U.S. General Services Administration

Region 10

Public Buildings Service www.gsa.gov

Statement of Work for

BLM Carpet Install

PROJECT IDENTIFICATION

Project Title: AFB BLM Carpet Install

Building: US Federal Building & James M. Fitzgerald USCH

Building ID #: AK0031AA

Building Location: 222 West 7th Avenue, Anchorage, AK 99513

11/30/2022 1 of 10 http://www.gsa.gov/

Statement of Work 2 of 8

TABLE OF CONTENTS

Project Information 3

Scope of Work 4

Submittals and Close Out 5

Applicable Standards 6

Conflicts Between Codes or Standards and GSA Requirements 6

Acceptance Criteria 7

General Requirements 8

Statement of Work 3 of 8

1. Project Information

1.1. Location of Work:

1.1.1. Building Number: AK0031AA

1.1.2. Name: Anchorage US Federal Building & James M. Fitzgerald USCH

1.1.3. Address: 222 West 7th Avenue, Anchorage, AK 99513

1.1.4. Area: BLM, 4th Floor

1.2. Background: The US Federal Building & James M. Fitzgerald Courthouse is more commonly referred to as the Anchorage Federal Building, or AFB. The AFB is within the

Anchorage Central Business District. The architectural style of the AFB is considered to be

“Great Society-International” and is constructed of a structural steel frame with an exterior skin composed of concrete panels and glass, separated into six modules. There are poured concrete retaining walls along the sidewalks, concrete planters in the plaza areas that act as vehicle barriers, and the outside plaza sidewalks have heat coils under the paving stones to keep the sidewalk free of snow and ice. The building consists of six floors above grade and one below. The top floor is for mechanical and building support equipment, and the basement floor is a parking garage.

1.2.1. Project Purpose:

1.2.1.1. Provide new carpet and cove base in the Bureau of Land Management’s (BLM)

4th Floor office area. The areas to complete are in modules C, E and F. The

BLM occupies the entire 4th floor.

1.2.2. Project Summary:

1.2.2.1. The BLM requires new carpet and cove base to be installed in phases, starting with (1) the Human Resources Office; (2) the E Module (includes Budget, back side of the print shop, and FOIA); (3) the C Module; and last, the F Module

(preferably in the summer of 2023). This installation will require the careful removal and reinstallation of systems furniture, storage cabinets, wall storage cabinets, tables, bookcases, boxes, etc. to provide new carpet and cove base to area. It will also require contractor to install carpet to ensure access to the existing floor outlets.

1.3. Period of Performance:

1.3.1. The period of performance is three hundred (300) calendar days from Award to

Substantial Completion and thirty (30) calendar days from Substantial

Completion to Final

Statement of Work 4 of 8

Completion, for a total period of performance of three hundred thirty (330) calendar days.

1.3.2. Work Hours:

1.3.2.1. The Contractor is required to perform all work specified for this project after normal working hours. Normal business hours for the AFB are 7:30 am to

5:00pm. Contractor can begin mobilization of the project beginning at 4:00pm.

2. Scope of Work

2.1. Provide and Install New Carpet and Cove Base

The BLM requires new carpet and cove base to be installed in phases, starting with (1) the Human Resources Office; (2) the E Module (includes Budget, back side of the print shop, and Freedom of Information Act; (3) the C Module; and last, the F Module (preferably installed in the summer of 2023. This area is in the field during the summer months.

The BLM requires two weeks’ advance notice before each phase begins.

2.1.1. Refer to provided drawing for area of work. Areas are just approximate.

2.1.1.1. Provided drawings are considered Controlled but Unclassified Information (CUI), and thereby require administrative control and protection from public or other unauthorized disclosure.

2.1.2. Meet with Government to discuss phasing of work, and discuss staging areas for electronics, boxes, etc.

2.1.2.1. Discuss each phase of work, and expectations of boxing.

2.1.2.2. Expectation is that agency will box up contents of a prescribed amount of cubicles each night, and contractor will install carpet in those areas so personnel can return to work the next morning and begin unpacking.

2.1.3. Demolish and dispose of existing carpet and cove base. MARK (with blue tape) existing outlets in the floor. BLM will determine if they require access to the outlets.

2.1.3.1. Contractor may not use on site dumpster for disposal of any materials.

2.1.3.2. Contractor may not stage a dumpster on site – all materials must be removed at the end of each day.

2.1.3.3. Contractor shall repair any wall damage caused by the removal of existing cove base.

2.1.3.4. Contractor shall keep (50) carpet tiles that are still in good condition and place in storage area on the 4th floor.

2.1.4. Move and replace any furniture/movable equipment to install carpet and cove base.

MARK existing outlets especially if in use by the BLM. Coordinate with

Government as required.

2.1.4.1. Furniture and equipment include but is not limited to systems furniture

(cubicles), tables, boxes, storage cabinets, wall storage cabinets, file cabinets, bookcases, light tables, plotters, and copiers.

