Attachment 1 Schedule of Services.xls
XLS spreadsheet 49 KB Posted
- Attached to
- USCGC JOHN MCCORMICK Unplanned Drydock Repairs Federal contract opportunity
- Solicitation number
- 70Z08022QPBPL0033
About this file
This document contains an attachment with a pricing schedule and statement of work for unplanned drydock repair services for the USCGC JOHN MCCORMICK. The attachment lists line items for maintenance, repair, and engineering support with unit prices. A composite labor rate table is also included based on location. The statement of work calls for repairs from November 9, 2021 to January 5, 2022 in accordance with restrictions requiring work within 250 nautical miles of the cutter's homeport for crew and vessel safety to meet operational requirements. The solicitation is for the Department of Homeland Security Coast Guard for unplanned drydock repairs to the USCGC JOHN MCCORMICK as outlined in the attachment. Pricing and performance periods are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Statement of Work.pdf | ||
| RFQ 70Z08022QPBPL0033.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | ||||||
| USCGC JOHN F. MCCORMICK (WPC-154) UNPLANNED AVAILABILITY FY2022 | ||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | AFC |
| D-001 | MDE, Renew | JOB | 1 | $0.00 | 45 | |
| D-002 | Temporary Services, Provide | JOB | 1 | $0.00 | 45 | |
| O-00A | Composite Labor Rate | Hour | 0 | 0 | ||
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | ||
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
&C(10/7/2021) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .