Attachment 1 - SOW.pdf

PDF 141 KB Posted

Attached to
LAK TECH TRAINING DORM REPLACEMENT DORM BLINDS
Solicitation number
FA301622U0101
Issued by

View the file

Other files

File Type Posted
RFQ - FA301622U0101.pdf PDF
Attachment 1 - SOW.pdf PDF
Questions Regarding RFQ FA301622U0101.pdf PDF
RFQ - FA301622U0101.pdf PDF
RFQ - FA301622U0101.pdf PDF
RFQ - FA301622U0101.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

FOR

Tech Trng Dormitories 10251/10261/10265/10255/10650/10802/10806

JBSA LAFB, TX.

7 Apr 2022

STATEMENT OF WORK

Tech Training Blinds Project

1 DESCRIPTION OF WORK

Work to be done: The work to be performed under this contract and in accordance with these contract documents shall consist of furnishing all necessary plant, labor and materials; and constructing, installing and performing all work shown and described in the contract documents, all of which are made a part thereof.

Character of Work and Mechanics: The work shall be executed in the best and most workmanlike manner by qualified, careful, and efficient mechanics skilled in the trade.

The work shall be in strict accordance with the contract documents and standards of the industry. Only certified journeymen in respective trades, or apprentices under the direct supervision of certified journeymen, will be permitted to work within areas of projects.

Project Location: TT dormitories: 10251/10261/10265/10255/10802/10806/10650

2 PRINCIPAL FEATURES

Work shall be done with unoccupied areas. The contractor shall coordinate all work with the occupants, the Project Manager/Inspector, the Contracting Officer Representative.

Description of Work:

Remove and dispose of all existing blinds, from the following TT dormitories, 10251/10261/10265/10255 (132 blinds are to be removed from both Bldgs 10251 & 10255, 120 blinds are to be removed from both Bldgs 10261 & 10265). Removed coverings are to be taken from the JBSA Lackland property and disposed of by the contractor off-base (contractor may provide their own dumpster for disposal).

Contractor will install blinds as follows:

Bldgs 10251 & 10255 - 1350 Scott Drive 78236: 139 total for each Bldg. 132 installed, 7 attic stock (provided to end user) sized as 49”W x 49”L Bldgs 10251 & 10255: Two (2) story motel style bldg. (meaning rooms open to the exterior of the bldg), with 132 total rooms/66 rooms per floor. Stairwells at each end and in the middle of the bldg.

Bldgs 10261 & 10265 - 1350 Scott Drive 78236: 127 total for each Bldg. 120 installed, 7 attic stock (provided to end user) sized as 49”W x 49”L Bldgs 10261 and 10265: Two (2) story motel style bldg. (meaning rooms open to the exterior of the bldg), with 120 total rooms/60 rooms per floor. Stairwells at each end and in the middle of the bldg.

Bldgs 10802 & 10806 - 950 Femoyer St. 78236: 88 total for each Bldg. 84 installed, 4 attic stock (provided to end user) sized as 38.75” W x 71”L Bldgs 10802 & 10806 are three (3) stories and have 84 rooms each with 28 rooms per floor. One center stairwell, no elevators. The fire escapes CANNOT be utilized for access.

LAUREN MACIAS

How many blind are being removed??? Do we know how many for each bldg

HERING, ANDREW J GS-11 USAF AETC 37 TRSS/DOR-X

Same number of blinds installed are the same number to be removed.

LAUREN MACIAS

IS CTR ALLOWED TO PROVIDE THEIR OWN DUMPSTER

LETS SAY SOMETHING THAT THEY ARE TO REMOVE AND DISPOSE OFF BASE

HERING, ANDREW J GS-11 USAF AETC 37 TRSS/DOR-X

Yes, they can provide their own dumpster

LAUREN MACIAS

PROVIDE SOME INFO ON THE BLDGS—STAIRS, WHAT FLOORS, HOW MANY BLINDS ARE ON EACH FLOOR

Bldg 10650 - 1250 Femoyer St. 78236: 88 total for each Bldg. 84 installed, 4 attic stock (provided to end user) - sized 38.75”W x 71”L Bldg 10650 is three (3) stories and have 84 rooms each with 28 rooms per floor. One center stairwell, no elevators. The fire escapes CANNOT be utilized for access.

NOTE: All window sizes will be verified by contractor prior to ordering.

Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage of materials shall be coordinated with the CE Point of Contact.

3 WORK HOURS AND SPECIAL CONDITIONS

Work hours shall be 7:30 a.m. to 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the option of the government and with approval of the CE Point of Contact, work may be permitted on Federal holidays, weekends or after 4:30 p.m. daily at no additional cost to the government. The following legal holidays are observed:

New Year’s Day, January 1st Dr Martin Luther King, Jr. Day, 3rd Monday in January Washington’s Day, 3rd Monday in February Memorial Day, Last Monday in May Independence Day, July 4th Labor Day, 1st Monday in September Columbus Day, 2nd Monday in October Veterans Day, November 11th Thanksgiving Day, 4th Thursday in November Christmas Day, December 25th

Note: When any of the above holidays falls on a Saturday, the preceding Friday will be observed as the legal holiday; holidays falling on a Sunday will be observed on the following Monday.

The contractor shall provide written notice to the CE point of contact for approval at least three duty days before starting the scheduled work.

4 SITE MAINTENANCE AND CLEANUP

Site Maintenance: The contractor shall maintain work areas in a neat, clean, and safe condition.

The Contractor shall take all necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government.

LORENZO MARTINEZ

For the number of blinds needing to be purchased, is it the installed amount (IA) plus the attic stock (AS) making it the following amounts:

132(IA) + 7(AS) = 139 per bldg for 10251 & 10255.

120(IA) + 7(AS) = 127 per bldg for 10261 & 10265.

84(IA) + 4(AS) = 88 per bldg for 10802 & 10806.

84(IA) + 4(AS) = 88 per bldg for 10650.

HERING, ANDREW J GS-11 USAF AETC 37 TRSS/DOR-X

Yes for the amounts

Cleanup: The contractor shall collect all trash, debris, refuse, garbage, etc., which is generated and place it in appropriate containers with lids or approved covers daily.

Disposal shall be outside the limits of government property.

Bldg 10650 - 1250 Femoyer St. 78236: 88 total for each Bldg. 84 installed, 4 attic stock (provided to end user) - sized 38.75”W x 71”L
Bldg 10650 is three (3) stories and have 84 rooms each with 28 rooms per floor. One center stairwell, no elevators. The fire escapes CANNOT be utilized for access.
NOTE: All window sizes will be verified by contractor prior to ordering.

File details come from the government source that posted it. Updated .