Attachment 1 SOW.pdf
PDF 259 KB Posted
- Attached to
- Air Handler Compressor Replacement-Repair Federal contract opportunity
- Solicitation number
- 12905B24Q0122
About this file
This document is a Statement of Work (SOW) for the repair of a failed HVAC compressor in Air Handler Unit #4 at a USDA Agricultural Research Service facility. The SOW specifies the required tasks for the contractor to replace the failed Hitachi HVAC compressor, including installing new necessary components and topping off the R22 refrigerant. The SOW indicates the repair is critical due to the need to maintain temperature in the facility's greenhouse research area.
The related federal contract opportunity is a Request for Quotation (RFQ) issued by the USDA Agricultural Research Service Pacific West Area for the Air Handler Compressor Replacement-Repair project. The RFQ has a solicitation number of 12905B24Q0122 and is set aside for small businesses under NAICS code 238220. Offers are due by June 18, 2024 at 5:00pm PST, with a 30-day delivery requirement. The RFQ incorporates FAR clauses for commercial items and requires offerors to complete FAR 52.212-3 Offeror Representations and Certifications online at SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Terms and Conditions 12905B24Q0122.pdf | ||
| Attachment 2 WAGE DETERMINATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project: Air Handler 4, A/C Compressor
Repair by Replacing
GENERAL INFORMATION
1.0 Scope of Work: E m e r g e n c y ! Repair By replacing Hitachi M#4002SC-H R22
HVAC Compressor, and necessary components.
2.0 Background: TTFVRU has a Hitachi HVAC compressor that has failed, in
AHU (Air Handler Unit) #4. The AHU has one compressor! The repair is critical to building operations due to the fact the AHU cannot cool the building without an A/C Compressor. With anticipated outdoor temps in the upper 90’s we risk have interior building temps in the mid to upper eighties to low 90’s. These interior temps could cause the lose of research in our Greenhouse area. It is critical to research to have the compressor replaced ASAP.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks: The contractor shall follow appropriate state and federal regulation for the replacement of Compressor in AHU 4. The compressor shall be installed with new necessary components to function efficiently. A top off R22 refrigerant maybe required after installation. Unit will be started and ran to insure correct operation. A crane is necessary to lift compressor to the Air Handler position.