This document is a Statement of Work (SOW) for a design-build services contract to upgrade the playground at the Lake Valley Navajo School in Crownpoint, New Mexico. The project includes demolition of the existing playground surface and equipment, and installation of new playground equipment, shade structures, and landscaping.
The SOW outlines the offeror requirements, scope of work, applicable codes and standards, project design requirements, playground equipment and installation specifications, and other administrative details such as the work schedule, security requirements, and payment/closeout procedures. Key requirements include IPEMA certification for the playground equipment and surfacing, ADA accessibility, and oversight by a certified playground safety inspector during installation. The period of performance is 30 calendar days from the Notice to Proceed. The contracting officer's representative is Barbara Hanson, Facility Manager at the New Mexico Navajo Central Agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_SF25_Performance_Bond.pdf | ||
| Attachment_7_-_Wage_Determination.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Attachment_5_SF25A_Payment_Bond.pdf | ||
| Attachment_6_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Attachment_3_SF24_Bid_Bond.pdf | ||
| Sol_140A2324R0044.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.0 Location
STATEMENT OF WORK
Design-Build Services for
Lake Valley Navajo School Playground Project
The project is located on the Lake Valley Navajo School campus. The school is located at North NM State Hwy 371, CR 7750, Crownpoint, New Mexico, 87313.
2.0 Background
This project will be a design-build project for Lake Valley Navajo School, K (Kindergarten) through 5th grade. The school has an existing playground with dirt surface and play equipment that does not meet current codes. The project will include demolition and upgrade of the existing playground surface, play equipment, adding shade structures and landscaping as outline in the design requirement.
3.0 Offeror Requirements
Offerors must be Prime Contractors licensed by the State of New Mexico and/or Arizona.
Provide a copy of Contractor's License when submitting a proposal.
Offerors are strongly encouraged to conduct a site visit during the bidding phase at no charge to the Government via advanced arrangements with Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency.
Offeror shall be a manufacturer certified installer and have a National Recreation and Park Association certified playground safety inspector on staff.
4.0 Scope of Work
4.1 The design-build contractor shall furnish all labor, tools, equipment, transportation, materials, services, and necessary to design and construct all playground equipment, shade structures, and associated site improvements as specified and described.
4.2 The contractor shall be responsible for the professional quality, technical accuracy, verification of measurements, timely completion, and restoration of the area.
5.0 Applicable Codes and Standards
5.1 U.S. Consumer Products Safety Commission (CPSC) "Public Playground Safety Handbook".
5.2 ASTM International (ASTM) Standard F 1487 for Standard Consumer Safety Performance Specification for Playground Equipment for Public Use.
5.3 Americans with Disabilities Act (ADA) Accessibility Guidelines for Play Areas.
5.4 Americans with Disability Guidelines for Buildings and Facilities.
5.5 All playground and surfacing are required to be certified by the International Play Equipment Manufacturers Association.
5.6 The construction documents shall comply with current laws, codes, and guidelines contained in the "Safety, Health, and Accessibility Guidelines for Architects, Engineers, and Design Firms", Indian Affairs Division of Safety and Risk Management, dated May 2020.
5.7 The NFPA 5000, Building Construction and Safety Code applies to this project.
5.8 Fully compliant with Americans with Disabilities Act/Architectural Barriers Act Guidelines
(ADAABAG).
5.9 25 IAM, Chapter l.5.D.7and Chapter 2.5.E.7
5.10 BIA Safety and Health Handbook, Topics 26.9i.
5.11 Design services shall be provided in compliance with the BIA School Facilities Design Handbook and Space Templates, March 30, 2007.
6.0 Project Design Requirements
Demolition Existing play equipment located between Bldg. 734 and Bldg. 736.
Basketball goals shall be removed from the court that is on the west side, closest to the existing play equipment
Provide on the existing playground and play equipment for upper grades; (k -5th) as follows:
• New playground and play equipment
12 Event Play Equipment 2 Climbers Swings for 4
• Age Group, ages 5 years old to 12 years old.
• ADA accessibility to the playground and the equipment.
• Shade structure or shade cloth over the new play equipment
• Shade structures require engineered and sealed drawings.
• Principal shall make all color selections
• Principal shall approve final play equipment selections and layout
• Upgrade on the existing playground between the Dormitory and School building.
• Poured in place solid surfacing
Basketball Courts
• Retain and refurbish the basketball court located on the east side of the existing play equipment.
7.0 Playground Design and Equipment Requirements
7.1 Playground equipment and surfacing are required to be IPEMA Certified.
7.2 Access for maintenance is required with a minimum opening of 1 0' -0" clear for installation;
12' -0" is preferred.
7 .3 Provide a minimum of 8' -0" between playground walls and other items for access.
7.4 Utilities are not permitted to pass through, over or under play areas. This includes water, sanitary sewer, electrical, gas, communication cables, etc.
7.5 Surfaces adjacent to play areas must be paved or treated to control erosion and for ease of maintenance.
7.6 No site drainage or roof drainage is allowed to enter playground or play equipment containment areas. Play equipment cannot be installed within ponding areas.
7.7 All permanent playground equipment must be installed within concrete borders with ADA compliant access.
7.8 All new play structures must include ADA accessible play equipment. Every playground must have an accessible path leading to the play area. ADA accessibility shall comply with the most current publication of "Guide to ADA Accessibility Guidelines for Play Areas" as published by the Architectural and Transportation Barriers Compliance Board.
7 .8.1 All landings shall be ADA compliant.
