This statement of work outlines requirements for per- and polyfluoroalkyl substances (PFAS) testing of water and soil samples from the Brackish Groundwater National Desalination Research Facility (BGNDRF). The contractor will analyze samples for a suite of at least 16 PFAS compounds using EPA Method 537.1 Mod or 1633. BGNDRF estimates 66 water samples and 15 field blanks per year, with additional optional tests of 48 samples and 16 blanks. The contractor must provide certified personnel, accredited laboratory facilities, and analytical results within 25 business days. Sample types include water from brackish wells, desalination concentrate, and evaporation ponds. The government will obtain and ship samples to the contractor according to provided procedures. The contractor must furnish containers, shipping materials, and custody documentation. Analytical reports and data spreadsheets are due after each test cycle.

View the file

Other files for this federal contract opportunity

Other files attached to BGNDRF PFAS TESTING, newest first.
File Type Posted
Sol_140R4024Q0011_Amd_0001.pdf PDF
Sol_140R4024Q0011.pdf PDF
Attachment_2_-_Price_Schedule_-_BGNDRF_PFAS_Testing.docx DOCX document
Attachment_3_-_Wage_Determination_2015-5443__Rev_24__Revised_7-25-2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BGNDRF WATER AND SOIL ANALYSIS

STATEMENT OF WORK

BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY

PER-AND POLYFLUOROALKYL SUBSTANCES (PFAS) TESTING

1. GENERAL INFORMATION

There are three objectives for the water analysis described in this Statement of Work. The first objective is to give the clients of the Brackish Groundwater National Desalination Research Facility (BGNDRF) thorough information concerning well water for the purposes of designing and configuring pilot scale water treatment technologies and measuring technology performance.

The second objective is to meet reporting requirements under the New Mexico Environment Department (NMED) discharge permit, DP-1472 for concentrate in the BGNDRF evaporation ponds. NMED monitors potential groundwater contaminates discharged at this facility.

The third objective is to allow BGNDRF to monitor the performance of its PFAS removal equipment and research systems.

1.1SCOPE OF WORK. The Contractor will analyze brackish water samples provided by the BGNDRF for a suite of at least 16 compounds using either EPA method 537.1 Mod or 1633. Method of testing direction will be provided by the Contracting Officer’s Representative (COR) when bottles are ordered. The contract will start using 537.1 Mod for three sampling events including one event with both 537.1 Mod and 1633. Once results are available, the COR may request a transition to 1633 if it is determined to be superior for BGNDRF sample analysis. BGNDRF estimates 66 samples per year and 15 field blanks spread over 15 sampling events. Additional optional tests include 48 samples and 16 field blanks spread over 16 sampling events. The Contractor shall provide all personnel, equipment, tools, materials, supervision and other items and services necessary to perform analysis of water and concentrate as described in this Statement of Work. Samples of water will come from a variety of sources including four brackish water wells, desalination concentrate, and evaporation ponds. There may be occasional solids testing as well. The Contractor shall perform to the standards in this contract. Samples will be sent intermittently and will generally include 3-10 samples and 1-3 field blanks per sampling event. Sample frequency will range from weekly to monthly and are dependent upon BGNDRF operations. The minimum set of PFAS analyses and suggested reporting limits are listed in Exhibit 1, however, if more compounds can be provided at a reasonable cost, it could be acceptable. Sample analysis turnround time (TAT) shall be no more than 25 business days.
1.2CONTRACTOR AND LABORATORY STANDARDS
1.2.1Contractor’s employees performing analysis shall have current and valid certifications in the analysis methods required under this contract. Proof of these certifications shall be submitted to the Contracting Officer prior to starting work under this contract.
1.2.2Laboratory shall be accredited in accordance with the most recent National Environmental Laboratory Accreditation Conference (NELAC) standards for water analysis and certified by the state in which it is located. The laboratory shall be in good standing with both, and not be under review or investigation. The Contractor shall be participating in the EPA Quality Assurance Program. The Contractor will submit proof of laboratory certification and applicable QA sample results prior to starting work under this contract.
1.2.3Laboratory shall provide method detection limits and reporting limits for the requested PFAS compounds in Exhibit 1, as well as others that may be part of a larger data set.
2.GOVERNMENT–FURNISHED PROPERTY AND SERVICES
2.1The government will obtain samples of the water from its wells, evaporation ponds, and treatment equipment using containers and procedures provided by the Contractor.
2.1.1Procedures will include minimum well pump run times prior to sampling water from each well.
2.2The government will ship the water samples to the Contractor using the chain of custody protocol and forms provided by the Contractor.
2.3If requested, the government can provide historical data in the form of Excel spreadsheets for past analyses performed on BGNDRF water sources.
3.CONTRACTOR-FURNISHED ITEMS AND SERVICES
3.1The Contractor shall provide clean sample containers (e.g., free of debris and residue, acid-washed, etc.) in double-bagged Ziploc-style plastic bags, PFAS-free water for field blanks (as requested), coolers, and arrange delivery of these containers via courier. Contractor shall also provide chain of custody forms and any other necessary processing documents. The Contractor shall deliver the containers and necessary documents to the Brackish Groundwater National Desalination Research Facility at 500 La Velle Road, Alamogordo, NM 88310 within five days of the scheduled sampling date of required testing, unless other arrangements are made.
3.2The Contractor will provide the COR with instructions regarding how to sample, pack and ship the samples to the Contractor and any time limits that shall be observed between the time of sampling and reception by the Contractor. Instructions will include chain of custody procedures.
4.DELIVERABLES
4.1REPORTS
4.1.1Well water, evaporation pond, and equipment monitoring test results will be reported together in one report.
4.1.1.1Contractor shall provide an electronic report after each test cycle. The electronic data report should be in PDF and include laboratory results along with a Level 2 or better report. Summarize any QC flags and describe any issues related to problems with analyses.
4.1.2.3Contractor shall provide an updated electronic Microsoft excel spreadsheet of water test data after each complete cycle of testing. The spreadsheet shall include a key for QC flags and maintain formatting for QC, omitted analyses, and other items as provided in original spreadsheet.
5.SCHEDULE
5.1NMED Report Samples
5.1.1.If samples are sent for analysis for NMED reports, analyses shall be completed in time for BGNDRF to complete its report. NMED requires a semi-annual report from BGNDRF in accordance with discharge permit DP-1472. In order to meet NMED reporting requirements, the Contractor’s final report from testing of evaporation pond and irrigation concentrate shall be completed by the following dates each year: May 1st and November 1st of each year.
5.2Most sampling events will occur intermittently throughout the year and with advance notice as required by the analytical laboratory.
5.3The standard turnaround time (TAT) shall be no more than 25 business days, with a preference towards 15 business days. The TAT shall be met for each sample set sent to the contractor. The COR and Contracting Officer (CO) shall be notified within three days of receipt of the samples if the TAT will not be met for the submitted samples. Only the CO can permit a temporary change in TAT for submitted samples. A change in TAT can only be granted once per quarter.
5.4Contractor for each test cycle shall coordinate with the COR regarding the sampling date and shipping date for shipping samples to the Contractor’s laboratory. The Contractor shall provide the government sampling containers, sampling protocols, shipping containers, and chain of custody forms within 5 days of scheduled sampling date. Contractor shall arrange and pay for shipping to the BGNDRF Facility and possibly for return shipping. Contractor shall begin analysis of samples within 3 days after receipt of such samples. Upon receipt of samples, the Contractor shall complete analysis and submit required deliverables within 25 business days.

