Attachment 1- SOW.pdf
PDF 442 KB Posted
- Attached to
- TT&E and Repair of Four (4) Tow Tractors Model MT3 Standard Aircraft Towing System (SATS)
- Solicitation number
- 70Z03824QE0000063
About this file
This document is a Statement of Work (SOW) for the refurbishment of four (4) MT3 Standard Aircraft Towing System (SATS) Tow Tractors for the U.S. Coast Guard (USCG) at Air Station Clearwater. The scope includes a mid-service-life overhaul, repair of identified discrepancies, full repainting, and return of the tractors to a "like new" operational status. The SOW details the specific requirements, known discrepancies, and procedures for the overhaul, testing, and acceptance of the refurbished tractors. It also outlines the roles and responsibilities of the contractor and USCG points of contact.
The related federal contract opportunity is a Request for Quotation (RFQ) for the Tow Tractor Towing, Testing & Evaluation (TT&E) and Repair of the four (4) MT3 SATS Tow Tractors. The RFQ is an unrestricted requirement with a NAICS code of 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing. The closing date for offers is August 9, 2024, and the anticipated award date is on or about August 13, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4- Tractor Pictures.pdf | ||
| Attachment 2- Schedule of Services.xlsx | XLSX spreadsheet | |
| Attachment 3- Terms and Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 GENERAL
1.1 Background
The United States Coast Guard (USCG or simply CG) operates an aircraft Tow Tractor, Model MT3, Standard Aircraft Towing System (SATS), at Air Station Clearwater for small to mid-range, all-weather, CG aircraft movements, as a multi-purpose vehicle for aircraft support equipment. Air Station Clearwater deploys the SATS tractor to the Great Inagua (GI) deployment site where, within the proximity to a salt distillation facility with brine ponds, causes severe surface corrosion of the steel tractor(s). Further, the vehicles deployed to GI operate off improved surfaces, increasing their wear and tear. Clearwater SATS tractors require refurbishment to extend their service life and to ensure safe operations. Tractor serial numbers 30648, 30651, 30652 and 30654 are included in this Statement Of Work (SOW).
1.2 Scope
The CG requires the refurbishment of four (4) MT3 SATS Tow Tractors for physical and functional discrepancies related to the overall condition of all installed/mounted components for any un-serviceable or beyond repair conditions as a mid-service-life overhaul project, to include all aforementioned corrosion discrepancies of the entire tractor assembly.
All four (4) Tow Tractors shall be repaired to a fully operational service status and be entirely re-painted as part of as a mid-service-life overhaul effort. As a primary task, the Contractor shall provide the CG documentation for mandatory repair actions to return the Tow Tractor(s) to a fully operational service status IAW OEM standards, to a "like new" status.
The Contractor is responsible for the pick-up and return of the Tow Tractor(s) from Air Station Clearwater to the Contractor’s facilities and returned to Air Station Clearwater post mid-service-life overhaul.
The Contractor may take one (1) each, two (2) each, or all four (4) Tow Tractors at one time or alternate times for the remainder to start the initial mid-service-life overhaul effort, depending upon their facility limitations or production schedules. A mid-service-life overhaul effort is anticipated to require 30 to 45 days, from pick-up to delivery, per Tow Tractor.
The Contractor shall furnish all facilities, inspection materials, parts, equipment, tools, and services necessary to fulfill the requirements of this contract.
1.2 APPLICABLE DOCUMENTS
1.2.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with to meet the requirements of this contract:
- Federal, state, and local laws applicable to the inspection, repair, and testing of aircraft tow tractors and Low Speed Vehicles (LSV).
Attachment 1
- TM 1-1740-221-13&P: MT3 SATS Tow Tractor PN/ 47400 (NSN 1740-01-575- 5662) EIC UDJ; Model MT3 SATS; Technical Manual; Operator and Field Maintenance Manual, Including Repair Parts, and Special Tools List, Dated: 23 February 2015.
- USCG Mandatory Special Requirements (MSR) Maintenance Procedure Card (MPC) 153801.6; Dated: 16 July 2019.
