Attachment 1 Schedule of Services Blank Price Schedule.xls
XLS spreadsheet 44 KB Posted
- Attached to
- DOCKSIDE: USCGC DILIGENCE DOCKSIDE REPAIRS FY26 Federal contract opportunity
- Solicitation number
- 70Z08026QMECP0015
About this file
This is a blank pricing schedule for dockside repair services on the USCGC DILIGENCE (WMEC-210A) during Fiscal Year 2026. The schedule contains 26 definite line items and 5 optional line items covering maintenance, inspection, cleaning, repair, and replacement work across various vessel systems and components. Definite items include chain locker cleaning and inspection, fuel and water tank servicing, propulsion shaft alignment checks, ventilation duct cleaning, anchor chain inspection and repair, ammunition elevator service, gear lube oil strainer replacement, flow meter replacement, anchor windlass overhaul, galley and structural piping renewal, weather deck and interior steel plating renewal, fan space repairs, and flexible coupling replacement. Optional items include partial preservation of chain lockers, dirty oil and waste tanks, and potable water tanks. The schedule also includes provisions for composite labor rates (item D-00A), GFP reporting (item D-00B), travel and per diem (item D-00C), and laydays at a rate of $0.00 per day for five days (item O-00Z).
The pricing structure establishes unit prices for labor and materials that will apply throughout the contract period and any growth work issued via modification. Contractors must fill in composite hourly labor rates, material markup/handling fees as a percentage, and provide evaluated pricing for over-and-above growth work based on 858 hours of labor and a $33,108.00 material cost baseline. The performance period spans July 1, 2026 through August 25, 2026, with the U.S. Coast Guard contract specialist identified as Petal Donald (Petal.C.Donald@uscg.mil). All pricing shown is currently blank at $0.00, indicating this is a template awaiting contractor quotes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Statement of Work Specification.pdf | ||
| Combined Synopsis Solicitation CGC DILIGENCE 70Z08026QMECP0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC DILIGENCE (WMEC-210A) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Voids, Accessible, Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | $0.00 | |
| D-008 | Vent Ducts, Engine Room, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-009 | Vent Ducts, Galley, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-010 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-011 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-012 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | $0.00 | |
| O-013 | Chain Lockers, Preserve, Partial (Optional) | JOB | 1 | $0.00 | |
| D-014 | Ammunition Elevator, Service and Inspect | JOB | 1 | $0.00 | |
| D-015 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-016 | Reduction Gear Lube Oil Strainer Assembly, Replace | JOB | 1 | $0.00 | |
| D-017 | Flow Meter (Aviation fuel), Replace (A-Class) | JOB | 1 | $0.00 | |
| D-018 | Anchor Windlass, Overhaul | JOB | 1 | $0.00 | |
| O-019 | Tanks, Dirty Oil and Waste, Preserve, Partial (Optional) | JOB | 1 | $0.00 | |
| D-020 | Galley Piping, Renew | JOB | 1 | $0.00 | |
| D-021 | Ground Tackle Components, Renew | JOB | 1 | $0.00 | |
| D-022 | Weather Deck Plating, Renew | JOB | 1 | $0.00 | |
| D-023 | Interior Steel Structural Plating, Renew | JOB | 1 | $0.00 | |
| D-024 | Fan Space, Repair | JOB | 1 | $0.00 | |
| O-025 | Tanks (Potable Water), Preserve "Partial" (Optional) | JOB | 1 | $0.00 | |
| D-026 | Flexible Couplings, Renew | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 858 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $33,108.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |