Attachment (1) Schedule of Supplies-Services.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USCGC HAMILTON DS FY22 FYQ1
Solicitation number
70Z08521QP4501400
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bids

Attachment (1) - Schedule of Supplies and Services
Solicitation No.: 70Z08521QP4501400
USCGC HAMILTON (WMSL 753) Dockside FY22 FYQ1
Provide all labor, materials, and equipment, except as specified, to perform the services identified in Attachment (2) REV-1, dated 13 April 2021.
CLIN 0001 - DEFINITE WORK ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
Work ItemDescriptionQTYUnitAmount
D-01Tanks (MP Fuel Service), Clean and Inspect1JOB$0.00$0.00
D-01ADiesel Service 5-36-2-F1JOB$0.00
D-01BDiesel Service 5-36-3-F1JOB$0.00
D-02Tanks (Oily Waste), Clean and Inspect1JOB$0.00$0.00
D-02AOily Waste Holding, 5-41-1-F1JOB$0.00
D-02BWaste Oil, 5-42-2-F1JOB$0.00
D-02CGas Turbine Oily Waste, 5-45-1-F1JOB$0.00
D-02DGas Turbine Fuel Oil Leak, 5-45-2-F1JOB$0.00
D-02EFwd Oily Waste, 5-49-2-F1JOB$0.00
D-02FAft Oily Waste, 5-59-1-F1JOB$0.00
D-05Air Conditioning Relief Valves, Inspect and Test1JOB$0.00
D-06Air Conditioning Units Flex Hoses and Expansion Joints, Renew1JOB$0.00
D-07Folding Boom Cranes, Biennial Maintenance1JOB$0.00
D-08Bulkhead and/or Overhead Insulation, Renew1JOB$0.00
D-09Refrigerant Piping Insulation, Renew1JOB$0.00
D-10Piping Insulation, Renew1JOB$0.00
D-11Chill Water Insulation, Renew1JOB$0.00
D-12Gas Turbine Intake Screens, Renew1JOB$0.00
D-13Deck, Preserve, Full1JOB$0.00$0.00
D-13AFan Room (01-37-6-Q)1JOB$0.00
D-13BGen 1 Intake Filter Room (03-38-0-Q)1JOB$0.00
D-13CSignal Shelter (03-38-1-C)1JOB$0.00
D-14Smoke Stack Deck, Preserve, Full1JOB$0.00$0.00
D-14AFMMR Intake Space (02-46-1-Q)1JOB$0.00
D-14BGT Exhaust (01-49-0)1JOB$0.00
D-14CAMR Intake/Exhaust (02-44-0)1JOB$0.00
D-15Sounding Tube, Replace1JOB$0.00$0.00
D-15ADiesel Service 5-36-2-F1JOB$0.00
D-15BOily Waste Holding, 5-41-1-F1JOB$0.00
D-15CWaste Oil, 5-42-2-F1JOB$0.00
D-15DGas Turbine Oily Waste, 5-45-1-F1JOB$0.00
D-15EGas Turbine Fuel Oil Leak, 5-45-2-F1JOB$0.00
D-15FFwd Oily Waste, 5-49-2-F1JOB$0.00
D-15GAft Oily Waste, 5-59-1-F1JOB$0.00
D-16Permanent Berthing Upgrade1JOB$0.00
D-17MPDE Exhaust Silencer, Install1JOB$0.00
D-18Hanger Bolted Equipment Removal Plate, Install1JOB$0.00
D-19VCHT Room Escape Scuttle and Ladder, Install1JOB$0.00
D-20Deck Covering (Polymeric), Repair and Seal1JOB$0.00
D-21Dual Point Davit, Biennial Maintenance, Perform1JOB$0.00
$0.00$0.00
CLIN 0002 - OPTIONAL WORK ITEMS
Optional items listed below will be awarded if inspection reports reveal the necessity for activation. Evaluation of the options shall not obligate the Government to exercise the option.
Work ItemDescriptionQTYUnitAmount
O-003Tanks (Oily Waste), Preserve (100%)1JOB$0.00$0.00
O-03AOily Waste Holding, 5-41-1-F1JOB$0.00
O-03BWaste Oil, 5-42-2-F1JOB$0.00
O-03CGas Turbine Oily Waste, 5-45-1-F1JOB$0.00
O-03DGas Turbine Fuel Oil Leak, 5-45-2-F1JOB$0.00
O-03EFwd Oily Waste, 5-49-2-F1JOB$0.00
O-03FAft Oily Waste, 5-59-1-F1JOB$0.00
O-04Tanks (Oily Waste), Preserve (Partial)1JOB$0.00$0.00
O-04AOily Waste Holding, 5-41-1-F1JOB$0.00
O-04BWaste Oil, 5-42-2-F1JOB$0.00
O-04CGas Turbine Oily Waste, 5-45-1-F1JOB$0.00
O-04DGas Turbine Fuel Oil Leak, 5-45-2-F1JOB$0.00
O-04EFwd Oily Waste, 5-49-2-F1JOB$0.00
O-04FAft Oily Waste, 5-59-1-F1JOB$0.00Definitive + Optional Total
$0.00$0.00$0.00
COMPOSITE LABOR HOUR RATE (CLHR)
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause entitled “Composite Labor Rate.” Composite Labor Hour Rate - Provide the all inclusive mark-up/loading rate for materials and subcontractors below. This rate will be incorporated into the contract and used on change requests.
Labor Rate Per HourEstimated Quantity**TotalDefinitive + Optional + CLHR Total
$0.002,938$0.00$0.00$0.00
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.

File details come from the government source that posted it. Updated .