Attachment 1 SOS Section B.xls
XLS spreadsheet 58 KB Posted
- Attached to
- USCGC PAMLICO DRY DOCK FY22
- Solicitation number
- 70Z08522QP4502400
About this file
This document is a combined synopsis and solicitation for ship repair services for the USCGC PAMLICO, a 160-foot Coast Guard cutter. The solicitation requests quotes by September 29, 2021 for repair work to be completed from January 18 to March 29, 2022 at the contractor's dry dock facility. The solicitation is set aside for small businesses with a NAICS code of 336611 and size standard of 1,250 employees. Services include ship repair and associated support work as described in specification Rev-08 dated June 8, 2021. The contract type will be firm fixed price. The Coast Guard will award the contract on or about October 19, 2021. Questions regarding the solicitation are due by September 27, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 USCGC PAMLICO DD.pdf | ||
| 160B-WLIC_6700_2_1_-_-.pdf | ||
| 160-WLIC_6700_2_1_-_A.pdf | ||
| Amendment 0001 USCGC PAMLICO DD.pdf | ||
| Attachment 7 Redacted Wartsila J and A.pdf | ||
| Attachment 3 Past Performance Information Form.doc | DOC document | |
| Attachment 6 Redacted Fire Suppression J and A.pdf | ||
| Combined Synopsis Sol DD PAMLICO.doc | DOC document | |
| Attachment 4 Request for Clarification.docx | DOCX document | |
| Attachment 5 USCG Ombudsman Notice.docx | DOCX document | |
| Attachment 2 PAMLICO (WLIC 160A) DD FQ2 DBB 21R0.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC PAMLICO (WLIC-160A) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Inspect | JOB | 1 | $0.00 | |
| D-003 | Hull Plating (Freeboard), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-004 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| D-005 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| O-006 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-007 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-008 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | JOB | 1 | $0.00 | |
| O-009 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | JOB | 1 | $0.00 | |
| O-010 | Hull and Structural Plating (General) - Degraded Weld (Steel), Repair | JOB | 1 | $0.00 | |
| D-011 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| D-012 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| O-013 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-014 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $0.00 | |
| D-015 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| O-016 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-017 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-018 | Propulsion Shaft Seals (Inflatable), Overhaul and Inflatable Renewal | JOB | 1 | $0.00 | |
| D-019 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-020 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| D-021 | Mechanical Shaft Seal Assemblies, Renew | JOB | 1 | $0.00 | |
| D-022 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $0.00 | |
| D-023 | Propulsion Stern Tube Bearings, Check Clearances | JOB | 1 | $0.00 | |
| O-024 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | |
| O-025 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | $0.00 | |
| O-026 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| D-027 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-028 | Propeller, Minor Repairs and Reconditioning, Perform | JOB | 1 | $0.00 | |
| D-029 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-030 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-031 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-032 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $0.00 | |
| D-033 | Rudder Assembly; Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| O-034 | Rudder(s), Preserve (“100%”) | JOB | 1 | $0.00 | |
| D-035 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $0.00 | |
| O-036 | Rudder Stock Housing (Lower), Renew | JOB | 1 | $0.00 | |
| O-037 | Rudder Stock Housing (Upper), Renew | JOB | 1 | $0.00 | |
| D-038 | Spuds, Overhaul | JOB | 1 | $0.00 | |
| O-039 | Spud Wells, Preserve | JOB | 1 | $0.00 | |
| D-040 | Spud Wells, Inspect | JOB | 1 | $0.00 | |
| O-041 | Tanks (MP Fuel Service), Preserve, Partial, | JOB | 1 | $0.00 | |
| O-042 | Tanks (MP Fuel Storage and Overflow), Preserve “Partial” | JOB | 1 | $0.00 | |
| O-043 | Tanks (MP Fuel Storage and Overflow), Preserve, 100%, | JOB | 1 | $0.00 | |
| O-044 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $0.00 | |
| O-045 | Superstructure, Preserve, 100% | JOB | 1 | $0.00 | |
| D-046 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | $0.00 | |
| D-047 | Drydock, | JOB | 1 | $0.00 | |
| D-048 | Temporary Services, Provide, Tender | JOB | 1 | $0.00 | |
| D-049 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| O-050 | Main Mast, Preserve, 100% | JOB | 1 | $0.00 | |
| D-051 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| O-052 | Lead Dust, Clean | JOB | 1 | $0.00 | |
| O-053 | Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement | JOB | 1 | $0.00 | |
| D-054 | Watertight Hatch (External DC Deck and Below), Renew | JOB | 1 | $0.00 | |
| D-055 | Main Deck Plating Repair | JOB | 1 | $0.00 | |
| D-056 | Pilot House Top, Renew | JOB | 1 | $0.00 | |
| D-057 | Deck Lighting Foundation, Renew | JOB | 1 | $0.00 | |
| D-058 | Deck Drain, Renew | JOB | 1 | $0.00 | |
| D-059 | Stanchions, Renew | JOB | 1 | $0.00 | |
| D-060 | Crane Pedestal Repair | JOB | 1 | $0.00 | |
| D-061 | Cargo Hold Natural Ventilation, Renew | JOB | 1 | $0.00 | |
| D-062 | Foremast Ladder Rung, Renew | JOB | 1 | $0.00 | |
| D-063 | Potable Water System Tank Manifold, Renewal | JOB | 1 | $0.00 | |
| D-064 | Potable Water Piping, Renew | JOB | 1 | $0.00 | |
| D-065 | 01 Weather Deck, Preserve | JOB | 1 | $0.00 | |
| D-066 | Galley Fire Suppression System, Install | JOB | 1 | $0.00 | |
| D-067 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | $0.00 | |
| D-068 | Ventilation Systems, Commercial Clean | JOB | 1 | $0.00 | |
| D-069 | Lube Oil Storage Tank, Install | JOB | 1 | $0.00 | |
| D-070 | Point of Use Potable Water Filters, Install | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 750 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(6/8/2021) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .