Attachment 1 - SOW.pdf

PDF 130 KB Posted

Attached to
Repair Roof Bldg 16
Solicitation number
W50S8W25RA005
Issued by

About this file

This Statement of Work (SOW) details a roof repair project for Building 16 at the Wyoming Air National Guard's 153d Airlift Wing located at the Cheyenne Regional Airport. The project involves repairing two specific locations of EPDM roofing that are delaminating: one above the CSS area and another at the southwest corner of building 16's hangar. The contractor will be responsible for site assessment, conducting necessary repairs, ensuring areas are properly sealed, and cleaning up the work site. Additional requirements include coordinating with the Point of Contact (POC) at least five working days before mobilization, complying with base access and security procedures, and working during normal hours of 7:00 am to 4:30 pm Monday through Friday, excluding federal holidays. The contractor must supply all necessary equipment and tools, with associated costs included in the bid, and cannot use government equipment.

View the file

Other files

File Type Posted
Pic 1.jpg JPG image
Pic 2.jpg JPG image
Questions and Answers.docx DOCX document
Pic 3.jpg JPG image
Solicitation Amendment W50S8W25RA0050001 SF 30.pdf PDF
Solicitation - W50S8W25RA005.pdf PDF
Attachment 2 - Wage Determination WY20250023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

WYOMING AIR NATIONAL GUARD

217 DELL RANGE BLVD. CHEYENNE, WYOMING

DPEZ252201

REPAIR ROOF ON BUILDING 16

PURPOSE:

Ensure the repair of building 16 roof in two locations to prevent additional damage.to the facility.

LOCATION:

153d Airlift Wing, located at the Cheyenne Regional Airport, 217 Dell Range Blvd, Cheyenne, WY 82009.

COORDINATION:

The contractor shall coordinate all work with the POC.

Contact the POC five (5) working days in advance of mobilization on site and provide proper documentation to allow for processing of base access paperwork. This requirement includes deliveries of any kind. Same day request and access is not always possible.

DAMAGE:

The Contractor shall be responsible for any damages caused to any existing work areas during the entire performance of this project. The Contractor shall be responsible to rectify or replace any equipment damaged without additional expense to the Government.

ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES:

Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Point of Contact (POC). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

All commercial, contractor, and sub-contractors vehicles are subject to random inspections each time they enter the base.

If badges will be issued, they will be issued by the 153d Security Forces Squadron (SFS) to the contractor through the 153 CES POC. Badges shall be issued, tracked, and collected in accordance with instructions from Security Forces.

The following are the requirements and procedures for the contractor: Contractors working in Controlled or Restricted areas or any area on the flight line must be issued a specific contractor identification badge or be escorted. (This project is not located on the flight line).

HOURS OF WORK:

Normal hours of operation for service are 7:00 am through 4:30 pm Monday through Friday, excluding any federally recognized holidays.

Requests to work outside the normal work hours must be made to the POC at least three working days in advance. The POC may reject requests at the convenience of the government. Failure to make requests at least three (3) working days in advance may result in being denied base access or being required to leave the base.

CLEAN-UP:

The contractor shall clean up and remove from the site all rubbish, which has resulted from any contract work and shall leave the premises in a clean, orderly and safe condition, acceptable to the POC.

Equipment:

1. The Contractor will supply all necessary equipment and tools to complete the project. Any costs for procuring equipment and tools must be included in the bid.

2. The Contractor will not utilize any government equipment or tools.

DESCRIPTION OF WORK:

1. Site Assessment:

- Inspect the two locations for specific issues.

2. Repair Work:

- Repair EPDM that is delaminating above the CSS area of building 16.

- Repair EPDM that is delaminating above the SW corner of building 16 hangar.

- Ensure repaired areas are sealed after repairs are complete.

POINT OF CONTACT:

All questions shall be submitted by E-mail. Questions will be answered no later than 10 days following receipt. Unless otherwise stated, all questions will be routed through the Contracting Officer and the Contracting Officer Representative.

File details come from the government source that posted it. Updated .