7.8.2. All slopes must be ADA compliant.
7.9 Ramped playground structures are preferred.
7 .10 Include a trash receptacle designed for exterior use.
7 .11 Arch swings are preferred. If single post swings, they must be clamp attached, and no more than 3 bays.
7 .12 Provide drainage out of the play area.
7 .13 Wind screens shall be installed on fencing in potential high wind areas.
7 .14 Equipment with built in shade structures or shade structures over large pieces of equipment is preferred. All shade structures require sealed engineer drawings.
7 .15 A poured in place surfacing for 8' Fall Height is required.
7.16 All equipment shall be purchased from a playground equipment manufacturer with adequate product liability insurance. Manufacturers' representatives shall include a Certified Playground Safety Inspector (CPSI).
7 .17 The International Playground Equipment Manufacturers Association (IPEMA) must certify all components of the purchased equipment.
8.0 Installation Requirements
8.1 Design drawings and specifications shall be submitted to the principal for review and approval. Playground equipment colors to be selected by owner.
8.2 After approval by the principal, design drawings and specifications shall be submitted to Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency, for submission to the BIA Division of Safety and Risk Management (DSRM) for review and approval.
8.3 DSRM approved Architectural and Engineering construction drawings shall be used to construct the project. All proposed designs and drawings must be reviewed and approved prior to ordering any materials and installation.
8.4 Five (5) sets of the STAMPED design documents, full size drawings and specifications, shall be submitted at the l 00% completion for review by the school, New Mexico Navajo Central Agency, and BIA DSRM.
8.5 All equipment shall be installed according to manufacturer specifications and meet current industry standards.
8.6 The installation must have on-site CPSI certified personnel to oversee the installation.
8.7 No other organization or persons may install playground equipment on school grounds without approval by Bureau personnel.
8.8. Installation shall include a meeting with key school personnel. The meeting should include information on conducting a team inspection and how the equipment is to be used.
8.9 Provide final as-built drawings and specifications in AutoCAD, latest release software, and submitted on electronic storage. Provide final operation manuals, operating instructions, and other closeout documents.
8.10 Prior to Final Acceptance by the Owner, the Contractor shall provide an "As-Built" drawing which documents that each piece of play equipment is constructed with the required use zone and that no use zones overlap.
8.11 Prior to Final Acceptance by the Owner the Contractor shall provide written certification that each piece of play equipment has been inspected by an independent third party National Recreation and Park Association certified playground safety inspector, and the construction and installation of each piece of equipment fully complies with the ASTM F-1487-11 and the U.S.
Consumer Product Safety Commission (CPSC) Handbook for Public Playground Safety.
9.0 Pre-Construction Submittals
The Contractor shall submit a Health and Safety plan in accordance with 29 CFR 1910.120 that is protective of workers and the public.
10.0 Work Schedule
The work shall be performed on Monday through Friday between the hours of 8:00 AM and 4:30 PM local time. Alternate time schedule shall be preapproved by the Contracting Officer.
11.0 Special Requirements
Offerors to provide priority certificate from the Navajo Business Regulatory
11.1 Offerors are strongly encouraged to conduct a site visit during the bidding phase at no charge to the Government via advanced arrangements with Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency.
11.2 The Contractor is responsible and required to pay the Navajo Nation Business Activity Tax.
Contact The Office of the Navajo Tax Commission - Navajo Nation at 928-871-6681 or visit the website: www.tax.navajo-nsn.gov.
In addition, local and state gross receipt taxes shall be paid by the Contractor.
11.3 Contractor must be licensed in the State of New Mexico. Provide a copy of Contractor's License to the Contracting Officer.
11.4 Temporary Utilities.
Contractor shall arrange with local utility companies for temporary connections and payment arrangements.
11.5 Contractor shall be responsible to contact, schedule and pay for blue staking services for natural gas, electrical, telephone and other utilities not shown on the BIA proposed route map.
In the event a utility line is damaged by the Contractor during the construction period, the Contractor shall immediately repair or replace the damaged utility line at no cost to the Government.
11.6 The Contractor shall comply with current COVID check guidelines at the school location (COVID symptoms checks, mask required and social distancing)
11.7 Any unsafe work practices shall be reported to Mr. Harrison Nez, Agency Safety Officer (505)786-6191 for immediate resolution.
12.0 Security Requirements
In accordance with the U.S.C. 3207, Indian Child Protection and Family Violence Prevention Act, 42 U.S.C. 13041, Crime Control Act of 1990, and Department Manual 441 (441 DM 5), Personnel Security and Suitability Requirements, the Construction Foreman and Alternate on the job site are required to undergo a background and fingerprint check.
13.0 Period of Performance
The Period of Performance shall be 30 calendar days from the date of Notice to Proceed.
14.0 Payment and Closeout
Completed work shall be approved and signed off by Barbara Hanson, (COR) after the following are completed:
• Final inspection performed by Principal, School Maintenance Worker and Contractor
• Training of local school staff designated by the principal.
• Final Inspection by Division of Safety and Risk Management
• Warranty and any operating manuals are provided to Barbara Hanson.
• Final invoice shall be submitted in accordance with the contract and certified completion of the project.
15.0 Technical Consultation and Coordination
Contact Barbara Hanson, Facility Manager, New Mexico Navajo Central Agency, Contracting Officer's Representative (COR) at 505-786-6168 for questions or discussions regarding technical matters relative to the services required.
Attachments:
Samples of Play Equipment Suggested Play Equipment Layout
Prepared by Barbara Hanson, Facility Manager, NMNCA
File details come from the government source that posted it. Updated .