This document is a Statement of Work (SOW) related to a modification to add funds to an existing federal contract with the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education. The SOW provides details on the requirement to install radon mitigation equipment at the Taos Day School. Key elements include:

The contractor shall furnish all labor, materials, equipment, and transportation necessary to perform radon mitigation system installations at the Taos Day School. Work includes installing radon mitigation fan systems, sealing floors and walls, and conducting post-installation testing to verify radon levels are below the EPA action level. The period of performance is 120 calendar days from the notice to proceed. Pricing shall be in accordance with the existing contract's labor rates and material costs. This is a firm-fixed price requirement with funds added via modification to the existing contract number A17PC00054.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .