This document is a Statement of Work (SOW) for the United States Department of Agriculture (USDA) Agricultural Research Service, detailing a window replacement project at the Dale Bumpers National Rice Research Center in Stuttgart, Arkansas. The project involves removing and replacing existing windows with Solar Ban 70X XL Glass units filled with argon gas, and installing 8 mil clear 3M Scotchshield Safety and Security window film on all new glass surfaces. The scope includes 62 windows of various sizes ranging from 25" x 26" to 70" x 29", with specific requirements for installation, safety standards, and coordination with research center staff.
Key project details include a 90-day completion timeline, mandatory site visit on August 19, 2025, and work hours restricted to Monday through Friday, 7 AM to 4 PM. Contractors must be registered in the System for Award Management (SAM), submit a Site-Specific Safety Plan within 14 days of contract award, and coordinate closely with USDA representatives. The solicitation number is 1232SA25R0023, with RFI questions submission cutoff on 08/21/2025. The project emphasizes minimizing disruption to ongoing research operations and requires contractors to utilize bio-based products where possible and adhere to various federal and safety standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_1232SA25R0023_Amd_0001.pdf | ||
| Attachment 4 Questions and Answers 1232SA25R0023.pdf | ||
| Solicitation 1232SA25R0023.pdf | ||
| Attachment 2 Wage Determination AR20250018 dated 01-03-2025.pdf | ||
| Attachment 3 Schedule of Pricing (MS Excel Interactive Document).xlsx | XLSX spreadsheet | |
| Site Visit Information.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work USDA, Agricultural Research Service
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Replacement of Windows and Installation of Safety and Security Film
Dale Bumper National Rice Research Center
(DBNRRC)
2890 Highway 130 E Stuttgart, AR 72160
Prepared by Robert Ideker May 12, 2025
Version 2.8, Page -
Scope Statement This is for the replacement of windows and the installation of Safety and Security Film at the Dale Bumpers National Rice Research Center (DBNRRC) 2890 AR – 130 East, Stuttgart Arkansas 72160. This project will consist of removing and installing all glass with Solar Ban 70X XL Glass units filled with argon gas. This will include replacement of all rubber seals in the existing frames and resealing around existing frames. All the new glass will have 8 mill, clear 3M Scotchsheild Safety and Security window film installed.
Summary of services:
The contractor will be responsible for all the parts, equipment and labor to remove the old glass and install the new glass.
The contractor will provide and install 3M Scotchsheild Safety and Security clear window film on all new glass.
The proposal will be presented in MS Word format, and the cost breakdown/analysis will be presented in MS Excel.
The contractor shall include all services and field labor and equipment necessary to install windows and safety film.
Applicable Codes and Standards apply and are not limited to the following:
| ANSI - | American National Standards Institute. |
| ASME - | American Society of Mechanical Engineers. |
| NEC - | National Electrical Code, NFPA 72. |
| OSHA - | Occupational Safety and Health Administration |
| ADA – | Americans with Disabilities Act |
All work must meet ARS 242.1M “ARS Facilities Design Standards” for the defined scope of this project in addition to meeting all Local, State and Federal codes, and latest IBC codes. The document may be found at https://www.afm.ars.usda.gov/ppweb/pdf/242-01m.pdf.
Project Objectives The project consists of the following elements:
1. Remove old glass and disposal.
2. Supply and install new weatherproof seals and reseal around existing frames.
3. 8 Mill safety shield will be installed with ½” polyurethane sealant.
4. Contractor is responsible for all parts and labor.
5. All materials will be supplied by the contractor.
6. Contractor will coordinate with location staff not to disrupt research in work areas.
7. Window measurements:
2 – 44”x 20” 4 – 44”x 29 ¼” 2 – 44”x 33 ¾” 2 – 64 ½”x20” 4 – 64 ½”x 29 ¼” 2 – 64 ½”x 33 ¾” 2 – 67 ¾” x 19 ½” 4 – 67 ¾” x 29 ¼” 2 – 67 ¾” x 33 ¾” 1 – 70 ½” x 19 ½” 2 – 70 ½” x 29 ¼” 1 – 70 ½” x 33 ¾” 2 – 41 ½” x 20” 4 – 41 ½” x 29 ¼” 2 – 41 ½” x 33 ¾” 10 – 44 ½” x 27 ¼” 1 – 40” x 20” 1 – 40” x 29 ¼” 1 – 40” x 33 ¾” 6 – 40” x 27 ½” 32 – 44 ½” x 27 ½” 28 – 27 ½” x 27 5/8” 2 – 25” x 26” 2 – 25” x 29 ¼” 2 – 25” x 33 ¾” 2 – 25” x 33 ¾” 2 – 35 ½” x 7” 3 – 28 1/8” x 70 5/8” 1 – 26 ½” x 28” 1 – 29 ¼” x 28” 1 – 33 ¾” x 28”
Site Visit Contractors are required to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first-hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where Contract Documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be completed at www.sam.gov/portal/public/SAM
Utilization of Bio-Based Products The contractor shall utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: www.biopreferred.gov
Safety The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review the SSSP prior to the start any construction activities. SSSP shall be in typically accepted industry format.
Base Bid Contractor shall perform the work as specified in the Statement of Work.
Contractor Responsibilities The project has a base bid to be performed per the following specifications:
1. Contractor will verify all dimensions and existing site conditions prior to beginning work.
2. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
3. Contractor is required to manage the project and consult with the Government prior to beginning all work phases.
4. Contractor shall perform work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility and its workers.
6. Contractor will provide daily reports of work performed to the COR.
7. Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.
8. Contractor must have a superintendent on the jobsite when crews are performing the installation work.
9. Contactor will provide their own restroom facility.
10. Contractor to include commissioning of the new system, and controls tie-in to the existing building automation system (BAS).
Material / Submittals:
The material for the entire work shall include but are not limited to those detailed above necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material used on this project shall be submitted to the EPM, Site RL, and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Installation Procedure:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 90 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts
RESEARCH LEADER (RL)
Dr. Yulin Jia Phone: 870-672-6129
USDA, ARS, SEA
2890 HWY 130 East Stuttgart, AR, 72160 Email: Jia.yulin@usda.gov
ADMINSTRATIVE OFFICER (AO)
Raeann Braithwaite Phone: 870-672-8254
USDA, ARS, SEA
2955 Highway 130 East Stuttgart, AR 72160 Email: Raeann.braithwaite@usda.gov
CONTRACTING OFFICER Representative (COR) Robert Ideker Phone: 870-672-8266
USDA, ARS, SEA
2955 Highway 130 East Email: Robert.Ideker@usda.gov Stuttgart, AR 72160
ENGINEERING PROJECT MANAGER (EPM) & (CO)
Everett Wilson Phone: 720-618-0703 USDA, ARS, SEA Facilities 3550 Main Street, #5121 Houston TX 77002 Email: everett.wilson@usda.gov
AREA SAFETY AND HEALTH MANAGER (ASHM)
Joel Ledbetter (SNARC) Phone: 870-672-8255
USDA, ARS, SEA
2890 HWY 130 East Stuttgart, AR 72160-0287 Email: joel.ledbetter@usda.gov image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image1.jpg
File details come from the government source that posted it. Updated .