Attachment 1 Schedule of Services_Blank Price Schedule.xls
XLS spreadsheet 56 KB Posted
- Solicitation number
- 70Z08021QPV104000
About this file
This document contains a pricing schedule and statement of work for a scheduled dry-dock availability solicitation issued by the US Coast Guard. The solicitation seeks services for various maintenance and repairs to the USCGC SEA FOX, including structural analysis, hull preservation, tank cleaning and inspection, engine realignment, shaft and bearing renewal, generator replacement, and modifications to bilge systems and stern doors. The period of performance is from March 10, 2021 to May 12, 2021. Pricing is solicited for defined line items on a unit price basis. The schedule also provides labor rates and assumptions for growth work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: CONTRACTOR NAME | ||||||
| USCGC SEA FOX (WPB-87) DRYDOCK AVAILABILITY FY2021 | ||||||
| 70Z080-21-Q-PV104000 | ||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | AFC |
| D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | $0.00 | 80 | |
| D-002 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $0.00 | 80 | |
| O-003 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | $0.00 | 80 | |
| D-004 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | 80 | |
| D-005 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | 80 | |
| D-006 | Tank, Dirty Oil, Clean and Inspect | JOB | 1 | $0.00 | 80 | |
| D-007 | Tank, Oily Water, Clean and Inspect | JOB | 1 | $0.00 | 80 | |
| D-008 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | 80 | |
| D-009 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | $0.00 | 80 | |
| D-010 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | $0.00 | 80 | |
| D-011 | Mast, Preserve (“100%”) – Contractor Interference Removal | JOB | 1 | $0.00 | 80 | |
| O-012 | Main Engine/Reduction Gear, Realign | JOB | 1 | $0.00 | 80 | |
| D-013 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | 80 | |
| D-014 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | $0.00 | 80 | |
| O-015 | Intermediate Bearing Carriers, Renew | JOB | 1 | $0.00 | 80 | |
| O-016 | Aft Bearing Carriers, Renew | JOB | 1 | $0.00 | 80 | |
| D-017 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | 80 | |
| O-018 | Propellers, Renew | JOB | 1 | $0.00 | 80 | |
| D-019 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | 80 | |
| D-020 | Speed Log, Skin Valve, Renew | JOB | 1 | $0.00 | 80 | |
| D-021 | Sea Water System, Perform Maintenance | JOB | 1 | $0.00 | 80 | |
| D-022 | Rudder Assemblies, Renew | JOB | 1 | $0.00 | 80 | |
| D-023 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | 80 | |
| D-024 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | $0.00 | 80 | |
| D-025 | Drydock | JOB | 1 | $0.00 | 80 | |
| D-026 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | 80 | |
| D-027 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | 80 | |
| D-028 | Bilge Zinc(s), Remove | JOB | 1 | $0.00 | TCTO 80 | |
| D-029 | Main Mast, Modify | JOB | 1 | $0.00 | TCTO 80 | |
| D-030 | Ship Service Diesel Generator Sets (SSDG’s), Replace | JOB | 1 | $0.00 | TCTO 80 | |
| D-031 | Propulsion Shaft and Shaft Seals, Replace | JOB | 1 | $0.00 | TCTO 80 | |
| D-032 | Pilothouse-To-Mast Multi-Cable Transit, Renew | JOB | 1 | $0.00 | 80 | |
| D-033 | Stern Door Cross Connect Valves Modify | JOB | 1 | $0.00 | TCTO 80 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Contract Value | $0.00 | |||||
| THE FOLLOWING RATES USED FOR GROWTH WORK | ||||||
| Composite Labor Rate | Hourly Rate | |||||
| Temporary Services, Provide - Cutter | Daily Rate | |||||
| Layday | Daily Rate |
&C(8/27/2020) Draft-3 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .