Attachment 1_SOW.pdf
PDF 217 KB Posted
- Solicitation number
- 70Z0G821QQNF74700
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 9_Questions and Answers.pdf | ||
| Attachment 7_Picture 5.pdf | ||
| RFQ 70Z0G821QQNF74700 Schedule.pdf | ||
| Attachment 3_Picture 1.pdf | ||
| Attachment 2_Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 6_Picture 4.pdf | ||
| Attachment 5_Picture 3.pdf | ||
| Attachment 8_Picture 6.pdf | ||
| RFQ 70Z0G821QQNF74700.pdf | ||
| Attachment 4_Picture 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Training Center Cape May Skate Park Foundation Repair
Statement of Work (SOW)
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment as required to repair the existing skate park foundation cracking and application of acrylic surface paint over the entire surface. The objective of this service is to reestablish a safe surface free of any obstructions for the skate park located at U.S.
Coast Guard Training Center Cape May, 1 Munro Avenue, Cape May, NJ, 08204.
2. BACKGROUND: Training Center Cape May’s housing skate park foundation was originally an asphalt court used for basketball/tennis. In 2012 the court was repurposed as a skate park and concrete ramps/obstacles were placed throughout the court and the surface was repainted. Over the course of time, the foundation has shifted due to environmental exposure creating cracks and divots throughout the foundation and ultimately creating potential hazards to patrons.
3. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the Contractor shall commence work NLT fifteen (15) days after notice to proceed and work diligently to complete the entire work ready for use by thirty (30) working days after contract award.
4. PLACE OF PERFORMANCE: This contract will be performed at the Coast Guard housing Skate Park located immediately outside the TRACEN Cape May front gate at the end of Pennsylvania Ave.
5. SCOPE OF WORK:
The contractor shall provide certified technicians to perform the removal of debris in foundation cracking, fill all cracking with acrylic/mortar mix and apply multiple coats of acrylic coating over the entire court (Foundation measures approximately 70’ X 100’).
This will include all labor, materials, equipment, and tools to perform the requested tasks. The technician shall be familiar with the equipment and the acrylic systems involved in filling and coating the current foundation deformities. During the repair, the technician will only perform the work necessary to clean the entire surface/cracks, fill all deformities and apply multiple layers of acrylic coating to the entire surface.
6. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit on Monday, July 26, 2021 or Wednesday, July 28, 2021 from
9:00 a.m. – 3:00 p.m. EDT (Eastern Day Time) with MK1 Robert Delarosa at
609-898-6774 or by email at Roberto.N.Delarosa@uscg.mil or with LT Charles
Shaffer at 609-898-6968 or by email at Charles.D.Shaffer@uscg.mil.
mailto:Roberto.N.Delarosa@uscg.mil mailto:Charles.D.Shaffer@uscg.mil
7. DESIGNATED CONTRACTING OFFICER’S POINT OF CONTACT
(POC): The designated Contracting Officer’s POC for this project is MK1 Robert
Delarosa, phone: 609-898-6774, email Roberto.N.Delarosa@uscg.mil. Inquiries concerning any phase of the specification before or after award shall be made to
MK1 Robert Delarosa.
8. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The
Government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specifications or related documents.
9. ORAL MODIFICATION: No oral statement of any person other than the
Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
10. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
11. WORK OUTSIDE REGULAR HOURS: If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer for approval consideration. The Contractor shall allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress.
12. SECURITY REQUIREMENTS: All contractor personnel must have a valid driver’s license when entering the base. Upon access, all personnel must acquire a guest pass from the security office. This pass is only valid for 01 days.