United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Demolish Greenhouse 16 Asset ID - 640800B016

National Sedimentation Laboratory

598 McElroy Drive, Oxford, MS 38655

Prepared by:

April 2023

Table of Contents

1. Project Site Map Page 3

2. Project Contact Persons Page 4

3. Project Requirements Page 5

4. General Requirements Page 7

5. Hazardous Material Page 8

6. Project Schedule Page 9

7. Photos Buildings Page 10

c. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.

3.1 Bid Schedule:

a. The Base Bid shall include all work described in 3.2 Description of Work.

3.2 Description of Work:

a. The project is to demolish and dispose of Greenhouses 16 in its entirety. The greenhouse is approximately 650 SF. It was built in the 1984 and consists of metal supported glass walls and roof with concrete block knee walls and concrete wall foundations. The Greenhouse has a dirt floor with a concrete walkway running through the middle. Demolition shall include removing the building, concrete foundations, walkway, water supply, and electrical service back to the panel and all appurtenances related or connected thereto. Removed utilities shall be terminated in a manner conforming to the nationally recognized code covering the specific utility and approved by the COR.

b. During demolition, provide safeguards, including warning signs, barricades, temporary fences, and other similar items that are required for protection of all personnel during demolition and removal operations. Maintain fences, barricades, and other similar items around exposed excavations until such excavations have been completely filled.

c. This Greenhouse was built in 1984. No asbestos survey is available for this building. Due to the year and type of construction, asbestos containing materials are not expected to be encountered. Base bid amount should reflect this assumption. Contractor shall inspect the site and building and complete a hazardous materials assessment before the demolition starts. The cost of this assessment shall be included in the Contractor’s base bid. If ACM or other hazardous materials are found, it will be immediately brought to the attention of the CO and COR for resolution which will be through a contract modification.

d. The Contractor shall be responsible to handle and dispose of debris at an off-site, certified disposal site consistent with all Local, State, and Federal requirements.

e. After demolition, holes shall be filled and disturbed areas shall be leveled with friable topsoil which shall be placed and spread to the height of the surrounding area and seeded with grass seed mixture to match surrounding vegetation and covered using a straw mulch to prevent erosion until growth and coverage is achieved. On completion of work, leave site in clean condition.

f. All contents, furniture, appliances, equipment, material and debris shall be removed and disposed of by the contractor.

g. Contractor shall perform a metal sweep of the restored demolition site and the roads used to haul the demolished material offsite.

3.2.1 Pre-Construction Phase:

a. Pre-Construction Submittals

Prior to beginning demolition work the following submittals must be submitted to the Contracting Officer (CO) and Contracting Officer Representative (COR) for approval:

1. Work Hours, per Section H.30 entitled, MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE. The work hours will include the daily starting and stopping time, and days of the week the Contractor proposes to carry out the work. Daily Facility hours are from 7:00a.m. to 4:00 p.m. excluding weekends and Federal holidays.

Contractor shall submit a work schedule conforming to the times of operation listed above and list the anticipated completion date.

2. Construction Cost Proposal presented in a cost break-out format resembling a Schedule of Values.

4. Quality Control Plan.

5. Accident Prevention Plan/Safety plan complete with contact info and map to nearest emergency room and minor medical facility.

6. The construction contractor (CC) shall provide to the CO a list of contract personnel of the general and subcontractors, who will be emergency contacts, including address, and telephone numbers for use in an emergency. As changes occur and additional information becomes available, the CC shall update the list.

7. Waste Management Plan: Full plan should be submitted within 14 days of date established for the Construction Notice to Proceed. Approval of the contractor’s plan does not relieve the contractor of responsibility for compliance with applicable environmental regulations. This plan should include all proposed disposal sites and should include waste diversion and recycling when possible.

3.3 Government Furnished Equipment\Services:

a. The Government will furnish a reasonable amount of electricity and water.

