Attachment 1 Schedule of Services Blank Price Schedule.xls
XLS spreadsheet 44 KB Posted
- Attached to
- DOCKSIDE: USCGC RESOLUTE DS FY24 Federal contract opportunity
- Solicitation number
- 70Z08024QMECP0019
About this file
This document provides details for a federal contract solicitation to perform dockside repairs to the USCGC RESOLUTE. The solicitation number is 70Z08024QMECP0019 and is being issued by the Department of Homeland Security US Coast Guard. The contractor will be required to provide all necessary facilities, materials, equipment, and personnel to perform dockside repairs to the CGC RESOLUTE in accordance with Specification for Dockside Repairs FY2024, REV-0, dated 07 December 2023. The period of performance for the repair work is specified as 12 June 2024 through 06 August 2024. An attachment to the document is a blank price schedule for responding contractors to provide pricing details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Statement of Work Specification.pdf | ||
| COMBINED SYNOPIS RESOLUTE DS1 FY24 70Z08024QMECP0019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC RESOLUTE (WMEC-210B) DOCKSIDE AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Flexible Couplings, Renew | JOB | |||
| D-002 | Seawater Heat Exchangers, Clean, Inspect And Hydro | JOB | |||
| D-003 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | |||
| D-004 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | |||
| D-005 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | |||
| D-006 | Lube Oil Heat Exchangers; Clean, Inspect And Hydro | JOB | |||
| D-007 | Chill Water System, Clean and Flush | JOB | |||
| D-008 | Boilers, Renew | JOB | |||
| D-009 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | |||
| D-010 | Hot Water Accumulator Tanks, Clean and Inspect | JOB | |||
| D-011 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | |||
| D-012 | Steering Gear, General, Overhaul | JOB | |||
| D-013 | Single Point Davit, Inspect and Service | JOB | |||
| D-014 | Sewage Discharge and Vacuum Pumps, Renew | JOB | |||
| D-015 | Grey Water Holding Tanks, Clean and Inspect | JOB | |||
| D-016 | Sewage Holding Tanks, Clean and Inspect | JOB | |||
| D-017 | Sewage Piping, Clean and Flush | JOB | |||
| O-018 | Tanks, Grey Water Holding, Preserve, Partial | JOB | |||
| O-019 | Tanks (Sewage Holding), Preserve, Partial | JOB | |||
| D-020 | Emergency Diesel Generator (EDG) Fuel Oil Tank, Modify | JOB | |||
| D-021 | Oily Water Separator, Replace | JOB | |||
| D-022 | Ventilation Ducting and Equipment, Renew | JOB | |||
| D-023 | Deck and Bulkhead Plating, Renew | JOB | |||
| D-024 | Bridge Window And Equipment, Renew | JOB | |||
| D-025 | Deck Covering, Electrical Matting, Renew | JOB | |||
| D-026 | Piping Insulation, Renew | JOB | |||
| D-027 | Privacy Curtains, Install | JOB | |||
| D-028 | Tanks, MP Fuel Stowage and Overflow, Clean, Inspect and Repair | JOB | |||
| D-029 | Deck Covering and Coaming, Renew | JOB | |||
| D-030 | Potable Water Piping, Renew | JOB | |||
| D-031 | Steam Piping, Renew | JOB | |||
| D-032 | Fire Pumps, Replace | JOB | |||
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 1460 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $50,000.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(11/29/2023) Draft-1 - Page &P of &N
File details come from the government source that posted it. Updated .