BGNDRF PFAS Testing

Exhibit 1: Minimum Suite of Water Tests

There are thousands of PFAS compounds, and it is recognized that each lab may have its own suite of PFAS chemicals for a given price. Below are the minimum requested PFAS compounds. Additional compounds are useful if they can be included for the same or similar price of the minimum set. As of 2023, BGNDRF has used EPA 537.1 MOD, however, will transition to EPA 1633 soon (likely within the first year of the contract). Contractor shall provide its list of compounds along with detection and laboratory reporting limits for each as part of their proposal. Contractor shall indicate whether brackish water (1-6 g/L total dissolved solids) poses analytical challenges and how they will be addressed. Contractor shall indicate whether they are able to perform both EPA Method 537.1 MOD and 1633.

Acronym
Compound
CAS
Suggested Reporting Limit (ng/L)
6:2 FTS
6:2 Fluorotelomer sulfonic acid
27619-97-2
≤ 5
HFPO-DA (also known as GenX)
Hexafluoropropylene oxide dimer acid
13252-13-6
≤ 2
NEtFOSAA
N-ethyl perfluorooctanesulfomidoacetic acid
2991-50-6
≤ 5
PFBS
Perfluorobutanesulfonic acid
375-73-5
≤ 2
PFBA
Perfluorobutanoic acid
375-22-4
≤ 4
PFDA
Perfluorodecanoic acid
335-76-2
≤ 5
PFHpS
Perfluoroheptanesulfonic acid
375-92-8
≤ 5
PFHpA
Perfluoroheptanoic acid
375-85-9
≤ 5
PFHxS
Perfluorohexanesulfonic acid
355-46-4
≤ 2
PFHxA
Perfluorohexanoic acid
307-24-4
≤ 5
PFNA
Perfluorononanoic acid
375-95-1
≤ 2
FOSA
Perfluorooctanesulfonamide
754-91-6
≤ 5
PFOS
Perfluorooctanesulfonic acid
1763-23-1
≤ 2
PFOA
Perfluorooctanoic acid
335-67-1
≤ 2
PFPeS
Perfluoropentanesulfonic acid
2706-91-4
≤ 5
PFPeA
Perfluoropentanoic acid
2706-90-3
≤ 5

Sampling Plans (subject to change):

This sampling plan is provided for the first year to show the expected frequency and variation in number of samples for each sampling event. The actual sampling schedule is subject to change and is dependent upon whether and how the BGNDRF PFAS treatment system is operating. While operating, samples are taken and sent for analysis every two weeks.

Date
Samples
Field Blank(s)
Notes
12/4/2023
5
1
12/18/2023
3
1
1/1/2024
4
1
1/15/2024
3
1
optional
1/29/2024
3
1
optional
2/12/2024
4
1
2/26/2024
3
1
optional
3/11/2024
7
1
3/25/2024
3
1
optional
4/8/2024
4
1
4/22/2024
3
1
optional
5/6/2024
4
1
5/20/2024
3
1
optional
6/3/2024
4
1
6/17/2024
3
1
optional
7/1/2024
4
1
7/15/2024
3
1
optional
7/29/2024
3
1
optional
8/12/2024
4
1
8/26/2024
3
1
optional
9/9/2024
7
1
9/23/2024
3
1
optional
10/7/2024
4
1
10/21/2024
3
1
optional
11/4/2024
4
1
11/18/2024
3
1
optional
12/2/2024
4
1
12/16/2024
3
1
optional
12/30/2024
3
1
optional
# samples expected
66
15
# optional samples
48
16
# invoices expected
15
15
# optional invoices
16
16

File details come from the government source that posted it. Updated .