This Statement of Work (SOW) details the requirements for installing an Intrusion Detection System (IDS) and Access Control System (ACS) in Building 1077 at Arnold Air Force Base, Tennessee. The project involves implementing Honeywell Vindicator technology, including 5 IDS access panels, ACS on 11 doors, Balance Magnet Switches on multiple door types, and motion sensors covering all access points and facility perimeters. The system must integrate with the existing security infrastructure at Building 253 and comply with specific security standards (ICD-705, DAFMAN 16-1404-V3, and AFI 31-101).
Key technical requirements include a two-factor authentication system using ID badges/cards and personal identification numbers, remote access capabilities, and LAN/WAN integration. The contractor must be a Vindicator-certified integrator with technicians who are U.S. citizens and have passed a National Agency Check with Inquiries (NACI). The project includes comprehensive testing protocols, a 72-hour nuisance alarm verification period, a 30-day burn-in period, and a minimum 12-month warranty on parts and labor. All equipment must be UL-listed and compatible with the existing security infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg 1077 Security System Upgrades - Sources Sought Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOT SENSITIVE
IRA-24-0282
UNCLASSIFIED
STATEMENT OF WORK (SOW)
FOR BUILDING 1077 7V Test Cell
AEDC/IP
ARNOLD AIR FORCE BASE, TN 37389
6 September 2024
Statement of Work
Introduction:
The work shall take place in Bldg. 1077. The work shall consist of adding Vindicator Intrusion Detection System (IDS) and Access Control System (ACS). All work completed will meet the physical security criteria of ICD-705, DAFMAN 16-1404-V3, and AFI 31-101.
Scope:
The scope of this effort includes all activity and work required to design/install/test and deliver the required IDS and ACS. This includes, but is not limited to: Contractor management; system design; purchase of Commercial Off-the-Shelf (COTS) and ancillary equipment and necessary support infrastructure; system integration of Contractor provided equipment/infrastructure and Government Furnished Property/Equipment (GFP/GFE); Contractor Verification Testing (CVT); Contractor production verification and acceptance testing of Non-Approved equipment (as required); Contractor site support and Contractor support of Government acceptance testing. Interim Contractor Support (ICS) of the installed and integrated system is also included if ordered by the Government.
Intrusion Detection System (IDS) and Access Control System (ACS) Requirements:
5 IDS access panels (Site Commander); ACS shall be installed on 11 doors. IDS Balance Magnet Switches (BMS) will be installed on 8 single man doors, 7 double doors, and 1 large roll up door. IDS BMS will be installed on 3 network access doors. ACS will be installed on 4 single mandoors, 5 double doors (just one door will open), and 1 double door will have ACS both directions. Motion sensors will be installed to have coverage of all access points and perimeter of facility. Access Control system will report to Bldg.
253.
The ACS shall employ the following technologies:
1) Identification (ID) badge or card used in conjunction with the access control device that validates the identity of the person to whom the card is issued.
2) A personal identification number (PIN) that is entered into the keypad by each individual. The PIN must be at least four or more digits.
The ACS shall have remote access capabilities and shall be integrated with LAN/WAN system.
Test and Evaluation:
The Contractor shall prepare for Government review and approval a Test Plan that addresses all testing to be accomplished under this SOW. Each security system shall have a Contractor verification test. Following the completion of the Contractor Verification Testing. The Contractor shall submit to the Government a Test Readiness Letter, certifying that the system is ready for Government Acceptance Testing.
A. A Government Representative will witness initial verification testing.
B. Contractor shall allow a 72-hour period to verify no nuisance/false alarms occur during this period.
C. System closeout will occur after a 30-day burn-in period which starts after the 72-hour nuisance/false alarm period is completed.
Quality Assurance. Equipment and devices shall be compatible and operable with all other system components.
The recommend practices stated in the manufacturer’s literature or documentation shall be considered as mandatory requirements.
All security components shall be compatible, and UL listed for the intended use. Provide materials from one manufacturer, where possible.
Materials and equipment shall be the standard products of manufacturers regularly engaged in the manufacture of those products.
Physical Security. The Contractor shall be responsible for safeguarding all Government property, and controlled forms provided for Contractor’s use. At the end of each work period, all Government facilities, equipment and materials shall be secured by the Contractor.
Warranty:
A. A minimum 12 month warranty on new parts and labor, starting on date of final inspection and closeout of all punch list items after the completion of each system.
B. Warranty shall include transportation to and from Contractor’s repair shop if warranty repairs cannot be accomplished in the field.
C. The Contractor shall provide copies of all warranties for Contractor furnished equipment and materials.
Technical Qualifications:
The system is to be designed, furnished, installed, and tested in accordance with Underwriters Laboratories (UL) Standards for National Industrial Security Systems for the Protection of Classified Material, UL 2050.
The IDS will be Honeywell Vindicator technology, and the installer must be Vindicator certified in order to be compatible with the current monitoring system.
Installed equipment must be on the Air Force approved equipment list as described in the Air Force Security Forces Center, Non-Nuclear IDS Approval Letter dated 02 May 2023 or most recent if superseded. This can be provided if needed.
The contractor shall be a manufacturer certified integrator and/or certified installer of Vindicator security systems. The contractor shall submit a complete list of proposed equipment meeting USAF approval.
All technicians and personnel who will perform work on the security systems shall be U.S. citizens with no arrest or warrants and shall have a National Agency Check with Inquiries (NACI) or higher.