Attachment_1_SOW.docx

DOCX document 21 KB Posted

Attached to
Bannock Pumping Plant Transformer for Fort Hall Ir
Solicitation number
140A1225Q0015
Issued by

About this file

This document is a Statement of Work (SOW) for the Bannock Pumping Plant Transformer Procurement Project. The Bureau of Indian Affairs (BIA) is seeking to procure one 12.47-480/277V Distribution Transformer, 2.5 MVA, for the Fort Hall Irrigation Project located approximately 11 miles southwest of Pocatello, Idaho, on the Fort Hall Reservation. The transformer will be used for step-down purposes at the Bannock Pump Station and must be designed, constructed, and tested in accordance with IEEE, ANSI, and NEMA standards.

The contractor will be responsible for furnishing and delivering the transformer F.O.B. to the jobsite, with a guarantee that the equipment is free of defects in workmanship and materials and capable of continuous, satisfactory performance. The specific project location is adjacent to 1300 Schiller Road in Pocatello, Idaho, with precise coordinates provided. The solicitation number is 140A1225Q0015, and the procurement is being managed by the Department of the Interior Bureau of Indian Affairs Central Office.

View the file

Other files

File Type Posted
Attachment_3_Wage_Determination.pdf PDF
Attachment_2_Specifications.docx DOCX document
Sol_140A1225Q0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bannock Pumping Plant Rehabilitation Project Transformer Procurement Statement of Work

1. BACKGROUND

The Bureau of Indian Affairs (BIA) is proposing to modernize the Bannock Pumping Plant (BPP). The BPP is in the Michaud Unit of the Fort Hall Irrigation Project (FHIP), approximately 11 miles southwest of Pocatello, Idaho, on the Fort Hall Reservation. Water supplied to the Michaud Unit is obtained from surface water sources and supplemented with groundwater. The Portneuf Pumping Plant is the main supply to the Michaud Unit and conveys surface water from the Portneuf River to the BPP.

2. SCOPE OF WORK

This Statement of Work entails the procurement to furnish and deliver F.O.B. to jobsite, one (1) 12.47-480/277V Distribution Transformer, 2.5 MVA to be used for step-down purposes, and accessories as described in Part 1.6.B. and Part 2 of the attached specifications.

3. GUARANTY

Contractor shall guarantee to the Government that the complete distribution transformer, together with all parts included in the original purchase, is free of defect in workmanship and materials and is capable of continuous and satisfactory performance when operated in accordance with the instructions provided by the Contractor at the specified rating and capacity.

4. PROJECT LOCATION

Fort Hall Indian Irrigation Project - Bannock Pump Station, adjacent to 1300 Schiller Road, #7, Pocatello, ID 83243 Latitude. Longitude: (42.836998, -112.644868)

5. SPECIFICATION STANDARDS

The transformer shall be designed, constructed, and tested in accordance with the latest revision of the applicable IEEE, ANSI, and NEMA standards, except where specific requirements of these specifications conflict with these standards. In such cases, these specifications shall take precedence.

It is assumed that the equipment provided by the manufacturer will be in strict compliance with these specifications unless specific exception is taken and an explanation provided.

It is imperative to review and understand the attached Distribution Transformer Specifications. Submissions will be expected to include all components identified within provided specifications.