Attachment_1-_Schedule_of_Items-Price_Schedule.pdf
PDF 115 KB Posted
- Attached to
- Exemption Area Manual Cut and Pile - 2025
- Solicitation number
- 140L3625Q0081
About this file
The document is a Schedule of Items/Price Schedule for the Exemption Area Manual Cut and Pile - 2025 federal contract opportunity (Solicitation #140L3625Q0081) from the Department of the Interior Bureau of Land Management. The solicitation covers manual cutting and piling services across three treatment areas: PeeDee Gulch, Sheeptail Gulch, and Deadman, totaling 133 acres of forest management work.
The pricing schedule defines two treatment levels: Level I (0-30% crown closure) and Level III (31-60% crown closure), with work to be performed on multiple units in each area. All units have a slope under 45 percent, and contractors are explicitly instructed that piles are not to be covered. The solicitation is structured as a "Bid All or Nothing" opportunity, requiring bidders to quote prices for the entire project across all units. Pricing details are to be filled in by the bidder, with unit prices to be determined based on the specific treatment level and acreage for each designated unit.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: 140L3625Q0081
Schedule of Items/Price Schedule
Exemption Area Manual Cut and Pile - 2025
Item Number
Description Treatment
Area Estimated
Acres Unit Price Total Price
PeeDee Gulch
General (Thin and Pile) Level III
Unit 1 28 $ $
General (Thin and Pile) Level III
Unit 2 10 $ $
General (Thin and Pile) Level III
Unit 3 24 $ $
General (Thin and Pile) Level III
Unit 4 3 $ $
Sheeptail Gulch
General (Thin and Pile) Level I
Unit 4 10 $ $
General (Thin and Pile) Level I
Unit 10 35 $ $
Deadman General (Thin and Pile) Level I
Unit 1 7 $ $
General (Thin and Pile) Level III
Unit 2 10 $ $
General (Thin and Pile) Level I
Unit 3 6 $ $
Total acres
Total Quote $ (Bid All or nothing)
General (Thin and Pile) Level I - Crown closure of material to be hand thinned and piled is estimated to be from 0 percent to 30 percent total cover. Slope is under 45 percent.
(IMPORTANT: Piles are not to be covered.)
General (Thin and Pile) Level III - Crown closure of material to be hand thinned and piled is estimated to be from 31 percent to 60 percent total cover. Slope is under 45 percent.
(IMPORTANT: Piles are not to be covered.)
File details come from the government source that posted it. Updated .