Attachment 1 Schedule of Supplies and Services.xls
XLS spreadsheet 62 KB Posted
- Attached to
- USCGC GASCONADE and Barge for dry dock repairs
- Solicitation number
- 70Z085-21-Q-P4524800
About this file
This combined synopsis and solicitation requests quotes for dry dock repairs of a Coast Guard river buoy tender and barge. The contractor shall provide all necessary facilities, labor, materials, services, and equipment to perform various repairs in accordance with the attached specifications. Repair categories include hull plating, appendages, tanks, propulsion components, deck equipment, and preservation work. Quotes are due by January 7, 2021 with award anticipated on January 20, 2021. The performance period is scheduled from May 11 to July 20, 2021 at the contractor's dry dock facility. The requirement is unrestricted and issued under FAR Part 12 for commercial items with a small business size standard of 1,250 employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 CGC GASCONADE DD.pdf | ||
| Attachment 2 Work Specification.pdf | ||
| Attachment 4 Request for Clarification.docx | DOCX document | |
| Attachment 6 Redacted J and A.pdf | ||
| S1 12 Combined Synopsis Sol GASCONADE DD.doc | DOC document | |
| Attachment 3 Past Performance Information Form.doc | DOC document | |
| Attachment 5 USCG Ombudsman Notice.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC GASCONADE (WLR-75C) DRYDOCK AVAILABILITY FY2021 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Inspect - Tender | JOB | 1 | $0.00 | |
| D-003 | U/W Body, Preserve (100%) - Tender | JOB | 1 | $0.00 | |
| D-004 | Hull Plating Freeboard, Preserve “100%” - Tender | JOB | 1 | $0.00 | |
| D-005 | Appendages (U/W), Leak Test - Tender | JOB | 1 | $0.00 | |
| D-006 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| O-007 | Appendages (U/W) - Internal, Preserve - Tender | JOB | 1 | $0.00 | |
| D-008 | Tanks (MP Fuel Service), Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-010 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable Renew | JOB | 1 | $0.00 | |
| O-012 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| D-013 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | |
| O-014 | Propeller, Perform Minor Repairs and Reconditioning | JOB | 1 | $0.00 | |
| D-015 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-016 | Keel Coolers, Clean, Inspect and Hydro - Tender | JOB | 1 | $0.00 | |
| D-017 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-018 | Sea Valves and Waster Pieces, Renew - Tender | JOB | 1 | $0.00 | |
| D-019 | Sea Strainers (All Sizes), Renew - Tender | JOB | 1 | $0.00 | |
| D-020 | Rudder Assembly; Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-021 | Rudder(s), Preserve (“100%”) | JOB | 1 | $0.00 | |
| D-022 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-023 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-024 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-025 | Sewage Holding Tank(s), Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| O-026 | Tanks (Sewage Holding), Preserve “Partial” - Tender | JOB | 1 | $0.00 | |
| D-027 | Cathodic Protection, Magnesium Anodes, Renew, - Tender | JOB | 1 | $0.00 | |
| D-028 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-029 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-030 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-031 | Hull Plating (Side Scan), Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| D-032 | Hull Plating (U/W Body), Inspect - Barge | JOB | 1 | $0.00 | |
| D-033 | U/W Body, Preserve (100%) - Barge | JOB | 1 | $0.00 | |
| D-034 | Hull Plating Freeboard, Preserve “100%” - Barge | JOB | 1 | $0.00 | |
| D-035 | Appendages (U/W), Leak Test - Barge | JOB | 1 | $0.00 | |
| O-036 | Appendages (U/W) - Internal, Preserve - Barge | JOB | 1 | $0.00 | |
| D-037 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect - Barge | JOB | 1 | $0.00 | |
| D-038 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-039 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-040 | Sea Valves and Waster Pieces, Renew - Barge | JOB | 1 | $0.00 | |
| D-041 | Sea Strainers - Duplex (All Sizes), Renew - Barge | JOB | 1 | $0.00 | |
| D-042 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-043 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-044 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-045 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-046 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-047 | Cathodic Protection, Magnesium Anodes, Renew, - Barge | JOB | 1 | $0.00 | |
| D-048 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-049 | Temporary Services, Provide - Barge | JOB | 1 | $0.00 | |
| D-050 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-051 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-052 | Anti-Ventilation Underwater Hull Strakes, Installation | JOB | 1 | ||
| O-053 | Hull and Structural Plating (General) - 10.2-Pound Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-054 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-055 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Tender | JOB | 1 | $0.00 | |
| O-056 | Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Tender | JOB | 1 | $0.00 | |
| O-057 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-058 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-059 | Hull and Structural Plating (General) - 20.4-Pound Steel Plate, Renew - Barge | JOB | 1 | $0.00 | |
| O-060 | Lead Dust, Clean | JOB | 1 | $0.00 | |
| O-061 | Lead-Based Paint and Asbestos-Containing Material, Perform Spot Abatement | JOB | 1 | ||
| D-062 | Crews Shower, Repair | JOB | 1 | ||
| D-063 | Hull Plating, Repair | JOB | 1 | ||
| D-064 | Exhaust Stack, Repair | JOB | 1 | ||
| D-065 | PW Pump Foundation, Repair (Barge) | JOB | 1 | ||
| D-066 | Fire Pump Foundation, Repair (Barge) | JOB | 1 | ||
| D-067 | Gaylord Hood, Repair | JOB | 1 | ||
| D-068 | Chill Water Piping Insulation, Renew | JOB | |||
| D-069 | Sewage Tank Vent, Renew | JOB | 1 | ||
| D-070 | Urinal Drain Pipe, Renew | JOB | 1 | ||
| D-071 | Deck Plating, Repair | JOB | 1 | ||
| D-072 | Deck Equipment, Install - Barge | JOB | 1 | ||
| D-073 | Lead-Based Paint, Perform Partial Abatement - Barge | JOB | 1 | ||
| D-074 | Potable Water Piping, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1040 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(10/19/2020)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | ||||||||||||||||||||||||
| Assumed G&A Factor | ||||||||||||||||||||||||
| Assumed Profit Factor | Direct Labor | Direct Material/Subs Cost | ||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
File details come from the government source that posted it. Updated .