The Government (SOW 10.0) will provide the above applicable compliance documents to the Contractor, when awarded / requested.
2.0 MID-SERVICE-LIFE OVERHAUL; WITH-IN SCOPE
2.1 The Contractor shall perform a mid-service-life overhaul on each Tow Tractor, IAW the applicable OEM specifications manual (MT3 SATS Tow Tractor 47400; Technical Manual). The CG MSR MPC 153801.6; Dated: 16 July 2019, along with the OEM manual, shall be used pre-overhaul, for physical and functional discrepancies related to the operation and drivability of the Tow Tractor(s). All discrepancies discovered shall be considered with-in the SOW.
2.2 The Contractor is required, with-in the SOW, to identify / diagnose for correction, each documented discrepancy, for all installed components, as a functional, an unserviceable condition, or a Beyond Economic Repair (BER) deficiency.
2.3 Any and all physical, functional, unserviceable and BER discrepancies / conditions documented shall be considered with-in the SOW for a mid-service-life overhaul.
2.4 The repair or replacement of any and all BER conditions for all installed components shall be considered with-in the SOW.
2.5 Replacement or repairs during a mid-service-life overhaul shall return the Tow Tractor(s) to a fully operational condition IAW OEM standards and to a "like new" status shall be
2.6 The physical condition of all installed components of the Tow Tractor(s) shall be inspected IAW OEM specifications and standards for overall condition, damage, appearance, and function; to include areas of corrosion for treatment or repair shall be
2.7 The removal and re-installation of exterior and interior installed components, seats, mirrors, etc., required to clean and treat areas of corrosion, then to re-paint the entire “white” and/or “black” areas of the Tow Tractor(s), shall be considered with-in the SOW.
2.8 Each Tow Tractor exterior body and exterior components shall be cleaned, prepped, re-painted with-in the scope of this SOW.
2.9 The entire “white” and “black”, interior, and exterior areas, of the Tow Tractor(s), to include the installation of new floor grip tape, shall be considered with-in the SOW.
2.10 Prior to any prep work for painting, example; scrapping, blasting, or chemical stripping, the Contractor shall photograph the Tow Tractor(s) for the location /size / lettering of all installed / applied stickers / stencils / markings, for post overhaul re-application, upon completion of painting.
2.11 OEM (Tug/Textron) parts or parts from an authorized OEM distributor shall be used in the repair of the Tow Tractors.
2.12 The Contractor is responsible for the pick-up and return of the Tow Tractor(s) from Air
Station Clearwater to the Contractor’s facilities and returned to Air Station Clearwater, post mid-service-life-overhaul.
3.0 KNOWN DISCREPANCIES - WITHIN SCOPE OF THE MID-SERVICE-LIFE
OVERHAUL
3.1 30648: Engine Oil leak
Missing batteries
Heavy corrosion on body
Heavy seat damage
Corrosion on leaf springs
Cracked Windshield
Windshield wash fluid reservoir missing
Corrosion on exhaust manifold
Rusty fly wheel
3.2 30651: Will not start.
Missing gas pedal
Steering Ram inoperable
Corrosion on body
Flat tires
Heavy seat damage
Cracked Windshield
Windshield wash fluid reservoir missing
Corrosion on exhaust manifold
Corrosion on leaf springs
3.3 30652: Steering Ram inoperable
Heavy corrosion on body
Heavy seat damage
Exhaust disconnected from exhaust manifold.
Corrosion on exhaust manifold
Corrosion on leaf springs
Cracked Windshield
Missing windshield wash reservoir
3.4 30654: Will not start.