2.1.4.2. Agency shall be responsible for disconnecting and moving IT equipment, and electronics to include monitors and laptops. Agency will store these items in an unused area, exact location TBD. Agency will relocate equipment after project is complete.

Statement of Work 5 of 8

2.1.4.3. Agency will remove any personal items to include but not limited to plants, artifacts, artwork, picture frames, knickknacks, etc.

2.1.4.4. Agency will provide boxes and do their own packing, but will leave boxes in immediate area (i.e. cubicles)

2.1.5. Provide and install new carpet tiles.

2.1.5.1. Contractor responsible for verifying quantities.

2.1.5.2. Agency will provide a storage area for new carpet for the purposes of climatization. Carpet to be delivered no more than (7) calendar days prior to the start of work. It is expected the Contractor will have to store the majority of the carpet due to the size of the project.

2.1.5.3. Install as per manufacturer’s instructions and guidelines.

2.1.5.4. Use manufacturer’s recommended adhesives.

2.1.5.5. Contractor shall ensure transitions between flooring are not a trip hazard.

2.1.5.6. Contactor shall ensure existing electrical floor outlets are still accessible to the end users.

2.1.6. Provide and install cove base.

2.1.6.1. Contract responsible for verifying quantities.

2.1.6.2. Install cove base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned.

2.1.6.3. Contractor shall miter joints at corners.

2.1.6.4. Ensure new cove base installation conceals any evidence of previous cove base installation.

2.1.7. The project work is required to comply with all federal, state and local environmental laws, regulations, and standards, as well as guidelines on the Sustainable Facilities Tool.

3. Submittals and Close Out

3.1. Submittals

3.1.1. Contractor shall provide a submittal on the carpet and cove base.

3.1.2. Carpet shall be Shaw Commercial (or Contracting Officer Approved Equal)

3.1.2.1. 5T116 Stipple

3.1.2.2. Carpet installation pattern shall match the pattern that has previously been installed in the “corridor” and in the Executive Suites.

3.1.2.3. See provided layout “AFB BLM Drawing Phased Carpet” for additional information.

3.1.3. Cove Base shall be Tarkett (or Contracting Officer Approved Equal)

3.1.3.1. Rubber base, 4.5” in height

3.1.3.2. Burnt Umber 63

3.2. Closeout submittals

3.2.1. Warranty Letters

3.2.1.1. The Contractor is required to provide the government with official copies in electronic format of all warranties.

3.2.2. Cleaning Information

3.2.2.1. The Contractor is required to provide the government with official copies from the manufacturer on official cleaning best practices and recommendations.

3.2.3. Attic Stock

Statement of Work 6 of 8

3.2.3.1. The contractor is required to provide the government with five (10) intact carpet tiles. COR will indicate where to place these tiles during substantial completion walk through.

3.2.4. Final Requesting Official Contractor Approval List (ROCAL) and Access

Credentials

3.2.4.1. The contractor is required to provide a final ROCAL to the sponsoring GSA

Official (COR/PM), indicating the dates that all staff have been removed from the project.

4. Applicable Standards

Conflicts Between Codes or Standards and GSA Requirements

To ensure flexibility, GSA’s policy is to make maximum use of equivalency clauses in all codes and standards. If a conflict exists between GSA requirements and the GSA-adopted codes or standards, the GSA requirements take precedence. All such conflicts must be brought to the attention of the GSA project manager as appropriate for resolution.

4.1. The Contractor is required to be responsible for ensuring compliance with federal, state, and local codes and design standards at the time of award, using the latest editions, including, but not limited to the following:

4.1.1. PBS P-100

4.1.2. PBS P-120

4.1.3. Pricing Desk Guide

4.1.4. 1000.8 PBS Indoor Air Quality Management

4.1.5. PBS Key Sustainable Products Initiative PBS 1096.1

4.1.5.1. In addition to the above listed key sustainable products, all other interior finishes must meet, at a minimum, the baseline environmental requirements specified in the GSA P100 facilities standards, Chapter 3, Architecture and Interior Design.

Contractor shall submit product data for each finish material used, demonstrating compliance with the appropriate environmental requirements. Sustainability requirements for specific interior finishes and construction materials may also be found at https://sftool.gov/.

4.1.6. Occupational Safety and Health Administration (OSHA)

https://www.osha.gov/Publications/OSHA3990.pdf

4.1.7. Job site standards incorporated into the work (refer to 5.2.1.2.5)

4.1.8. International Building Code (IBC)

4.1.9. Painting and Decorating Contractors of America (PDCA)

4.1.10. Carpet and Rug Institute (CRI)

5. Acceptance Criteria

5.1. Visual inspections

5.1.1.1. Inspections are required to verify that the work product meets applicable standards (see Section 4.0).

5.1.1.2. Inspection Criteria for visual inspections of completed installations are required to be conducted with “normal” lighting, “normal” viewing angles, without magnifications:

● Normal lighting conditions - Normal lighting conditions are described as those in place when the project is finished. This http://www.osha.gov/Publications/OSHA3990.pdf http://www.osha.gov/Publications/OSHA3990.pdf http://www.osha.gov/Publications/OSHA3990.pdf

Statement of Work 7 of 8 includes, but not limited to, design lighting (e.g., wall washers, spots and floods, etc.) and natural lighting.

● Normal viewing position - The normal viewing position is required to be established at a minimum distance of five feet perpendicular from the surface to be viewed.

5.1.1.2.1. Inspection lighting is required to be representative of normal lighting conditions in intensity and location. Consideration is required to be given to window treatment and/or any other decorative finishes that could affect lighting and viewing.

5.1.1.2.2. A normal viewing position is required to be used. Visual evaluation for acceptance can be determined from a normal viewing position, at any angle, provided it is established at a minimum distance of five feet perpendicular from the surface to be viewed.

5.1.1.2.3. When viewed without magnification under occupancy conditions with normal lighting conditions and from a normal viewing position, a level of visual appearance is achieved as established by the approved job site standard.

6. General Requirements

6.1. Building Requirements

6.1.1. The building will be occupied by federal staff and potentially the public during the construction phase. The Contractor is required to minimize disruptions and ensure the safety of building tenants and public is maintained at all times, to include, but not limited to:

6.1.1.1. Keep supplies and materials in their staging areas and provide safety features such as cones, fencing or locked doors.

6.1.1.2. Provide dust and odor containment, meeting GSA Indoor Air Quality standards.

6.1.1.3. Plan noisy or vibrating work to ensure disruptions to the Government operations and work are minimal. Provide planning documents like “Sequence of

Operations” or “Look-ahead Schedules” to inform stakeholders.

6.1.1.4. Erect safety barriers (passive and/or active) and provide warning signs.

6.1.1.5. Availability of parking, loading dock access and lay down areas are extremely limited at this location and must be coordinated in advance with GSA COR. After unloading of materials, parking is the responsibility of the contractor.

6.2. Daily Cleanup

6.2.1. The contractor is required to keep all areas open to the public or the tenant free from hazards, dirt and debris.

6.2.1.1. Remove all waste and debris from the worksite and building, by the end of each day.

6.2.1.2. The building disposal system may not be used for construction waste.

6.2.1.3. The contractor is required to provide waste removal for construction debris and a dumpster or roll-off bin with a lockable lid.

6.3. Utilities

6.3.1. Water and electric service will be provided to the Contractor at no cost.

6.3.2. Do NOT use AFB restrooms for cleaning of tools, materials, etc.

Statement of Work 8 of 8

6.4. Protection

6.4.1. The Contractor is required to provide all labor, material, and equipment necessary to protect personnel, furnishings, equipment or the building structure from damage.

6.4.2. The Contractor is required to provide all engineering controls to protect all areas being worked on from the migration of dirt, dust, oils and spray.

6.4.3. The Contractor is required to replace or repair to the original condition any items damaged due to work performed under this contract, at no additional cost to the

Government.

6.5. Work Site Access

6.5.1. The Contractor is required to ensure access to the site maintains the following protocols:

6.5.1.1. Entrance to the worksite is required to be through employee entries or roll up doors for the dock access.

6.5.1.2. Coordinate all deliveries with the Project Manager.

6.5.1.3. Use rubber-tired vehicles for conveying material inside the building and provide temporary covering to protect floors.

6.5.1.4. Provide safety barriers.

6.6. Safeguard of Equipment, Supplies, and Materials

6.6.1. The Contractor is required to safeguard all equipment, supplies and materials. The

Government will not be responsible for any loss or damage to materials, supplies, tools, or equipment on the site, including materials in which salvage value may have been reflected in bid.

6.7. Site Closeout Requirements

6.7.1. The Contractor is required to complete all tasks listed below prior to submitting the final invoice for payment:

6.7.1.1. Clean each surface or unit to the condition expected in a normal, commercial cleaning and maintenance program. Ensure that cleaning covers the pathways to the work site as well as inside the work site. Ensure cleaning materials comply with all manufacturer’s written instructions and meet GSA PBS Key Sustainable

Products Initiative PBS 1096.1 and 1000.8 PBS Indoor Air Quality Management.

6.7.1.2. Remove all debris, tools, equipment and materials from the job site.

6.7.1.3. Submit close-out ROCAL and return any PIV cards.

6.7.1.4. Return key sets to Project Manager

6.8. Security and Access

6.8.1. The Contractor is required to ensure all workers pass a background investigation prior to the start of the work. Refer to GSA Office of Mission Assurance (OMA), HSPD-12

Policy (Attachments Section 7, Vendor Training).

7. Attachments

7.1. AFB BLM Drawing Phased Carpet

END OF STATEMENT OF WORK