4.0 GENERAL REQUIREMENTS:

4.1 Permits:

Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor. Submit copies of demolition, hauling, and debris disposal permits and notices for record purposes. Include description of proposed haul routes.

4.2 Utility Severance Certificates:

Provide certificates, issued by the utility owners, of severance of utility services for record purposes if required.

4.3 Demolition Plan:

Submit a comprehensive demolition plan, describing the proposed sequence, methods, and equipment for demolition, removal, and disposal of the building including the approved disposal site.

4.4 Existing Installations / Demolition:

Contractor shall coordinate demolition of existing installations with Local Point of Contact or COR. All disturbances of existing systems shall be coordinated with the LPOC or COR to prevent disconnecting equipment that might jeopardize on-going research.

4.5 Quality Control:

The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.

4.6 Protection of Work and Property/Safety Requirements:

a. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense to pre-damaged condition to the satisfaction of the COR.

b. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

c. Open depressions and excavations occurring as part of this work shall be adequately barricaded or fenced to prevent vehicle or pedestrian traffic into the work area.

d. Provide continuous noise and dust abatement as required to prevent disturbance and nuisance to the public and workers and to the occupants of adjacent premises and surrounding areas. Dampen or cover areas affected by demolition operations as necessary to prevent dust nuisance.

e. The Contract Documents may not represent all surface conditions at the site and adjoining areas.

The known surface conditions are as indicated and shall be compared with actual conditions before commencement of work and the cost shall be included in the contractor’s proposal.

f. Government will not furnish any labor or equipment to unload or move materials or supplies.

5.0 Hazardous material:

a. This greenhouse was constructed in the 1984 and is not suspected to contain asbestos containing materials. Existing conditions are reflected correctly to the best of USDA’s knowledge. Owner makes no representation, warranty, or guaranty that the conditions indicated either are representative of those conditions existing throughout the area, or that unforeseen developments may not occur, or that materials other than, or in proportions different from those indicated may not exist. Contractor shall include costs for hazardous materials assessment for this greenhouse in the proposal. If ACM or other hazardous materials are found to be present, it shall be reported to the CO & COR for further action.

5.1 Disposal of Removed Materials and Debris:

a. Dispose of removed furniture, appliances, materials, waste, trash, and debris in a safe, acceptable manner, in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction.

b. Burying of trash and debris on the site will not be permitted. Burning of trash and debris at the site will not be permitted.

c. Remove trash and debris from the site at frequent intervals so that their presence will not delay the progress of the work or cause hazardous conditions for workers and the public.

d. Removed materials, trash, and debris shall become the property of the Contractor and shall be removed from the project site and be disposed of in a legal manner. Location of disposal site and length of haul shall be the Contractor's responsibility.

e. The contractor should make every effort to recycle as much of the construction debris as possible.

f. Waste Management Plan: Full plan should be submitted within 14 days of date established for the Construction Notice to Proceed. Approval of the contractor’s plan does not relieve the contractor of responsibility for compliance with applicable environmental regulations. This plan should include all proposed disposal sites and should include waste diversion and recycling when possible.

h. All waste materials encountered during the demolition that are found to contain lead, asbestos, PCBs, fluorescent lamps, or any hazardous substances, they are to be handled and removed in accordance with local, state, and federal laws and requirements concerning hazardous waste as well as any specific hazardous waste requirements stated in different sections. These materials and any other hazardous materials must be excluded from the construction waste stream calculations.

i. Comply with hauling and disposal regulations of authorities having jurisdiction, per federal, state and local requirements.

5.2 Temporary Facilities:

a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during demolition, the Contractor shall obtain approval for such shutdown from the COR three working days prior to the need.

5.3 Cleanup:

The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.

5.4 Final Payment/Contract Closeout:

The following documents are REQUIRED PRIOR TO FINAL PAYMENT (other documents may also be required):

a. Release of liens.

b. Release of Claims

c. Employee payroll\time sheets

d. Invoice

6.0 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from the notice to proceed. NTP will be issued at the mandatory preconstruction conference.