Attachment 1_SOR (Wireless Mics).docx
DOCX document 27 KB Posted
- Attached to
- Wireless Mics & Associated Equipment
- Solicitation number
- F2X3C54107AC01
About this file
This document is a Statement of Requirement (SOR) for wireless microphones and associated equipment required by the 42nd Communications Squadron at Maxwell AFB, AL. The key details are:
The 42nd Communications Squadron has a requirement to implement modern audio equipment within the Maxwell Club building to support the Commander's Course program. The equipment requirements consist of 6 wireless microphone receivers, 24 gooseneck microphones, 2 mixers, 2 rack mount bracket kits, 2 power conditioners, 2 rack consoles, 24 rechargeable batteries, and 3 battery charger kits. All items must be compatible and fully functional as a complete system. The contractor shall provide a Performance Management Plan outlining the timeline for ordering and delivery. The equipment must be new with a minimum 1-year manufacturer's warranty. The new equipment is to be delivered to the 42nd Communications Squadron at Maxwell AFB, AL.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAM Solicitation (Wireless Mics).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENT
Maxwell_42 CS Commander’s Course Mics
Introduction and Background. The 42nd Communications Squadron at Maxwell AFB, AL has a requirement to implement modern audio equipment within building 144, locally known as the Maxwell Club. Justification: The Commander’s Course, an AF Chief of Staff directed class, requires integrated communication of C Level Commanding Students. If not approved, the Command Course will have unacceptable communication adversity.
1.0 DESCRIPTION OF THE ITEMS. The equipment requirements consist of wireless microphones with additional items needed to support their capability.
2.0 Compatibility: All items must be compatible and capable of functioning together as a single system. The end result with be complete and fully functioning system.
3.0 Networking Equipment: The contractor shall provide the following new equipment.
3.0.1. Wireless Receivers. Qty: 6
| 3.0.1.1. RF Frequency Band between 572 to 608 and 614 to 616 MHz (J50A). |
| 3.0.1.2. Minimum of 4 Audio Channels. |
| 3.0.1.3. Max operating range of 100 meters. |
3.0.2. Gooseneck Base. Qty: 24.
| 3.0.2.1. RF Frequency Band between 572 to 608 MHz and 614 to 616 MHz (J50A). |
| 3.0.2.2. RF Bandwidth of 44 MHz |
| 3.0.2.3. Max operating range of 100 meters. |
3.0.3. Gooseneck Mic. Qty: 24.
| 3.0.3.1. Frequency range between 50 Hz to 17 kHz. |
| 3.0.3.2. Maximum SPL of 120 dB. |
| 3.0.3.3. Must be Cardioid Dualflex. |
| 3.0.3.4. No more than 15” long. |
3.0.4. Mixer. Qty: 02.
| 3.0.4.1. At least 16 high-headroom line inputs with +4/-10 operation control. |
| 3.0.4.2. Must include Onyx preamps with a high-headroom/ low-noise design. |
| 3.0.4.3. Contains distortion under 0.0007% (20 Hz to 50 kHz) |
| 3.0.4.4. Must have rack-mountable design that includes rack ears. |
3.0.5. Rack Mount Bracket Kit. Qty: 02.
| 3.0.5.1. Compatible to Mixer. |
| 3.0.5.2. Provides at least two Rack Ears in kit. |
3.0.6. Power Conditioner. Qty: 02.
| 3.0.6.1. No amp metering. |
| 3.0.6.2. Minimum of 8 Outlets. |
3.0.7. Rack Console. Qty: 02.
| 3.0.7.1. Must be Pop-Up rack. |
| 3.0.7.2. At least 10 RU on Top, 6 RU Front. |
| 3.0.7.3. Lockable Latch included. |
3.0.8. Batteries. Qty: 24.
| 3.0.8.1. Compatible with ULXD products and systems. |
| 3.0.8.2. Must be rechargeable lithium-ion batteries. |
3.0.9. Battery Charger Kit. Qty: 03.
| 3.0.9.1. Compatible with the 24 batteries. |
| 3.0.9.2. Comes with at least 8 rechargeable batteries. |
| 3.0.9.3. Full charge in a maximum of 3 hours. |
| 4.0 | Performance Management Plan (PMP): The contractor shall provide a PMP that shows a timeline from issuance of the contract to delivery of the communications equipment to the delivery location identified in this solicitation. The PMP may be expressed in terms of “days after contract”. This PMP shall include, at a minimum, a timeline for: |
| Description | |
| Days After Contract |
Ordering
Delivery
5.0. Warranty: All ITS equipment and cabling supplied must be ITS standard products and supplied from a reputable manufacturer and must carry a minimum 1-year manufacture warranty. No refurbished, recertified, reconditioned, or remanufactured items will be accepted.
6.0 Technical POCs:
6.0.1. 2nd Lt Justin Lopez, (312) 522-9066, justin.lopez.15@us.af.mil
6.0.2. 1st Lt DJ Williams, 334-953-7240, keeth.williams@us.af.mil
6.0.3. 1st Lt Quentin Savage, 334-953-7240, quentin.savage.1@us.af.mil
7.0. Shipping Information: The contractor shall provide and deliver the new equipment to 42CS/SCXE Attn: 2nd Lt Justin Lopez, Bldg. 941, Communications Squadron 170 West Selfridge St, Maxwell AFB, AL 36112.
File details come from the government source that posted it. Updated .