal Travel Regulations.

11. SPECIAL MATERIAL REQUIREMENTS:

NA

12. OTHER UNIQUE REQUIREMENTS:

Close coordination between the park, the contractor, and the on-site Project Managers is essential in maintaining the park for visitor enjoyment while work is being performed. Visitor safety is paramount.

Barricades, cones, flaggers, etc. and all safety equipment must be in place prior to the start of work and during all work on site. Safety planning and work schedules need to take this into account.

13. QUALITY ASSURANCE REQUIREMENT:

The contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with this statement of work, and the subsequent contract.

14. PROJECT PERSONNEL:

Contracting Officer:

Marilia Mateo marilia_mateo@nps.gov 470-819-0933 mailto:Matthew_Woods@nps.gov mailto:David2_Smith@nps.gov

Statement of Work (SOW) FOR REPLACEMENT OF PEAT MOSS MEDIA IN BIO FILTRATION SEPTIC SYSTEMS
1. Background
2. Objectives:
3. Place of Performance:
4. Period of Performance:
5. Scope:
6. Tasks:
7. Deliverables:
8. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI):
9. Security:
10. Travel:
11. Special Material Requirements:
12. Other Unique Requirements:
13. Quality ASSURANCE Requirement:
14. Project Personnel: