ATTACHMENT 1 - Schedule of Supplies - PRICE and DELIVERY FILL IN - Crane Assemblies and Spare Parts.doc

DOC document 483 KB Posted

Attached to
Appleton Marine Single Point Crane Assemblies
Solicitation number
70Z08020R21279B00
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

SCHEDULE OF SUPPLIES/SERVICES

AND DELIVERY SCHEDULE

RFQ 70Z08020R21279B00

NOTE: Pricing is requested on an FOB Destination basis, with shipping included in the unit price. If proposing FOB Origin shipping terms, offeror shall include estimated shipping costs with their proposal.

CLIN = Contract Line Item Number:

(1) PRICING – BASE YEAR:

INVENTORY SUPPLIES:

CLIN
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

UNIT PRICE
TOTAL ESTIMATED COST (UNIT PRICE MULTIPLIED BY EST. QTY)
0001
3950-01-619-5772
Crane Assembly
AMD-1881
2
0002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
0003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
0004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
0005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
0006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
0007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
0008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
0009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
0010
3040-01-612-2516
Valve Isolation
YMD-10446
1
0011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
0012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
0013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
0014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
0015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
0016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
0017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
0018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
0019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
0020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
0021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
0022
5315-01-644-3374
Pin, Cotter
98350A15
20
0023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
0024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
0025
4310-01-495-5609
Breather, HPU
BR110
45
0026
2940-01-359-8346
Filter Element
CCZ3
8
0027
5331-01-455-5688
O-Ring
LF-3814
8
0028
5331-01-585-8090
O-Ring
LFT-1516
6
0029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
0030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
0031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
0032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
0033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
0034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
0035
2940-01-585-8287
Filter, Fluid
8223
6
0036
4940-01-619-6004
Control Console
AMD-1885
1
0037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
0038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
0039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
0040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
0041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
0042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
0043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
0044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

Pricing for CLINS 0045 through 4050A:

OPEN, INSPECT AND REPORT (OIR) - (Represented as a CLIN without “A” following the number; Ex. CLIN 0045):

In accordance with the Statement of Work (SOW) for items for overhaul, contractor shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

OVERHAUL- (Represented as a CLIN with “A” following the number; Ex. CLIN 0045A):

Cost to complete overhaul, after authority to proceed, in accordance with the SOW.

Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each item upon induction for overhaul.

CLIN 0045, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 2 EA = ________________

CLIN 0045A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

158 X __________ X 2 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0045A = ________________ CLIN 0046, NSN 3040-01-581-1046, Hydraulic Cylinder, Jib, P/N 170258B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

CLIN 0046A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

40 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0046A = ________________ CLIN 0047, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 0047A, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

42 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0047A = ________________ CLIN 0048, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 0048A, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

85 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0048A = ________________

CLIN 0049, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 0049A, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

54 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0049A = ________________

CLIN 0050, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 0050A, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

46 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 0050A = ________________

(2) PRICING – OPTION YEAR ONE (1):

INVENTORY SUPPLIES:

CLIN
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

UNIT PRICE
TOTAL ESTIMATED COST (UNIT PRICE MULTIPLIED BY EST. QTY)
1001
3950-01-619-5772
Crane Assembly
AMD-1881
2
1002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
1003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
1004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
1005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
1006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
1007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
1008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
1009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
1010
3040-01-612-2516
Valve Isolation
YMD-10446
1
1011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
1012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
1013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
1014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
1015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
1016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
1017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
1018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
1019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
1020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
1021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
1022
5315-01-644-3374
Pin, Cotter
98350A15
20
1023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
1024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
1025
4310-01-495-5609
Breather, HPU
BR110
45
1026
2940-01-359-8346
Filter Element
CCZ3
8
1027
5331-01-455-5688
O-Ring
LF-3814
8
1028
5331-01-585-8090
O-Ring
LFT-1516
6
1029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
1030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
1031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
1032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
1033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
1034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
1035
2940-01-585-8287
Filter, Fluid
8223
6
1036
4940-01-619-6004
Control Console
AMD-1885
1
1037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
1038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
1039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
1040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
1041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
1042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
1043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
1044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

