Attachment 1 - Schedule of Services - Blank USCGC Blue Shark DS.xls
XLS spreadsheet 67 KB Posted
- Attached to
- USCGC Blue Shark Dockside FY2027
- Solicitation number
- 70Z08026QPBPL0043
About this file
This is a Schedule of Services pricing template for dockside maintenance and repair services on the USCGC Blue Shark (WPB-87360) during FY2027. The document establishes a structure for contractors to provide unit pricing and extended costs for six definite work items and optional open and inspect repair services.
The definite items (D-001 through D-006) include assessment of watertight closures, thermographic inspection of electrical power distribution systems (450 VAC and below), cleaning and inspection of engine room ventilation fan assemblies, HVAC ducting cleaning, upgrade of the 24VDC distribution system, and renewal of interior deck covering systems and jointer decks. All definite items are priced on a job basis. Additional line items address composite labor rates (calculated at 0 hours), a GFP report submission requirement, and travel and per diem expenses. Open and inspect repair work is structured with two CLINs: one for labor at 168 hours with a composite labor rate to be determined, and a second for material markup and handling fees expressed as a percentage of material costs (with a base reference of $6,480.00). The cost estimate breakdown section provides labor categories including engineers, technicians, machinists, pipe fitters, electricians, shipfitters, welders, fireswatch personnel, insulators, painters, and general laborers, with assumed G&A and profit factors of 15 percent and 10 percent respectively. The template includes geographic labor rate adjustments for 28 shipyard locations, ranging from $45 (New Orleans) to $67 per hour (San Diego).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BLUE SHARK (WPB-87360) DOCKSIDE AVAILABILITY FY2027 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Watertight Closures, Assess | JOB | 1 | $0.00 | |
| D-002 | Electrical Power Distribution System, Thermographic Inspection, 450 VAC And Below | JOB | 1 | $0.00 | |
| D-003 | Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Ducting, HVAC System, Clean | JOB | 1 | $0.00 | |
| D-005 | 24VDC Distribution System, Upgrade | JOB | 1 | $0.00 | |
| D-006 | Interior Deck Covering System And Jointer Deck, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | $0.00 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | 1 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| OA/G-001 | **Provide breakdown, as follows: | Hour | 168 | $0.00 | |
| Labor Rate | |||||
| Unit Price: $________; Quantity: 168; Unit of Issue: Hour; Extended Price: $____________ | |||||
| OA/G-002 | Material Markup/Handling Fee | $6,480.00 | Percent | $0.00 | |
| Unit Price: $6,480.00; Quantity: 1; Unit of Issue: Percent ________%; | |||||
| Extended Price: [$6,480.00 X percentage quoted]: $______________ | |||||
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 |
&C(5/22/2026) Rev-0 - Page &P of &N Contractors will enter material markup/handling fee here.
Contractor will enter the composite labor rate here
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .