This Statement of Work (SOW) details a mold remediation project for Building 1351 at Travis Air Force Base, California. The contractor will be responsible for comprehensive demolition, abatement, and disposal of mold-contaminated materials including approximately 420 square yards of flooring, drywall, wood back wall, and damaged pipe duct insulation. The scope of work includes creating a negative pressure enclosure, HEPA vacuuming, applying anti-microbial solutions, replacing insulation, drywall, and wood back wall, and repainting with Sherwin Williams PROMAR 200 Zero VOC paint.
Key requirements include performing air sample testing before and after remediation, complying with all federal, state, and local environmental and safety regulations, and completing the project within 90 days of notice to proceed. The contractor must provide all labor, equipment, and materials, ensure proper waste disposal, and coordinate work with base personnel. The project involves carefully controlled work during normal business hours (0730-1630, Monday-Friday), with specific protocols for handling potential hazardous materials and maintaining minimal disruption to building occupants.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
February 10, 2025
Scope of Work
MOLD REMEDIATION BLDG # 1351
1 .SCOPE: Supply all material, equipment, and labor necessary to perform all operations in strict accordance with these specifications in this SOW. The contractor is responsible for all required measurements during the site visit, and those measurement will be used. The contractor will not use the approximate measurement that is provided by the government for pricing purposes. drawings will be provided if necessary.
1.1 normal hours of operations shall be from 0730 to 1630, Monday – Friday, to exclude all federal holidays. All other dates and/or times must be approved by the government. Clean up shall be done daily within these hours, e.g. pick up scraps, vacuum as needed.
2. LOCATION: All work on this project is to be performed at Travis Air Force Base, CA.
3. DESCRIPTION OF WORK: The following outline of the principle features of work does not in any way limit the responsibility of the contractor to perform all work and furnish all materials to do a complete job within the intent and scope of the specifications, sketches, drawings and contract.
General construction consists of the following items:
3.1. Contractor shall be responsible for demolition, abatement and disposal of existing drywall materials, flooring, furniture, appliances, doors and any other item that is contaminated by mold. The contractor will isolate work areas above abatement areas using critical barriers to create a negative pressure enclosure. Contractor will remove approximately 420 SY of flooring and drywall, wood back wall, with visible signs of microbial growth and water damage. Remove damaged pipe duct insulation.
Clean wall cavities. HEPA Vacuum and wet wipe containment – apply anti-microbial solution. The contractor will provide all labor, equipment and materials to replace insulation, drywall and wood back wall, texture, prime, and paint (Sherwin Williams 8646, PROMAR 200, ZERO VOC., EG SHELL.)
the contractor will replace interior and exterior doors and cabinets if they are unable to be cleaned.
Items such as beds, dressers, refrigerators and ceiling fans will not be replaced after disposal. Flooring and cove base will be replaced with a suitable substitute that matches the existing flooring. Bathroom floor tiles will be cleaned and not removed. The contractor shall perform an air sample testing prior to the removal of containment and provide a final clearance test after work is completed. Contractor will coordinate all work with POC's listed below. Work will be accomplished by approved mold workers.
3.2 COMPLIANCE: The contractor has sole responsibility for compliance with all applicable federal, state, and local requirements regarding the health and safety of its employees.
3.2.1 The contractor has sole responsibility for compliance with all applicable federal, state, and local requirements regarding the health and safety of its employees. These requirements include, but are not limited to, the applicable provisions of the Title Codes of Federal Regulations (CFR), Title Codes of California (CCR), and Bay Area Air Quality Management District (BAAQMD) regulatory guidelines regarding asbestos. Contractor must ensure safe and healthful working conditions for its employees.
The contractor shall comply with all applicable federal, state, and local legal requirements regarding the handling, storage, transportation, and disposal of any hazardous waste. The requirements include, but are not limited to, Code of Federal Regulations (CFR) California Code of Regulations (CCR), and Bay Area Air Quality Management District (BAAQMD).
3.2.2 The contractor shall furnish copies of all permits for the storage, transportation, and disposal of any hazardous waste. The contractor shall complete all shipping manifests for the transportation of hazardous waste and provide these to the Environmental Flight, 60 CES/CEV, for signature prior to removal from Travis Air Force Base.
3.2.3 The contractor shall be responsible for representative sampling, analysis, and management of waste generated during this project, as defined by all governing regulatory agencies such as CAL EPA, OSHA, DOD, AF and the local Bay Area Air Quality Control Board, etc.