OPEN, INSPECT AND REPORT (OIR) - (Represented as a CLIN without “A” following the number; Ex. CLIN 0045):

In accordance with the Statement of Work (SOW) for items for overhaul, contractor shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

OVERHAUL- (Represented as a CLIN with “A” following the number; Ex. CLIN 0045A):

Cost to complete overhaul, after authority to proceed, in accordance with the SOW.

Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each item upon induction for overhaul.

CLIN 1045, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 2 EA = ________________

CLIN 1045A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

158 X __________ X 2 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1045A = ________________ CLIN 1046, NSN 3040-01-581-1046, Hydraulic Cylinder, Jib, P/N 170258B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

CLIN 1046A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

40 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1046A = ________________ CLIN 1047, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 1047A, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

42 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1047A = ________________ CLIN 1048, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 1048A, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

85 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1048A = ________________

CLIN 1049, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 1049A, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

54 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1049A = ________________

CLIN 1050, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 1050A, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

46 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 1050A = ________________

(3) PRICING – OPTION YEAR TWO (2):

INVENTORY SUPPLIES:

CLIN
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

UNIT PRICE
TOTAL ESTIMATED COST (UNIT PRICE MULTIPLIED BY EST. QTY)
2001
3950-01-619-5772
Crane Assembly
AMD-1881
2
2002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
2003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
2004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
2005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
2006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
2007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
2008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
2009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
2010
3040-01-612-2516
Valve Isolation
YMD-10446
1
2011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
2012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
2013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
2014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
2015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
2016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
2017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
2018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
2019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
2020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
2021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
2022
5315-01-644-3374
Pin, Cotter
98350A15
20
2023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
2024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
2025
4310-01-495-5609
Breather, HPU
BR110
45
2026
2940-01-359-8346
Filter Element
CCZ3
8
2027
5331-01-455-5688
O-Ring
LF-3814
8
2028
5331-01-585-8090
O-Ring
LFT-1516
6
2029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
2030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
2031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
2032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
2033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
2034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
2035
2940-01-585-8287
Filter, Fluid
8223
6
2036
4940-01-619-6004
Control Console
AMD-1885
1
2037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
2038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
2039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
2040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
2041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
2042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
2043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
2044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

Pricing for CLINS 2045 through 2050A:

OPEN, INSPECT AND REPORT (OIR) - (Represented as a CLIN without “A” following the number; Ex. CLIN 0045):

In accordance with the Statement of Work (SOW) for items for overhaul, contractor shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

OVERHAUL- (Represented as a CLIN with “A” following the number; Ex. CLIN 0045A):

Cost to complete overhaul, after authority to proceed, in accordance with the SOW.

Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each item upon induction for overhaul.

CLIN 2045, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 2 EA = ________________

CLIN 2045A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

158 X __________ X 2 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2045A = ________________ CLIN 2046, NSN 3040-01-581-1046, Hydraulic Cylinder, Jib, P/N 170258B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

CLIN 2046A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

40 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2046A = ________________ CLIN 2047, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 2047A, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

42 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2047A = ________________ CLIN 2048, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 2048A, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

85 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2048A = ________________ CLIN 2049, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 2049A, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

54 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2049A = ________________

CLIN 2050, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 2050A, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

46 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 2050A = ________________

(4) PRICING – OPTION YEAR THREE (3):

INVENTORY SUPPLIES:

