Attachment 1 - SOW Clear Lake Sewage Pumping.pdf
PDF 963 KB Posted
- Attached to
- CLEAR LAKE SEWAGE PUMPING Federal contract opportunity
- Solicitation number
- FA462021QA105
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA462021QA105 - COMBO.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| Attachment 2 - Pricing Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
Clear Lake Sewage Pumping
FAIRCHILD AFB, WA
23 Mar 2021
1. DESCRIPTION OF WORK. The contractor shall provide sewage pumping and removal services at
Fairchild AFB Clear Lake Resort. All service must comply with federal, state, and county rules and regulations to ensure environmentally compliant handling and proper disposal of the contents of the above ground sewage tanks at Clear Lake.
1.1. STORAGE TANKS. There are two 5,000 gallon tanks that are connected by a “Y” valve located at
Clear Lake Resort (See Appendix B). Both tanks must be pumped during every service.
1.2. FINANCIALS. The contractor is responsible for providing a monthly invoice to Clear Lake Resort that, at a minimum, includes total gallons of sewage pumped, cost per gallon, per CLIN, and total amount invoiced as well as all service charge associated with the contractor’s service.
2.0. CLEANLINESS. The contractor is required to leave the work area around the tanks in a neat and orderly condition. The contractor is responsible for cleaning up any spillage and notifying Clear Lake management immediately.”
3. GOVERNMENT-FURNISHED SERVICES. None.
4. GENERAL INFORMATION.
4.1. QUALITY CONTROL. The contractor shall utilize their own internal Quality Control (QC) processes to ensure the government receives a quality product that meets all requirements of this SOW, prior to acceptance.
4.2. QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance in accordance with this Statement of Work.
4.3. HOURS OF OPERATION. Sewage pumping will normally be scheduled on every Monday and
Friday but the contractor must be able to respond within 24 hours if emergency service is required. In addition, during the peak facility usage the contractor may be required to provide service on a more frequent basis. As noted above, the contractor will have a minimum of 24 hour notice if unscheduled service is required and shall be coordinated with the government POC. Normal operating hours are 7:30
AM – 4:30 PM, excluding Federal holidays. If the contractor wants to work other than normal operating hours, approval from the Contracting Officer must be obtained via a written request (email is acceptable) submitted at least two days prior to the date the work is to occur. The following Federal Holidays are observed:
January 1 New Year’s Day
3rd Monday in January Martin Luther King, Jr. Day
3rd Monday in February President’s Day
Last Monday in May Memorial Day
July 4 Independence Day
1st Monday in September Labor Day
2nd Monday in October Columbus Day
November 11 Veterans Day
4th Thursday in November Thanksgiving Day
December 25 Christmas Day
4.4. ACCESS. The contractor will be provided a code to access the facility if after hour access is required.
4.5. PARKING: Contractor personnel shall not park in designated Reserved Parking spaces.
4.6. REGULATORY COMPLIANCE: The contractor and subcontractors shall comply with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the contractor shall use environmentally safe products in the course of completion of their work. The contractor shall maintain, on site, Safety Data Sheets (SDS) for all chemicals used, if applicable. A copy of all SDS shall be provided to the government POC and the SDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the government facility. The contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the government facility. If the
Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the contractor shall immediately notify the CO/Government POC and appropriate emergency responders. The contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.
4.7 CONTINUATION OF MISSION ESSENTIAL FUNCTIONS. IAW DoDI 1100.22, Policy and
Procedures for Determining Workforce Mix, and any applicable Air Force regulation/supplement, unless otherwise directed by an authorized government representative, it is determined that this requirement is determined NOT mission essential during a crisis.
4.8. DISPOSAL CHARGES. In the event the contractor incurs additional or increased dumping charges, at the municipal dumping site, the contractor will be allowed to request an equitable adjustment in the unit price per gallon on this contract. The contractor shall provide all necessary documentation detailing the change in the incurred rate. The government shall review the documentation and determine the acceptability of any and all increases.
5. ORDERING PERIOD
Ordering periods will be used to determine the per-gallon price on subsequent Task Order issued by the government to purchase services against this contract. The following is the projected ordering period break down.
Ordering Period 1 - 1 May 2021 – 30 Apr 2022
Ordering Period 2 - 1 May 2022 – 30 Apr 2023
Ordering Period 3 - 1 May 2023 – 30 Apr 2024
Ordering Period 4 - 1 May 2024 – 30 Apr 2025
Ordering Period 5 - 1 May 2025 – 30 Apr 2026
The overall performance period shall be between the period of 1 May 2021 and 30 Apr 2026.
Appendix A Workload
The government estimates approximately 88,888.88 gallons of sewage may be pumped annually.