3.2.4 Any question regarding whether a particular waste is hazardous or non-hazardous shall be directed to the Contracting Officer. The contractor shall share with the Contracting Officer all of the testing methodology, data, and results of all tests performed for hazardous waste or material. The contractor shall provide this information within two (2) working days of his/her receipt of such data and results.
The provisions of this information to the Contracting Officer shall not be construed or used as a defense to relieve the contractor of his/her responsibilities under any law or regulatory agency’s requirements.
3.2.5 Under no circumstances will the contractor remove from the base any hazardous waste without ensuring complete and full compliance with all existing environmental laws and regulations
3.2.6 Hazardous waste will be placed in secured, properly labeled containers provided by the contractor.
Non-hazardous waste will be placed in other containers provided by the contractor.
3.2.7 If any provision of this section is inconsistent with any applicable laws, regulations, or rules concerning the treatment, storage, or disposal of hazardous or non-hazardous wastes, such laws, regulations, and rules shall control.
3.3 HEALTH AND SAFETY PLAN
3.3.1 If friable asbestos materials with concentrations exceeding the regulatory limit are encountered during the execution of this contract, then the provisions outlined in the following paragraphs will apply. The contractor shall provide for review and acceptance by the Contracting Officer and 60 AMDS/SGPB with a Health and Safety Plan signed by a Certified Industrial Hygienist. No work on area affected by the Health and Safety Plan or its revisions will commence until acceptance of the plan or its revisions by the Contracting Officer. Should the contractor change his/her management procedures for work processes, storage, transporters, or disposal sites, the contractor shall notify the Contracting Officer in a reasonable time to allow the Government to review the changes before the changes are implemented. This notification shall include submission by the contractor or a revised Health and Safety Plan incorporating the changes. A revised Health and Safety Plan shall also be submitted by the contractor at any time during the performance of the contract that a previously unknown hazardous waste or material is encountered.
3.3.2 The Health and Safety Plan shall address, but not be limited to, the health-related standards and protective measures proposed to be utilized by the contractor during work involving exposure to asbestos.
3.3.3 The Health and Safety Plan shall also identify the engineering and work practice controls proposed to be implemented by the contractor. Such controls will be identified to assure the Government that there will be no release to the environment of asbestos for which liability may be imposed on the Government.
3.3.4 Non-Hazardous Waste Disposal: Provide name, address, and phone number of properly permitted sanitary landfill that is to be used for disposal of non-hazardous waste and debris. Such landfill must be operated in compliance with all applicable federal, state, and local legal requirements.
3.3.5 Hazardous Waste Disposal: Provide name, address, and phone number of properly permitted landfill that is to be used for disposal of asbestos waste and debris. Such landfill must be operated in compliance with all applicable federal, state, and local legal requirements.
3.4 MATERIALS
3.4.1 Disposal Bags and Sheeting: Provide 6 mil or thicker plastic disposal bags for mold.
3.4.2 Disposal Bins: Provide disposal bins for collection of non-hazardous waste prior to disposal by the contractor. The contractor shall provide properly labeled disposal bins for collection of hazardous waste prior to disposal by the contractor. All bins shall be secured when not in use to prevent deposit of unauthorized waste and debris.
4. UTILITIES: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed, maintained, and removed at the contractor’s expense and the area returned to the same condition or better at the end of the project.
5. MATERIAL STORAGE AND CLEANUP: The contractor’s materials and equipment shall be neatly stored. Upon completion, the premises shall be left in a neat, clean, unobstructed condition, in perfect order and repair. Contractor storage area and trailer parking shall be coordinated with Maintenance Engineering.
6. WORKING CONDITIONS: The facility and adjacent area(s) will likely be occupied and utilized during the project phase(s). The contractor shall perform work in such a manner as to cause the minimum of interference to the facility and the surrounding area. The contractor shall be responsible for correcting any damage caused by or incidental to, this project. The occupants will remove computers, books and any small items out of the areas to be abated. The contractor shall notify Maintenance Engineering a minimum of five working days to move any equipment and to start the work project. If lifting system or moving of furniture is required for this project, where building occupants are working, the contractor shall work areas or an area that can be completed that day so there is minimal downtime for building occupants.
7. SHIPMENT OF MATERIALS: If any materials are needed to be shipped and stored. The contractor shall be responsible for shipment and storage of all materials until project is completed. Any related costs are to be included in the bid. Delivery and unloading of materials to be used shall be the contractor’s responsibility.
8. PERIOD OF PERFORMANCE: 90 days after notice to proceed is granted