CLIN
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

UNIT PRICE
TOTAL ESTIMATED COST (UNIT PRICE MULTIPLIED BY EST. QTY)
3001
3950-01-619-5772
Crane Assembly
AMD-1881
2
3002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
3003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
3004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
3005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
3006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
3007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
3008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
3009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
3010
3040-01-612-2516
Valve Isolation
YMD-10446
1
3011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
3012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
3013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
3014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
3015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
3016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
3017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
3018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
3019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
3020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
3021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
3022
5315-01-644-3374
Pin, Cotter
98350A15
20
3023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
3024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
3025
4310-01-495-5609
Breather, HPU
BR110
45
3026
2940-01-359-8346
Filter Element
CCZ3
8
3027
5331-01-455-5688
O-Ring
LF-3814
8
3028
5331-01-585-8090
O-Ring
LFT-1516
6
3029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
3030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
3031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
3032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
3033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
3034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
3035
2940-01-585-8287
Filter, Fluid
8223
6
3036
4940-01-619-6004
Control Console
AMD-1885
1
3037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
3038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
3039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
3040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
3041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
3042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
3043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
3044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

OPEN, INSPECT AND REPORT (OIR) - (Represented as a CLIN without “A” following the number; Ex. CLIN 0045):

In accordance with the Statement of Work (SOW) for items for overhaul, contractor shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

OVERHAUL- (Represented as a CLIN with “A” following the number; Ex. CLIN 0045A):

Cost to complete overhaul, after authority to proceed, in accordance with the SOW.

Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each item upon induction for overhaul.

CLIN 3045, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 2 EA = ________________

CLIN 3045A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

158 X __________ X 2 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3045A = ________________ CLIN 3046, NSN 3040-01-581-1046, Hydraulic Cylinder, Jib, P/N 170258B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

CLIN 3046A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

40 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3046A = ________________ CLIN 3047, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 3047A, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

42 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3047A = ________________ CLIN 3048, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 3048A, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

85 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3048A = ________________ CLIN 3049, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 3049A, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

54 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3049A = ________________

CLIN 3050, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 3050A, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

46 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 3050A = ________________

(5) PRICING – OPTION YEAR FOUR (4):

INVENTORY SUPPLIES:

CLIN
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

UNIT PRICE
TOTAL ESTIMATED COST (UNIT PRICE MULTIPLIED BY EST. QTY)
4001
3950-01-619-5772
Crane Assembly
AMD-1881
2
4002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
4003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
4004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
4005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
4006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
4007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
4008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
4009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
4010
3040-01-612-2516
Valve Isolation
YMD-10446
1
4011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
4012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
4013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
4014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
4015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
4016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
4017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
4018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
4019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
4020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
4021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
4022
5315-01-644-3374
Pin, Cotter
98350A15
20
4023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
4024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
4025
4310-01-495-5609
Breather, HPU
BR110
45
4026
2940-01-359-8346
Filter Element
CCZ3
8
4027
5331-01-455-5688
O-Ring
LF-3814
8
4028
5331-01-585-8090
O-Ring
LFT-1516
6
4029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
4030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
4031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
4032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
4033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
4034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
4035
2940-01-585-8287
Filter, Fluid
8223
6
4036
4940-01-619-6004
Control Console
AMD-1885
1
4037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
4038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
4039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
4040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
4041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
4042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
4043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
4044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

OPEN, INSPECT AND REPORT (OIR) - (Represented as a CLIN without “A” following the number; Ex. CLIN 0045):

In accordance with the Statement of Work (SOW) for items for overhaul, contractor shall propose the estimated number of labor hours expected to open, inspect and provide a firm, fixed price for the preliminary inspection and submission of a Condition Found Report (CFR) for each item. Note: Loaded hourly rates shall include direct and indirect labor rates, G&A and profit.

OVERHAUL- (Represented as a CLIN with “A” following the number; Ex. CLIN 0045A):

Cost to complete overhaul, after authority to proceed, in accordance with the SOW.

Note: Estimated number of labor hours is provided for evaluation purposes only and the actual hours will be based upon the condition of each item upon induction for overhaul.

