This document contains a price schedule and statement of work for a federal solicitation for dockside repairs on the USCGC SENECA in fiscal year 2024. The contractor shall provide all labor, materials, equipment, and services to perform dockside repairs on the cutter from May 29, 2024 to July 24, 2024 according to the specification. The price schedule includes line items for various repair and maintenance tasks such as cleaning heat exchangers and tanks, overhauling equipment, and renewing piping, decking, and other components. It also includes optional and over and above items that may be added via contract modification, such as a growth labor rate and material markup fee. The solicitation is identified as number 70Z08024QMECP0016 and is issued by the Department of Homeland Security United States Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 70Z08024QMECP00160003.pdf | ||
| COMBINED SYNOPIS SENECA DS FY24 70Z08024QMECP0016 REV3.pdf | ||
| Amendment 70Z08024QMECP00160002.pdf | ||
| COMBINED SYNOPIS SENECA DS FY24 70Z08024QMECP0016 REV2.pdf | ||
| COMBINED SYNOPIS SENECA DS FY24 70Z08024QMECP0016 REV1.pdf | ||
| Amendment 70Z08024QMECP00160001.pdf | ||
| COMBINED SYNOPIS SENECA DS FY24 70Z08024QMECP0016 1.30.24.pdf | ||
| Attachment 2 Statement of Work Specification.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
USCGC SENECA (WMEC-270B) DOCKSIDE AVAILABILITY FY2024
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | Type | AFC |
| D-001 | Flexible Couplings, Renew | JOB | 1 | RWI | 45 | ||
| D-002 | Seawater Heat Exchangers, Clean, Inspect And Hydro | JOB | 1 | RWI | 45 | ||
| D-003 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | 1 | RWI | 45 | ||
| D-004 | Lube Oil Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | RWI | 45 | ||
| D-005 | Chill Water System, Clean and Flush | JOB | 1 | RWI | 45 | ||
| D-006 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | 1 | RWI | 45 | ||
| D-007 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | 1 | RWI | 45 | ||
| D-008 | Steering Gear, General, Overhaul | JOB | 1 | RWI | 45 | ||
| D-009 | Fin Stabilizers (General), Inspect and Repair | JOB | 1 | RWI | 45 | ||
| D-010 | Appleton FB 20-21 Single Point Davit (SPD), Renew | JOB | 1 | RWI | 45 | ||
| D-011 | Sewage Discharge and Transfer Pumps, Renew | JOB | 1 | RWI | 45 | ||
| D-012 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | RWI | 45 | ||
| D-013 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | RWI | 45 | ||
| D-014 | Sewage Piping, Clean and Flush | JOB | 1 | RWI | 45 | ||
| D-015 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | 1 | RWI | 45 | ||
| D-016 | 400 Hz Motor-Generator Set Controller, Replace | JOB | 1 | TCTO | 45 | ||
| D-017 | Point of Use Potable Water Filters, Install | JOB | 1 | TCTO | 45 | ||
| D-018 | Fantail Embarkation Station & Stantions, Modify | JOB | 1 | TCTO | 45 | ||
| D-019 | Watertight Doors and Scuttles, Internal, DC Deck and Below, Renew | JOB | 1 | CSMP | 45 | ||
| D-020 | Piping Insulation, Renew | JOB | 1 | CSMP | 45 | ||
| D-021 | Deck Covering, Interior, Wet and Dry, Renew | JOB | 1 | CSMP | 45 | ||
| D-022 | AMS 1 Deck Plating, Renew | JOB | 1 | CSMP | 45 | ||
| D-023 | Watertight Doors and Scuttles, External, Renew | JOB | 1 | CSMP | 45 | ||
| D-024 | Remote Operated Valve Cover, Renew | JOB | 1 | CSMP | 45 | ||
| D-025 | Deck Fittings, Renew | JOB | 1 | CSMP | 45 | ||
| D-026 | Temporary Services, Heating and Cooling | JOB | 1 | RWI | 45 | ||
| D-027 | Hot Water Accumulator Tank, Replace | JOB | 1 | CSMP | 45 | ||
| D-028 | Deep Freeze Door and Insulation, Renew | JOB | 1 | CSMP | 45 | ||
| O-029 | Tanks, Grey Water Holding, Preserve, Partial | JOB | 1 | RWI | 45 | ||
| O-030 | Tanks (Sewage Holding), Preserve, Partial | JOB | 1 | RWI | 45 | ||
| O-00A | Composite Labor Rate | Hour | 1 | 0 | |||
| D-00B | GFP Report | NSP | EA | NSP | |||
| D-00C | Travel and Perdiem | JOB | $0.00 | ||||
| Total Price of Definite Items | $0.00 | ||||||
| Total Price of Option Items | $0.00 | ||||||
| Total Price of Definite and Optional Items | $0.00 |
| Over and Above/Growth Work | |
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |
| OA/G-001 | **Provide breakdown, as follows: |
Over and Above/Growth Labor Rate
| Unit Price: $________; Quantity: 1270 ; Unit of Issue: Hour; Extended Price: $____________ | Hour | 1270 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee |
Unit Price: $50,000.00; Quantity: 1; Unit of Issue: Percent ________%;
| Extended Price: [$50,000.00 X percentage quoted]: $______________ | $ 50,000.00 | |
| Total Price of Over and Above/Growth | ||
| THE FOLLOWING RATE USED FOR GROWTH WORK: | ||
| Layday | Daily Rate |