Steering Ram replacement
Heavy Corrosion on body
Heavy seat damage
Missing gas pedal
Ignition switch missing
No batteries
Missing mirrors
Air filter assembly replacement
Bald tires
Missing taillights
Replace Seat
Corroded exhaust manifold
Corroded fly wheel
Corroded leaf springs
Broken windshield wash reservoir
Missing fuel filter bowl
4.0 OUTSIDE SCOPE DOCUMENTATION OR ABOVE AND BEYOND (A&B)
DISCREPANCIES
4.1 All discrepancies found on any Tow Tractor, outside of the SOW, shall be considered as additional or simply Above and Beyond (A&B) work. Any A&B discrepancies found during the mid-service-life overhaul effort, shall be identified, and documented by the Contractor and shall be presented to the Contracting Officer (SOW 10.1) as an A&B repair quote for review and authorization prior to any repair work or effort commencing.
4.1.1 OEM (Tug/Textron) parts shall be used in the repair of the Tow Tractor(s). Any after-market equivalent parts shall be presented to the Contracting Officer for review authorization prior to any repair work commencing and shall be approved by the CG POC(s) (SOW 10.1) prior to installation.
4.1.2 The A&B repair quote shall identify which parts are OEM and which are equivalents for CG determination prior to any repair work commencing.
The A&B repair quote shall include the following as a minimum:
- Description of the discrepancy.
- Limits of damage (if applicable).
- Labor hour costs.
- Parts/Material costs.
- Total cost for each discrepancy repair.
4.1.3 The CG will review the list of A&B discrepancies and will either accept or decline the
Contractor’s proposal for repairs. The CG will make the final determination on which items to repair and may choose to not repair all items identified on the Contractors A&B repair quote.
4.1.4 The Contracting Officer will authorize the Contractor to proceed with all or only specific approved A&B discrepancy repairs via a funded modification to the original order.
4.1.5 Any work performed by the Contractor without a signed, funded modification to the order will not be reimbursed by the CG. Once the modification is received by the Contractor, the funded repairs shall be performed IAW OEM specifications and standards and approved parts.
5.0 POST MID-LIFE-OVERHAUL TESTING AND INSPECTION
5.1 The Contractor shall conduct an operational test and post mid-service-life-overhaul inspection of the Tow Tractor(s). This effort is to identify and correct any remaining, or newly manifested deficiencies, related to the mid-service-life-overhaul repairs, post overhaul operation, or the lack of physical characteristics (markings or missing items).
5.2 The Contractor shall confirm the Tow Tractor(s) is/are operational and configured IAW
OEM specifications and standards using the OEM manual 47400 and the CG MSR MPC 153801.6.
5.3 Any new discrepancies revealed by the Contractor during the testing process are with-in the SOW and do not require review authorization for correction prior to any repair work commencing.
5.4 Post mid-life-overhaul inspection discrepancies shall be identified and relayed to the CG
POC(s) (SOW 10.1), prior to requesting return shipment.
5.5 The Contractor shall provide the documentation of their formalized inspection, testing procedures, and repair actions for the repaired Tow Tractor(s), to ensure quality assurance with both the Contractor and CG POC(s) (SOW 10.0).
5.6 The minimum standards of all stated reference material herein the SOW shall be met and acknowledged by the Contractor.
6.0 SHIPPING TO / FROM CONTRACTOR’S FACILITY
6.1 Post award of this mid-service-life-overhaul contract, the Contractor may take one (1) each, two (2) each, or all four (4) Tow Tractors at one time or may alternate pick-up times for the remainder depending upon their facility limitations or production schedules.
Shipping charges will be for each round-trip pick and delivery, not each way.
6.2 Post award of this mid-service-life-overhaul contract, the contractor shall contact Air
Station Clearwater POC(s) (SOW 10.2) for coordination of the initial pick-up of one (1), two (2), or all four (4) tractors for overhaul.
6.3 CG Air Station Clearwater personnel shall inform ALC POC(s) (SOW 10.1), at the time of initial pick-up shipping, with-in two (2) days, the initial pick-up of one (1), two (2), or all four (4) Tow Tractors and confirm the serial number(s) received / accepted by the Contractor, for “Confirmation Issue” in the CG supply system.
6.4 Prior to shipping for return, the Contractor shall provide the CG POC(s) (SOW 10.0) documentation (report, pictures, or any other means) to prove that funded actions have been reasonably complete by the Contractor. Once the CG has determined, based on the documentation provide by the Contractor, approval to ship will be authorized.
6.5 The Contractor shall ensure the preservation, packing, and marking of the overhauled Tow
Tractor(s) is/are IAW commercial best practices for return shipment deliveries.
6.6 The Contractor is / shall be responsible for any damage incurred during transport.
6.7 Both the Contractor and Air Station Clearwater personnel shall be responsible for any damage incurred during the delivery off-load at CG Air Station Clearwater.
7.0 INSPECTION AND ACCEPTANCE
7.1 An inspection and acceptance of the Tow Tractor(s) will be performed by CG Air Station Clearwater Quality Assurance (QA) personnel at Air Station Clearwater.
7.2 Air Station Clearwater personnel shall have three (3) days, starting the following day, from the day of delivery to complete the inspection and acceptance of the overhauled Tow Tractor(s).
7.3 Air Station Clearwater Quality Assurance (QA) personnel shall perform a physical and operational inspection IAW MSR MPC 153801.6; Dated: 16 July 2019 and also review the Contractor’s provided documentation, to confirm that the required funded repair actions have been performed IAW the required specifications.
7.4 Once Clearwater Quality Assurance (QA) personnel has determined, based on the acceptance inspection, Air Station Clearwater shall inform ALC POC(s) (SOW 10.1) for “Confirmation Receipt” of the Tow Tractor(s) in the CG supply system.
7.5 If a Tow Tractor is determined unacceptable by Clearwater Quality Assurance (QA) personnel IAW the requirements of this SOW and OEM specifications, the Contractor will be notified immediately.
7.6 The Contractor, following the notification of an unacceptable finding, shall determine and propose a course of action to correct the deficiency to the Contracting Officer.
7.7 The Contracting Officer will accept and authorize the Contractor to proceed or will not accept or decline the Contractor’s proposal for repairs and request a new course of action.
7.8 Prior to any invoicing or payment, a completed acceptance inspection shall be resolved.
8.0 PLACE OF PERFORMANCE
The primary place of performance for the mid-service-life-overhaul effort, repair, and painting IAW this SOW will be the Contractor’s facility.
9.0 DELIVERABLES
The items below are requirements of this SOW.
ITEM DELIVERABLE REQUIREMENT
1 Initial pick-up shipping Contractor & Clearwater
Personnel
2 Mid-Service-Life Overhaul Contractor
3 A&B Repair Quote Approval by CG via contract modification
4 Operational Testing and Documentation Contractor
5 Return Shipping Approval by CG POC(s)
6 Inspection and Acceptance Clearwater QA
10.0 CG POC(s)
10.1 Aviation Logistics Center
Contract Specialist – Jackson Perry (252) 312-7411 Email: Jackson.S.Perry@uscg.mil
Item Manager – Daniel F. Knotts (252) 335-6477 Email: Daniel.F.Knotts@uscg.mil
Aviation Support Equipment Specialist – Christopher R. Barr (252) 384-7292 Email: Christopher.R.Barr@uscg.mil
10.2 Air Station Clearwater
Engineering Officer – CDR Ricky Williams (571) 607-8645 TEAMS Email: richard.c.williams@uscg.mil
OPBAT Assistant Engineering Officer – LCDR Jeb Slick
(240) 329-6581 cell or (206) 820-3655 TEAMS Email: jeb.s.slick@uscg.mil
OPBAT Maintenance Officer – CWO Jeff Brundage
(727) 535-1437 x1385 deck or (571) 608-7912 TEAMS Email: jeffrey.t.brundage@uscg.mil
10.3 Physical Address Coast Guard Air Station Clearwater
15100 Rescue Way, Clearwater, FL 33762
- Located on the grounds of St. Pete–Clearwater International Airport (KPIE)
- Entry requires prior approval prior to arrival, a military sponsor to enter, and an escort throughout the pick-up / delivery visit.
File details come from the government source that posted it. Updated .