CLIN 4045, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 2 EA = ________________

CLIN 4045A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

158 X __________ X 2 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4045A = ________________ CLIN 4046, NSN 3040-01-581-1046, Hydraulic Cylinder, Jib, P/N 170258B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

____________ X __________ X 1 EA = ________________

CLIN 4046A, NSN 3950-01-619-5772, Crane Assembly, P/N AMD-1881

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

40 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4046A = ________________ CLIN 4047, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 4047A, NSN 3040-01-581-1539, Hydraulic Cylinder, Luff, P/N 180149B

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

42 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4047A = ________________ CLIN 4048, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 4048A, NSN 3950-01-641-5484, Winch, Constant Tension, P/N AMD-1899

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

85 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4048A = ________________

CLIN 4049, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 4049A, NSN 4320-01-619-4879, Power Unit, Electro Hyd, HPU, P/N AMD-1884

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

54 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4049A = ________________

CLIN 4050, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OIR:

Est. Number Loaded Est. Annual of Labor Hours Hourly Rate Qty Total Amount

__________ X ____________ X 1 EA = ______________________

CLIN 4050A, NSN 4940-01-619-6004, Control Console, P/N AMD-1885

OVERHAUL:

Est. Number Loaded Est. Annual Of Labor Hours Hourly Rate Qty Total Amount

46 X __________ X 1 EA = ________________

Packaging, Marking, Bar Coding, and preparation for delivery in accordance with the SOW.

1 JOB = ________________

Shipping Charge - (NOTE: Pricing is preferred on FOB Destination basis).

1 JOB = ________________

Total of 4050A = ________________

OFFEROR’S PROPOSED DELIVERY SCHEDULE

Offeror shall insert a delivery time in the column to the right which represents the number of days for receipt of item, after an order has been placed. This delivery schedule will apply to the the base CLIN and also to the corresponding option year CLINS identified in the Schedule of Supplies/Services (ie,..The first CLIN is 0001; the corresponding option year CLINS are 1001, 2001, 3001, and 4001).

INVENTORY SUPPLIES:

CLINS
NSN
DESCRIPTION
P/N OR MODEL NO.
EST. ANNUAL

QTY

DELIVERY DAYS AFTER RECEIPT OF ORDER (ARO)

0001
3950-01-619-5772
Crane Assembly
AMD-1881
2
0002
3950-01-619-9640
Pedestal, W/ID Name Plate
DMD-3235
1
0003
2950-01-581-2575
Swing Drive Hyd Motor
M-017 W/H-B4s/U
1
0004
4030-01-467-1005
Hook, Release
Model APR-356-CBH
20
0005
3010-01-645-3331
Beareing, Turntable
YMD-10355
1
0006
4820-01-580-6130
Hyd Control Manifold
YMD-10366
1
0007
4820-01-581-1079
Counterbalance Valve, Swing Drive
YMD-10369
1
0008
4010-01-580-6079
Wire Rope Assy
YMD-10400
4
0009
5963-01-610-8524
Computer Subassembly
YMD-104371
1
0010
3040-01-612-2516
Valve Isolation
YMD-10446
1
0011
5930-01-610-7723
Switch, Limi, Rotary
YMD-10453
1
0012
5963-01-610-8737
Computer, Sub Assy
YMD-10505
1
0013
5930-01-612-2501
Switch, Inductive Prox
YMD-10506
4
0014
3815-01-630-8145
Fairlead, Sheave 10 inch
YMD-12138
4
0015
3120-01-630-7658
Bearing Sleeve, Snatch Block
100278
1
0016
3040-01-581-1046
Hydraulic Cylinder, Jib
170258B
1
0017
3040-01-581-1539
Hydraulic Cylinder, Luff
180149B
1
0018
5315-01-630-7744
Pin, Straight, Snatch Block
2000229
1
0019
5240-01-586-7621
Bulb, Floodlight
200PAR56/MFL
2
0020
3815-01-630-7810
Fairlead, Sheave, Snatch Block
8031968
4
0021
3815-01-630-8053
Fairlead Sheave, 12 inch
8031969
4
0022
5315-01-644-3374
Pin, Cotter
98350A15
20
0023
3950-01-641-5484
CT Winch Assembly
AMD-1899
1
0024
4320-01-619-4879
Power Unit, Electro Hyd HPU
AMD-1884
1
0025
4310-01-495-5609
Breather, HPU
BR110
45
0026
2940-01-359-8346
Filter Element
CCZ3
8
0027
5331-01-455-5688
O-Ring
LF-3814
8
0028
5331-01-585-8090
O-Ring
LFT-1516
6
0029
4730-01-641-2897
Strainer Element
SS-10-RV3
12
0030
4320-01-610-8872
Pump, Hyd-2 Stage
YMD-10389
1
0031
2910-01-614-6486
Cooler, Tube Bundle
YMD-10399
1
0032
4520-01-614-6170
Heater, Immersion
YMD-10418
1
0033
5840-01-614-6543
Manifold, Relief, Pump Unldg
YMD-10448
1
0034
4730-01-614-6706
Manifold, Cooling
YMD-10449
1
0035
2940-01-585-8287
Filter, Fluid
8223
6
0036
4940-01-619-6004
Control Console
AMD-1885
1
0037
6240-01-585-5875
Lamp, Halogen
YMD-10427-R1
1
0038
6220-12-381-8427
Pilot Light, 24VDC
E3rFB24
1
0039
5935-01-640-6747
Electric Connector Assy
YMD-5956
50
0040
3210-01-441-2443
Bearing Sleeve, Snatch Block
AMD-1136, Item 43
6
0041
531501-538-7928
Pin, Grooved, Headless
WMD-1155
45
0042
4820-01-681-4326
Counterbalance Valve, Swing Drive
YMD-10373
1
0043
5315-01-680-6525
Pin, Cylinder
MMD-4615
6
0044
5315-01-680-6529
Pin, Cylinder
MMD-4616
6

OVERHAUL CLINS:

CLIN*

Description
Est. Qty
Completion
0045a-4050a
Arrival Inspection/Disassembly, Detailed Inspection Report to be provided in accordance with Statement of Work (SOW)/Overhaul Description.
1 Job
Required 10 Calendar Days after receipt of Government Furnished Property (GFP)
0045a
Overhaul Completion in accordance with individual SOW/Overhaul Description and return to SFLC, Baltimore, MD. (QA Inspection is required)
1 Job
_____ Calendar Days after authorization to proceed is given by the Contracting Officer.
0046a
Overhaul Completion in accordance with SOW/Overhaul Description R-556-2043 and return to SFLC, Baltimore, MD. (QA Inspection is required)
1 Job
______ Calendar Days after authorization to proceed is given by the Contracting Officer.
0047a
Overhaul Completion in accordance with SOW/Overhaul Description R-556-2043 and return to SFLC, Baltimore, MD. (QA Inspection is required)
1Job
______ Calendar Days after authorization to proceed is given by the Contracting Officer.
0048a
Overhaul Completion in accordance with individual SOW/Overhaul Description and return to SFLC, Baltimore, MD. (QA Inspection is required)
1 Job
______ Calendar Days after authorization to proceed is given by the Contracting Officer.
0049a
Overhaul Completion in accordance with individual SOW/Overhaul Description and return to SFLC, Baltimore, MD. (QA Inspection is required)
1 Job
_____ Calendar Days after authorization to proceed is given by the Contracting Officer.
0050a
Overhaul Completion in accordance with individual SOW/Overhaul Description and return to SFLC, Baltimore, MD. (QA Inspection is required)
1 Job
_____ Calendar Days after authorization to proceed is given by the Contracting Officer.
0045a – 0050a
Beyond Economical Repair (BER)

assets

1 EA
Disposition instructions will be provided by the Contracting Office after submission of Inspection Report

File details come from the government source that posted it. Updated .