Attachment 1 SOW.pdf
PDF 146 KB Posted
- Attached to
- Repair CAT 996G Loader, Front Differential
- Solicitation number
- FA462021QA224
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA462021QA224.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA462021QA224
Attachment 1 SOW
Statement of work Cat 966G Loader, Front Differential Repair
Fairchild AFB, WA
06 MAY 2021
FA462021QA224
Attachment 1 SOW
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment, parts materials and labor necessary to diagnose and repair the front differential, and all work must be done in accordance with federal, state, and local laws and regulations.
2. INSTALLATION.
2.1. The contractor shall propose a list of materials used in the vehicle repairs for approval by the government.
2.1.1. The contractor shall diagnose the differential and replace all worn and broken components within the differential.
2.1.2. The contractor shall use new OEM parts for differential repair.
2.1.3. The contractor shall return the differential to 100% OEM serviceability standards.
3.1. PHYSICAL ACCEPTANCE. Physical acceptance will be performed by 336 TRSS Vehicle Maintenance personnel to ensure work was done in accordance with common maintenance practices and there are no safety hazards due to incorrect installation.
4. TRANSPORTATION. The government will provide delivery of the differential to the contractor’s site no further than a 175 mile radius from Fairchild AFB, on a schedule mutually agreed to by the contractor and the government.
5. GENERAL INFORMATION.
5.1. QUALITY CONTROL. Contractor shall develop and maintain an in-house quality control program (QCP) to ensure work meets the requirements listed in this statement of work.
5.4. PERFORMANCE PERIOD. The performance period for this work extends 90 days from contract award. This includes time necessary for the contractor to order required parts and equipment and complete installation.
5.6. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE SERVICES DURING
CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS
COMBATANT COMMANDER. This service does not meet the criteria for continuation of performance during a crisis and is NOT mission essential.
6.1. PRODUCTS AND MATERIALS. If it is determined that if a product does not meet government performance requirements, the contractor shall submit a proposed alternative that would meet the performance requirements with the lowest environmental impact for evaluation and acceptance. Products that fall under the Environmental Protection Agency (EPA) Comprehensive Procurement Guidelines (CPG) (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) Shall meet the minimum recovered (recycled) content. Bio-based products shall meet the requirements of the bio-based product listing from the United States Department of Agriculture (USDA) (http://www.biopreferred.gov/). Before implementing any change that results from amendments to these listed publications that will result in a change to the contract price, the contractor shall submit to the Contracting Officer a price proposal within 30 calendar days following receipt of the change. An equitable adjustment (increase or decrease) shall be negotiated. No changes shall be made without prior approval from the Contracting Officer.
http://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program) http://www.biopreferred.gov/)
| 2. INSTALLATION. |
| 5. GENERAL INFORMATION. |
File details come from the government source that posted it. Updated .