STATEMENT OF WORK

USS ASHEVILLE DRAIN PIPING CLEARING

1. GENERAL: The contractor shall provide all necessary labor, material, transportation, supervision, equipment, engineering design, and other incidental work required to conduct drain pipe clearing.

2. SUMMARY: All items and personnel shall be on station and ready to conduct drain pipe clearing between the dates 23JULY21 and 13SEP21. Items to be cleared include 4 water closets, 2 urinals, 9 deck drains, 3 showers, and 1 Gaylord drain located in FCML Head, CPO and JO Head.

3. SAFETY: Ship force to conduct any tag-out required to conduct work. Verify with POC prior to conducting work to verify tag-outs are completed.

4. REQUIREMENTS AND DETAILS:

4.1 Work is scheduled from 0700-1600 with authorized overtime to 2000 if required. Additional overtime is not authorized without permission of the Contracting Officer.

4.2 Contractor shall provide all labor, tools and required equipment to accomplish drain pipe clearing.

4.3 Contractor shall clear all deck drain piping consisting of 4 water closets, 2 urinals, 9 deck drains, 3 showers, and 1 Gaylord drain.

4.4 Hull frames for associated heads are Middle Level head (Frame 33-34), Junior Officer head (Frame 34-36), and Chief Petty Officer head (Frame 32-33).

4.5 Contractor shall conduct operational test with job POC as the piping is cleaned/cleared. A flow test will be conducted to ensure that pipes are clear of any debris, and water flow is at an optimal level.

4.6 Unit location is at Bravo Pier at Polaris Point Guam, and period of performance shall be 23 JUL21 – 13 SEP21. Contractor shall verify with Ship Superintendent MMA1 Corey prior to start of work, before work commences every day, and escort contractor to the boat.

4.7 Contractor shall coordinate with ships force to be escorted on the unit for performance of work.

4.8 Contractor shall clean drain piping with hydro blast cleaning to complete tasking, in accordance with NSTM 505-4.8. Other methods will need to be approved by 3MC (MMACS Groehler) before use.

5. REFERENCES: Drain pipe clearing should be compliant with S6161-HA-FSE-010 and NSTM Chapter 505 for piping systems section 505-4.8

6. NOTES:

1. Performance Location: Polaris Point, Bravo pier, Guam

2. Period of Performance: 23 JUL – 13 SEP 2021

3. Ship superintendent POC is MMA1 Corey, contact information is 671-343-2545 EX 7525, coreyjs@as40.navy.mil

4. Ship force point of contact is MMACS Groehler, contact information is 671-682-6008 (671-343-1322)

5. Govenrment Purchase Card Point of Contact is LS2 Stoneham, Krista, contact information is stonehkl@as40.navy.mil.