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
CLEAR LAKE
S A
N
S A
N
S A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S CLEAR LAKE ROAD
SAN
SAN
SAN
SAN
SAN
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W
W W
W
E E E E E E E E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S A
N
S
A
N
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
23952400
2350 2345
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S A
N
EXIST. SAN LIFT STATION
SUMP
VALVE
VAULT
EXIST. RV PAD
EXIST. SEPTIC TANKS
E X
IS
T
. P R
E S
S U
R E
S E
W E
R
EXIST. MAN GATE
EXIST. GATE
KEY PAD
EXIST. BOAT STORAGE
BUILDING
EX
IS
T.
A
SP
HA
LT
D
RI
VE
W
AY
10' MIN.
EXIST. R.O.W.
EXIST. PROPERTY LINE
M
I
N
SHORE LINE
EXIST. OVERHEAD POWER
(RETAIN & PROTECT)
7 8
P R
O J E
C T
N
U M
B E
R
P R
O J E
C
A M
E
S H
E E
T
N
A M
E
Sheet reference number
Sheet of
D E
P A
R T
M E
O
F
T
H
I R
F
R
C E
A I
M
B
I L
I T
Y
C
O M
M A
N D d
C
I V
I L
E
N G
I N
E E
R
S
Q
C E
N M
E
F A
I R
C H
I L D
F
B
W
A
D e s i g n e d b y
D w n b y
C h k b y
P l o t
S c a l e
F i l e a m e
D a t e
D r a w i n g
N u m b e r
D e s c r i p t i o n
S y m b o l A p p r o v e d D a t e
S y m b o l D e s c r i p t i o n A p p r o v e d D a t e
12345678
Z:\2019 Govt Projects\19-688.2 Clear Lake Holding Tank\DESIGN\DWG\CIVIL\Production Drawings\SITE PLAN - CLEAR LAKE (30 SCALE).dwg
P l o t
D a t e
P
M
S I T
E
P
L A
N
C
L E
K
S
C A
L E
D
W G
C1
1 3
C A
P
C O
N S
T R
U C
T
R
V
S
E W
A G
E
H
O L D
I N
G
T
A N
K
P
L A
N
C L E
K E
W
A S
H I N
G T
O N
S I T
E
P
L A
N
M J V
D W
J
M J V
FAIRCHILD AIR FORCE BASE
DAVID KOVALCHUK, CONTRACT SPECIALIST
110 W ENT ST. STE. #200
FAIRCHILD AFB, WA
509-247-4869
DAVID.KOVALCHUK@US.AF.MIL
REFERENCE NOTES:
SAW-CUT EXISTING SEWER PIPE CONNECTIONS AND REMOVE EXISTING MANHOLE. REPLACE WITH PROPOSED
DUPLEX PUMP LIFT STATION. SEE LIFT STATION DESIGN, SHEET 3. SET LIFT STATION TANK, PUMPS AND
CONTROLS PER DESIGN DETAIL AND MANUFACTURER’S SPECIFICATIONS. CONNECT 8" DIA. SDR35 TO EXISTING
INFLOW AND OUTFLOW PIPES AND EXTEND INTO LIFT STATION TANK.
(1) 8" GATE VALVE INSTALLED ON EXISTING GRAVITY OUTFLOW PIPE, CAST IRON VALVE BOX.
540 LF OF 3” DIA. PRESSURE SEWER PIPE. 36” MIN. BURY DEPTH. SEE SANITARY SEWER NOTES #1 AND 2, THIS
SHEET FOR PIPE MATERIAL AND CONNECTIONS.
RETAIN AND PROTECT EXISTING PRESSURE SEWER LINE AT CROSSING.
(1) 3”X4” 45° ELBOW
(1) 4” TEE
(2) 4” GATE VALVES WITH CAST IRON VALVE BOX
(2) 4” 90° ELBOW
THRUST BLOCKING
(2) 5,000 GALLON SINGLE COMPARTMENT CONCRETE HOLDING TANKS. WILBERT PRECAST PRODUCT #916-5S
WITH PERMANENTLY SEALED OUTLET. SEE MANUFACTURER'S DETAIL AND HOLDING TANK SECTION DETAIL, SHEET 3.
CONSTRUCT A 6 INCH CONCRETE CURB, DOWELED TO PERIMETER OF TANKS FOR SPILL PREVENTION DURING
SEWAGE PUMPING. SEE DETAIL SHEET 3.
CONSTRUCT A 6 FOOT TALL CEDAR FENCE AROUND THE PERIMETER OF THE TANKS WITH SERVICE ACCESS
GATE. STAIN TO MATCH EXISTING WOOD STRUCTURES.
