Attachment (1) Schedule of Supplies.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- USCGC HAMILTON DS FY21 FYQ3
- Solicitation number
- 70Z08521QP4544600
About this file
This document contains a schedule of supplies and services for a solicitation issued by the Department of Homeland Security United States Coast Guard. The solicitation seeks bids to provide all labor, materials, and equipment except as specified to perform services aboard the USCGC HAMILTON, including cleaning and inspecting potable water tanks, fire extinguishing systems, exhaust piping, ventilation ducting, replacing tank sounding tubes and installing mast darken ship switches. The schedule lists definite and optional work items with quantities, units and pricing to be provided by bidders. It also requires a composite labor hour rate to be used for pricing all contract changes. The response deadline is not stated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bids
| Solicitation No.: 70Z08521QP4544600 | |||||
| USCGC HAMILTON (WMSL 753) Dockside FY21 FYQ3 | |||||
| Attachment (1) - Schedule of Supplies and Services | |||||
| Provide all labor, materials, and equipment, except as specified, to perform the services identified in Attachment (2) REV-1 dtd 23 September 2020 | |||||
| CLIN 0001 - DEFINITE WORK ITEMS | |||||
| These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item. | |||||
| Work Item | Description | QTY | Unit | Amount | |
| D-001 | Tanks (Potable Water), Clean and Inspect | 1 | JOB | $0.00 | |
| D-004 | Fire Extinguishing System (Galley Grease), Inspect And Test | 1 | JOB | $0.00 | |
| D-005 | Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect And Test | 1 | JOB | $0.00 | |
| D-006 | Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test | 1 | JOB | $0.00 | |
| D-007 | Water Mist Fire Extinguishing System, Inspection | 1 | JOB | $0.00 | |
| D-008 | Cargo Handling Elevator, Annual Inspection and Test, Perform | 1 | JOB | $0.00 | |
| D-009 | Deck Covering (Slip-Resistant), Renew | 1 | JOB | $0.00 | |
| D-010 | Main Propulsion Diesel Engine, Exhaust Piping, Commercial Clean | 1 | JOB | $0.00 | |
| D-011 | Propulsion Gas Turbine, Exhaust Piping, Clean & Inspect | 1 | JOB | $0.00 | |
| D-012 | Watertight Hatch (RWTH 01-21-1), Renew | 1 | JOB | $0.00 | |
| D-013 | Ventilation Ducting, Clean and Inspect | 1 | JOB | $0.00 | |
| D-014 | Tank Sounding Tube, Replace | 1 | JOB | $0.00 | |
| D-015 | Mast Darken Ship Switches (Watertight Door and Scuttle), Install | 1 | JOB | $0.00 | |
| D-016 | Intake Ventilation System, Modify | 1 | JOB | $0.00 | |
| D-017 | Potable Water Shore Tie, Modify | 1 | JOB | $0.00 | Running Total |
| D-018 | Tenting, Provide | 1 | JOB | $0.00 | |
| $0.00 | $0.00 |
| CLIN 0002 - OPTIONAL WORK ITEMS | |||||
| Optional items listed below will be awarded if inspection reports reveal the necessity for activation. Evaluation of the options shall not obligate the Government to exercise the option. | |||||
| Work Item | Description | QTY | Unit | Amount | |
| O-002 | Tanks (Potable Water), Preserve "Partial" | 1 | JOB | $0.00 | Running Total |
| O-003 | Refrigeration System Rupture Disks, Leak Test | 1 | JOB | $0.00 | |
| $0.00 | $0.00 |
| COMPOSITE LABOR HOUR RATE | |||
| The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause entitled “Composite Labor Rate.” Composite Labor Hour Rate - Provide the all inclusive mark-up/loading rate for materials and subcontractors below. This rate will be incorporated into the contract and used on change requests. | |||
| Labor Rate Per Hour | Estimated Quantity** | Total | Running Total |
| $0.00 | 1,750 | $0.00 | $0.00 |
| **NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required. |
File details come from the government source that posted it. Updated .