EACH TANK SHALL BE EQUIPPED WITH A MONITORING SYSTEM WITH BOTH AUDIBLE AND LIGHTED ALARMS TO
WARN OF OVERFLOW CONDITIONS. ALARM SYSTEM SHALL BE CAPABLE OF SHUTTING OFF LIFT STATION PUMPS.
SEE SHEET 3 FOR ALARM FLOAT ELEVATIONS.
CONNECT TO 200 AMP ELECTRICAL PANEL AT BOAT STORAGE BUILDING FOR HOLDING TANK AND
LIFT STATION ELECTRICAL NEEDS. SEWER FORCE MAIN AND ELECTRICAL LINES MAY BE LAID IN JOINT
TRENCH. PROVIDE ELECTRICAL SUBMETER FOR LIFT STATION. SEE ELECTRICAL PLANS, BY OTHERS.
4" THICK CONCRETE PAD FOR ELECTRICAL PANELS. INSTALL PROTECTIVE BOLLARDS AND PROVIDE 3 FT MIN.
CLEAR SPACE IN FRONT OF PANELS. SEE ELECTRICAL PLANS, SEPARATE COVER FOR DIMENSIONS.
CONTACT INFORMATION
VICINITY MAP
I
S
C L E
K
W
S
L
N
A
V
PROJECT
SITE
VERDIS-TAKISAKI
COLIN MEEHAN P.E., PROJECT MANAGER
MERLE VAN HOUTEN P.E., LEED A.P., LEAD ENGINEER
601E FRONT ST. #205
COEUR D’ALENE, ID 83814
208-667-1214
CMEEHAN@VERDISNW.COM
MVANHOUTEN@VERDISNW.COM
CLEAR
LAKE
WAC
246-272B-05000
INSTALLER QUALIFICATIONS AND RESPONSIBILITIES.
THE INSTALLER SHALL:
(1) MAINTAIN A COPY OF APPROVED PLANS AND
SPECIFICATIONS ON-SITE DURING CONSTRUCTION;
(2) FOLLOW THE APPROVED PLANS AND
SPECIFICATIONS OR OBTAIN APPROVAL FROM THE
DESIGN ENGINEER PRIOR TO MAKING FIELD
CHANGES;
(3) INSTALL SEWAGE TANKS APPROVED BY THE
DEPARTMENT ACCORDING TO THE PROVISIONS OF
CHAPTER 246- 272C WAC, ON-SITE SEWAGE SYSTEM
TANKS;
(4) BE ON THE SITE AT ALL TIMES DURING THE
EXCAVATION AND CONSTRUCTION OF THE LOSS;
(5) BACKFILL AND GRADE THE SITE AFTER
CONSTRUCTION TO PREVENT SURFACE WATER
FROM ACCUMULATING OVER ANY LOSS COMPONENT.
246-272B-05100
CONSTRUCTION OVERSIGHT AND TESTING.
THE DESIGN ENGINEER OR THE ENGINEER'S AUTHORIZED
REPRESENTATIVE SHALL:
(1) CONDUCT INSPECTIONS TO:
(a) VERIFY LOSS CONSTRUCTION AND MATERIALS
CONFORM WITH APPROVED PLANS AND
SPECIFICATIONS; AND
(b) COLLECT DATA FOR THE RECORD DRAWINGS.
(2) CONDUCT OR WITNESS LOSS COMPONENT TESTING
TO VERIFY THAT ALL RESULTS FALL WITHIN
ACCEPTABLE LIMITS:
(a) WATER TIGHTNESS TESTING OF ALL TANKS UNDER
WAC 246-272B-05200; AND
(b) PRESSURE TESTING OF ALL NEW COLLECTION AND
CONVEYANCE PIPING ACCORDING TO SECTION
7-09.3 (23) OF THE LATEST EDITION OF WSDOT'S
STANDARD SPECIFICATIONS FOR ROAD BRIDGE AND
MUNICIPAL CONSTRUCTION, PIPE INSTALLATION FOR
WATER MAINS - HYDROSTATIC PRESSURE TEST.
(3) RECORD BASELINE PRESSURE AND FLOW
INFORMATION AND PROVIDE PASSING RESULTS
TO THE DEPARTMENT DURING THE FINAL
INSPECTION.
246-272B-05300
DEPARTMENT FINAL INSPECTION.
THE DEPARTMENT OF HEALTH SHALL CONDUCT A FINAL
INSPECTION.
SANITARY SEWER NOTES:
1. SEWER PRESSURE PIPE MATERIAL SHALL BE WATER CLASS
RATED DR11 (200 PSI) HDPE OR SCH 80 PVC.
2. IN ORDER TO AVOID SHEARING FORCE MAIN PIPES BECAUSE
OF DIFFERENTIAL SETTLEMENT, FLEX COUPLINGS OR PRESS
SEAL BOOTS SHOULD BE USED ON FORCE MAIN PIPES WHEN
CONNECTING TO PUMP STATION AND HOLDING TANK
STRUCTURES.
3. SEWER MAIN DEFLECTION SHALL NOT EXCEED THE MAXIMUM
ALLOWABLE PIPE JOINT DEFLECTION OR MINIMUM BENDING
RADIUS PER PIPE MANUFACTURER'S RECOMMENDATIONS.
AVOID AXIAL DEFLECTION AT JOINTS.
4. ALL WATER MAINS SHALL BE SEPARATED AT LEAST TEN FEET
HORIZONTALLY FROM SANITARY OR STORM SEWER SYSTEMS
(OUTSIDE TO OUTSIDE OF PIPE). CROSSING OF WATER
MAINS AND SEWER SYSTEMS SHALL HAVE A MINIMUM 18-INCH
VERTICAL SEPARATION. BOTH WATER AND SEWER MAINS
SHALL HAVE FULL, UNCUT LENGTHS OF PIPE CENTERED AT
THE CROSSING. ANY ANTICIPATED SEPARATION DIFFERING
FROM THE MINIMUM STANDARDS CONTAINED HEREIN, SHALL
BE APPROVED BY THE ENGINEER AND MUST CONFORM TO
THE WA DOH PIPELINE SEPARATION DESIGN AND
INSTALLATION REFERENCE GUIDE. UNDER NO
CIRCUMSTANCES SHALL SEWAGE FORCE MAINS HAVE LESS
THAN 18" OF VERTICAL SEPARATION AT WATER MAIN
CROSSINGS
5. WHEN THE WATER MAIN CROSSES UNDER THE SEWER MAIN
EITHER THE SEWER OR WATER LINE OR BOTH MUST BE
ENCASED WITH A SLEEVING MATERIAL ACCEPTABLE TO DOH
FOR A HORIZONTAL DISTANCE OF 10 FEET ON BOTH SIDES OF
THE CROSSING AND THE SEWER MAIN MUST ALSO BE
SUPPORTED ABOVE THE CROSSING TO PREVENT SETTLING.
6. CONTRACTOR SHALL CONFORM TO ALL HORIZONTAL
SETBACK REQUIREMENTS LISTED IN WAC 246-2728-06050.
7. ALL SURFACE FEATURES OF THE WATER AND SEWER
SYSTEMS (VALVE LIDS, MANHOLE LIDS, VAULTS, ETC.) TO BE
CLEARLY MARKED "WATER" OR "SEWER".
8. ALL VALVES, VAULTS, MANHOLES, METER BOXES, ETC. WHICH
ARE LOCATED WITHIN PAVED AREAS SHALL BE CAPABLE OF
HS-20 VEHICLE LOADING.
9. LAY PIPE AT UNIFORM GRADE TO AVOID HIGH/LOW POINTS.
10.TOPOGRAPHY AND UTILITIES TAKEN FROM GEOBASE DATA
PROVIDED BY FAIRCHILD AIR FORCE BASE. VERDIS - TAKISAKI
TAKES NO RESPONSIBILITY FOR UNFORESEEN OR UNKNOWN
SUBSURFACE CONDITIONS WHICH MAY BE DISCOVERED
DURING CONSTRUCTION.
11. ANY SUBSTITUTIONS MUST BE APPROVED BY THE DESIGN
ENGINEER.
12. ALL PREFABRICATED TANKS MUST MEET THE REQUIREMENTS
OF CHAPTER 246-272C WAC.
13.THE SYSTEM INSTALLER SHALL BE CURRENTLY CERTIFIED BY
THE LOCAL HEATH JURISDICTION TO PERFORM THE WORK.
14.THE ENGINEER WILL BE PRESENT TO INSPECT INSTALLATION
IN DIFFICULT OR UNANTICIPATED CONDITIONS AND ALSO
INSPECT THE PLACEMENT OF FILL MATERIAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE
ENGINEER 48 HOURS PRIOR TO INSPECTION.
15. ALL WORK SHALL CONFORM TO WAC 246-272B INCLUDING THE
FOLLOWING:
SHEET INDEX
SITE PLAN..................................C1
SEWER PLAN & PROFILE........C2
DETAILS.....................................C3
Know what's below.
Call before you dig.
R E
V I S
I O
P
H
R E
V I S
I O
P
H
Tanks located here
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text W
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text J.
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text E
1536539138A Highlight